Conclusion In conclusion the preliminary data suggests that out of these two options the most cost effective approach would be to install a dedicated wood pole electrode line near the existing transmission line in identified high risk zone...
AI summary The preliminary data suggests installing a dedicated wood pole electrode line near existing transmission lines in high-risk zones is the most cost-effective solution, with estimated costs of $313,379.68/km plus $560,000. Further analysis of assumptions, PLS-CADD options, and constructability implications is recommended.