21 Table 6: BNI Efficient Product Rebates p. p. 18
21 Table 6: BNI Efficient Product Rebates BNI EFFICIENT PRODUCT REBATES (2024) BNI Efficient Product Rebates Energy Savings (GWh) Demand Savings (MW) Expenditure ($ million) Unit Cost ($/kWh) 2024 Plan 35.3 6.7 7.4 0.21 2024 MCA Target 39....

AI summary Table 6 outlines the BNI Efficient Product Rebates program's performance metrics for 2024, including energy and demand savings, expenditures, and unit costs. The 2024 Plan targets 35.3 GWh energy savings and $7.4 million expenditure, while the MCA Target aims for 39.7 GWh. Actual YTD 2024 figures show 25.8 GWh saved and $5.6 million spent, with unit costs fluctuating between $0.21 and $0.24 per kWh.

5 Table 8: Direct Installation p. p. 21
5 Table 8: Direct Installation DIRECT INSTALLATION (2024) Direct Installation Energy Savings (GWh) Demand Savings (MW) Expenditure ($ million) Unit Cost ($/kWh) 2024 Plan 12.2 2.5 6.6 0.54 2024 MCA Target 10.6 2.6 6.5 0.62 2024 Year-End Fo...

AI summary The 2024 Direct Installation program is projected to slightly underperform its mid-course adjusted energy and demand savings targets, with expenditures slightly exceeding the adjusted budget. Year-to-date actuals show energy savings of 5.9 GWh and demand savings of 1.2 MW, with unit costs at $0.67 per kWh.

Date Filed: November 25, 2024 Page 27 of 30 p. p. 31
Date Filed: November 25, 2024 Page 27 of 30 ENABLING STRATEGIES Q3 2024 ACTIVITY HIGHLIGHTS • Two DSMAG sessions on developing an optimal cost-effectiveness test (benefit-cost analysis). • A revised report by Energy Futures Group was distr...

AI summary The document outlines key activities related to the Enabling Strategies and DSMAG in Q3 2024, including sessions on cost-effectiveness testing, a revised report on benefit-cost analysis, and the development of the 2026-2030 DSM Plan. It also mentions the request for comments on various DSM-related reports.

96567NSUARB (EOne) IR - 1 to 7 2 passages
Request IR-2:
Request IR-2: - The original forecast for first-year energy savings in the 2024 plan for the Existing Residential Programs was set at 58.8 GWh with an associated investment of $22.5 million. Mid-course adjustments reduced the energy saving...

AI summary The Existing Residential Programs' energy savings forecast decreased from 58.8 GWh to 43.2 GWh between 2024 plan stages, while costs increased from $22.5 million to $22.7 million. Unit costs per kWh of savings rose from $0.38 to $0.53. The request seeks explanations for the cost increase despite lower savings and factors driving the rising unit cost, linking these to program efficiency.

Request IR-4:
Request IR-4: - The Residential Behaviour Program was initially forecast to achieve 29.8 GWh in savings at a cost of $2.2 million, but this was revised mid-year to 8 GWh at $2.7 million, and the year-end projection now shows 4.4 GWh at $2....

AI summary The Residential Behaviour Program's energy savings dropped from 29.8 GWh to 4.4 GWh, with costs rising from $2.2 million to $2.5 million. The request seeks explanations for the reduced savings, increased cost per GWh, and how participant engagement impacts program effectiveness.

96938Board Letter re: accepted as filed 1 passage
Section 1 p. p. 0
March 7, 2025 [[email protected]](mailto:[email protected]) James R. Gogan McInnes Cooper 300-292 Charlotte Street Sydney, NS B1P 1C7 Dear Mr. Gogan: M11983 – EfficiencyOne 2024 Q3 Demand Side Management (DSM) Repor...

AI summary EfficiencyOne submitted its Q3 2024 Demand Side Management (DSM) report, achieving 33.2 GWh energy savings and 5.8 MW peak demand savings at a cost of $14.5 million. The report's unit cost exceeded the mid-course adjustment target. The Board accepted the report but invited further questions, with unresolved issues to be addressed by EfficiencyOne or referred to the Board.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →