N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB)
19 passages
Appendix C – Operating Maintenance and General Expense 5 Year Forecast Appendix D – Credit Rating Reports Appendix E - Dr. Roger A. Morin Exhibits Appendix F – Load Forecast Report Appendix G - Cost of Service Study Appendix H - Proposed T...
AI summary The document outlines various appendices related to a regulatory proceeding, including operating maintenance forecasts, credit rating reports, load forecasts, cost of service studies, proposed tariffs, and regulation changes.
1.0 INTRODUCTION 2 3 4 1 Nova Scotia Power Inc. (NSPI) is applying for new electricity rates based on a test year beginning January 1, 2007. Two key factors bring about this request: 5 1. High fuel prices and increased volumes; 7 6 2. The...
AI summary Nova Scotia Power Inc. (NSPI) is requesting new electricity rates due to increased fuel prices and the need to recover previously approved expenses. NSPI emphasizes the impact of volatile fuel costs on its financial health and the importance of recovering these costs to maintain stability and credit ratings.
1.6 Requested Adjustment To Rates 3 4 5 1 2 NSPI' s revenue requirement in 2007 is $1 ,197.6 million, which reflects increased fuel costs and the recovery of previously approved but deferred tax and depreciation costs. Based on current rat...
AI summary NSPI is requesting a 7.5% average revenue increase for 2007 due to increased fuel costs, deferred tax and depreciation recovery, and other expenses. They seek UARB approval for new rates effective April 1, 2007, and a true-up for the ELIIR-2 real time pricing mechanism.
Increased Commodity Costs Higher prices for oil, natural gas and solid fuels make up the majority of the increased commodity costs in the commodity pricing category. Heavy fuel oil (HFO) prices are the most significant contributor to this...
AI summary The document discusses increased commodity costs, primarily driven by higher oil, natural gas, and solid fuel prices, with heavy fuel oil being the most significant contributor. NSPI's 2007 solid fuels costs are higher due to the expiration of a 2006 coal disallowance and changes in fuel mix and pricing.
1 2.4 Fuel Testimony of NSPI 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 Like all utilities and customers, NSPI is experiencing the effects of world market forces on its fuel costs. In 2007, NSPI is facing an i...
AI summary NSPI is experiencing increased fuel costs in 2007, which impact its financial health and the reliability of the electricity system. The company adopts evidence from Energy Ventures Analysis and outlines its fuel procurement strategy, mix of generating capacity, and fuel forecast methodology, including topics such as oil and gas, solid fuel, renewable energy, and load growth effects.
Point Tupper Marine Terminal The Point Tupper Marine Terminal (PTMT) began commercial operation in January 2005 and with the commissioning of the E-Crane 39 mid year, had discharged the first gearless bulk vessel in August 2005. The PTMT h...
AI summary The Point Tupper Marine Terminal (PTMT) provides NSPI with cost savings through reduced freight rates and eliminated rail transportation costs. It also allows NSPI to charter gearless bulk vessels, access new coal supply basins, and test new solid fuels. The Board did not include the PTMT in the rate base in 2006, and NSPI is still evaluating whether to sell the terminal or include it in its rate base.
Section 21 Taxes Amortization In the 2005 Rate Decision, the UARB approved the deferral of Section 21 taxes and stated: After considerable reflection, the Board finds that amortization of the s.21 taxes should be deferred for two years (20...
AI summary The UARB approved the deferral of Section 21 taxes for two years, followed by an 8-year amortization period starting in 2007. This approach was deemed reasonable for ratepayers and NSPI, ensuring intergenerational equity. NSPI developed an amortization schedule based on the UARB's directive, with $14.5 million amortized in 2007.
Transfer from Customer Operations and Information Technology 9 10 11 12 13 14 Due to reallocation of responsibilities and associated costs from other areas, Customer Service will see increased costs of $1.3 million. Transferred Customer Op...
AI summary Customer Service costs are expected to increase by $1.3 million due to the reallocation of responsibilities and associated costs from other areas, including $700,000 from transferred Customer Operations costs and $600,000 from the Information Technology group's IVR system costs.
20 21 22 23 24 The remainder of OM&G costs represents corporate adjustments and credits for overhead costs that are allocated either to capital projects or to specific business unit OM&G accounts. In 2007 corporate adjustments will increas...
AI summary The text discusses corporate adjustments and overhead costs, noting an increase in 2007 due to higher pension expenses and capital spending, partially offset by applied overheads and lower payroll costs. Corporate adjustments include payroll costs, capital overhead contributions, and pension expenses.
Business Risk To the extent that budgeted forecasts are made prior to regulatory determination of its rates, NSPI's principal source of business risk is forecasting risk. Potential deviations from expected profitability can occur due to un...
AI summary NSPI faces significant business risks due to forecasting inaccuracies, economic cycles, weather variability, and competition from alternative energy sources. These factors contribute to volatility in revenue and operating income, particularly due to high fixed costs and exposure to coal price fluctuations.
3 7.1 Overview 4 5 6 7 8 9 Peak demand and customer energy requirements have a significant effect on the costs associated with running NSPI. Growth in peak demand can affect fixed costs over the long-term, while growth in electric energy c...
AI summary The document discusses how peak demand and customer energy requirements significantly impact NSPI's costs, with growth in peak demand affecting long-term fixed costs and increased energy consumption raising variable operating costs, particularly fuel costs. Accurate load forecasting is essential for determining future costs and allocating them by customer class in the cost-of-service model.
8.0 COST OF SERVICE 2 3 1 8.1 Overview 4 5 6 7 8 9 In the development of new rates, revenue-to-cost ratios are an important consideration. These are determined using NSPI's Cost of Service Study (COSS) which the Company has prepared for th...
AI summary The document discusses updates to NSPI's Cost of Service Study (COSS) in response to UARB directives, including methodology changes, the development of a replacement rate for ELIIR, adjustments to cost bases for Additional Energy and Unrnetered classes, and updates to street light rates and their components.
8.3 Direct Expenses Associated with BMPC's "Additional Energy" In the process of determining the appropriate costs of serving each rate class, the COSS assigns direct expenses associated with serving BTL classes. One of the BTL classes is...
AI summary The document discusses the correction of direct expenses for BMPC's 'Additional Energy' portion of their load, shifting from a marginal cost basis to the Interruptible Rider cost basis, which reduced fuel costs by $5.2 million. This change aligns with the UARB's 2004 ruling allowing BMPC to choose the Interruptible Rider rate.
8.4 Cost of Serving the Unmetered Class percentage for 2007. 10 11 12 In its 2006 Rate Decision94 , the UARB also directed NSPI to review the cost of serving the Unrnetered Class, specifically with respect to: 13 14 • The "C-3 factor", whi...
AI summary The document discusses the 2006 Rate Decision by the UARB, which directed NSPI to review the cost of serving the Unmetered Class. It highlights the need to update the 'C-3 factor', reassess street light assets in the rate base, and conduct an updated street light cost study. Adjustments to capital, power and energy, and maintenance costs are outlined.
8.5 Summary The COSS methodology remams the same as previously approved by the Board. Changes in structure are as follows: - The COSS methodology now uses average rate base rather than year-end; - There has been a modification to the A TL...
AI summary The Cost of Service Study (COSS) methodology remains unchanged, but structural modifications include using average rate base, adjusting ATL class structure with ELIIR-2, separating transmission costs for 138,000 volts and above, correcting BMPC's Additional Energy load costs, and reducing Unmetered class customer service costs.
11 9.2.3 Mersey System Rate 12 13 14 15 17 18 19 20 This rate is based on the Mersey Agreement. The rate is forecast based on budgeted costs used for billing throughout the year, and is adjusted at year-end with a thirteenth bill or credit...
AI summary The Mersey System Rate is based on the Mersey Agreement and is forecast using budgeted costs, with adjustments made at year-end via a thirteenth bill or credit. A portion of energy sold includes 'Additional Energy,' with customers able to choose between the GRLF rate or the Large Industrial Interruptible Rider price.
22 9.3 Above-The-Line Classes 23 24 25 26 27 28 29 30 Rates for the A TL classes are allocated based on the forecast embedded cost of service for each class and are designed to provide revenues that will recover those costs within a range...
AI summary The document discusses the allocation of rates for Above-The-Line (ATL) classes based on forecasted embedded costs and revenue requirements. It highlights the revenue shortfall and proposed rate increases for ATL classes, noting that most of NSPI's customers are billed under these rates. The revenue-to-cost ratios and the process for allocating revenue responsibilities are also outlined.
12 11.2 Ql Fuel Deferral 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 In this Application, NSPI seeks new rates effective April 1, 2007. With a filing in early October, 2006 the hearing processes will no...
AI summary NSPI seeks to defer the increased 2007 fuel expenses for the first quarter of 2007, estimating the cost at $18.3 million. The deferral would allow recovery of these costs over a twelve-month period starting in 2008, ensuring NSPI can maintain its allowed return. Failure to recover these costs could have a significant financial impact on the company.
15 11.3 2P-RTP Deferral 16 17 18 19 20 21 22 23 The UARB Decision in the ELIIR-2 proceeding (P-883) offers the option of a new Two Part Real Time Pricing rate (2P-RTP) to customers in the ELIIR-2 customer class. A key issue in the proceedi...
AI summary The UARB Decision in the ELIIR-2 proceeding introduced a 2P-RTP rate with limitations to ensure cost neutrality. NSPI requests a true-up of unrecovered fuel expenses due to potential mismatches between credits/debits and actual fuel costs, ensuring NSPI can achieve its allowed return.
N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB)
24 passages
Appendix G Cost of Service Study REDACTED
AI summary The provided document is a placeholder or cover page for Appendix G, which contains the Cost of Service Study. No substantive information, arguments, or data are presented in this specific chunk.
1.1 Overview The overall objective of a cost of service analysis is to determine the costs associated with serving each class of customer, and to identify any inter-class inequities that may be present with regard to over or under contribu...
AI summary The text outlines the objectives and methodology of a Cost of Service Study (COSS). The primary goal is to determine the costs associated with each customer class and identify inter-class inequities based on revenue/cost ratios. It details the process of accumulating financial and operating data, allocating costs (including operating expenses, depreciation, and taxes) based on direct assignment or functional responsibility (production, transmission, distribution, and retail), and categorizing costs into demand, energy, customer, and revenue components.
Functionalization The first step in the cost analysis is the functionalization of plant and expenses into the functional groups of production, transmission, distribution and retail. From the books and records of the Company, net plant inve...
AI summary The text describes the initial stage of the cost analysis process, which involves functionalizing plant investments and expenses into four categories: production, transmission, distribution, and retail. While net plant investment and operation and maintenance expenses for production, transmission, and distribution are easily identifiable from the Company's records, certain components of plant, depreciation, and other expenses are not. These specific items must undergo a functionalization process before they can be classified and allocated.
Allocation The fourth and final step is the allocation procedure. This step involves applying the allocation factors, determined in step 3, to the classified plant and operating expenses from step 2, to determine the overall cost assigned...
AI summary The text describes the final step of a cost allocation procedure within a Cost of Service Study. This process involves applying specific allocation factors to classified plant and operating expenses to determine the total cost assigned to each service class for a test period. The document references several exhibits detailing rate base analyses, operating costs, depreciation, revenue analysis, allocation factors, and sales/demand data to support the proposed rate structure.
1.2.1 Rate Base Exhibit 2 contains the net plant investment in the various asset categories, allowance for working capital and allowance for materials and supplies. In keeping with the Board's decision from the 2005 Rate Application, dated...
AI summary The document describes the methodology for determining and allocating the rate base for the proceeding. It identifies specific components included in the net plant investment, such as construction work in progress (CWIP), deferred charges, and allowances for working capital and materials. The text outlines the process for calculating allocation factors across customer classes based on energy sales, customer numbers, and demand contributions, utilizing both coincident and non-coincident peak demands and load factors.
1.2.2 Operating Expense The analysis of operating costs begins in Exhibit 4 with functionalization. In this step total operating costs are grouped according to production, transmission, distribution, retail and direct. The "Direct Expenses...
AI summary The document describes the methodology for functionalizing and allocating operating expenses within a Cost of Service Study. Operating costs are first grouped into functional categories (production, transmission, distribution, retail, and direct) and then sub-grouped into demand, energy, and customer costs. The analysis specifically details how costs like depreciation, interest, and corporate taxes are assigned to functions, and how demand-related costs are allocated using 3CP demand allocators.
NOVA SCOTIA POWER INC. SUMMARY OF REVENUE TO EXPENSE RECOVERY RATIOS 2007 I lc_u_s_To_M_ER_C_L_As_s P_R_E_s_E_N~TI I PROPOSED DOMESTIC 98.23 99.01 SMALL GENERAL 101.51 100.78 GENERAL 109.30 105.07 LARGE GENERAL 97.44 99.14 SMALL INDUSTRIAL...
AI summary The document provides a summary of the revenue to expense recovery ratios proposed by Nova Scotia Power Inc. for various customer classes. It compares historical data from 2007 with the current proposed figures. The table details recovery percentages for various categories including Domestic, Small General, General, Large General, and several Industrial categories, as well as Municipal and Unmetered customers, showing a total recovery target of 100.00%.
FUNCTIONALIZATION OF AVERAGE RATE BASE (1) TOTAL (2) (3) (4) (5) (6) DIRECT COMPANY GENERATION TRANSMISSION DISTRIBUTION RETAIL CAPITAL PRODUCTION PLANT ( 1) STEAM $1,052,506 $1,052,506 $0 $0 $0 $0 ( 2) HYDRO 258,158 240,242 0 0 0 17,916 (...
AI summary The document presents a detailed functionalization of the average rate base, categorizing assets into generation, transmission, distribution, and retail components. It provides a breakdown of specific production plants (steam, hydro, wind, gas turbines), transmission infrastructure, and distribution assets such as poles, fixtures, and substations. Additionally, the table accounts for working capital, deferred charges (including financing, taxes, and pensions), and asset retirement obligations (ARO), culminating in a total average rate base of approximately $2,772,240.
CLASSIFICATION OF RATE BASE (1) (2) (3) (4) INITIAL CLASSIFICATION DEMAND ENERGY CUSTOMER TOTAL RELATED RELATED RELATED COMPANY PLANT PLANT PLANT RETAIL FUNCTION DISTRIBUTION PLANT: ( 1) SERVICES 0 0 0 0 ( 2) METERS Q Q Q Q ( 3) TOTAL RETA...
AI summary The document presents a table detailing the initial classification of the rate base for the retail function. It categorizes costs into Demand Related, Energy Related, and Customer Related plant components, as well as Working Capital and Deferred Charges/Credits. The total average rate base is calculated as $2,754,194, with specific breakdowns for various retail plant services, meters, general property plant, and deferred charge financing, taxes, and pensions.
CLASSIFICATION OF AVERAGE RATE BASE INITIAL R/B CLASSIFIC ATION FURTH ER CLASSIFICA ATION FULLY CLASSIFIED RATE BASE DEMAND ENERGY CUSTOMER DEMAND ENERGY CUSTOMER DEMAND ENERGY CUSTOMER PLANT PLANT PLANT PLANT PLANT PLANT PLANT PLANT PLANT...
AI summary The document provides a detailed financial breakdown of the average rate base, specifically focusing on the classification of various generation assets and working capital components. It outlines the transition from initial demand and energy plant figures to fully classified rate base values. Key assets included are steam, hydro, wind, and gas turbine plants, alongside working capital items such as fuel cash, materials, and deferred charge financing and taxes.
ALLOCATION OF AVERAGE RATE BASE (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALLOCAT...
AI summary The document provides a detailed breakdown of the allocation of the average rate base across various customer classes, including Domestic, Small General, General, General Large, Small Industrial, Medium Industrial, Large Industrial, Extra Large Interruptible, Municipal, Unmetered, and other categories. It itemizes costs associated with generation functions (including steam, hydro, wind, and gas plants), transmission functions, working capital, and various deferred charges and credits, such as Asset Retirement Obligations (ARO) and pension costs.
ALLOCATION OF AVERAGE RATE BASE (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL INTERR 2 MUNICIPAL UNMETE...
AI summary The document presents a detailed table outlining the allocation of the average rate base for a utility company. It breaks down costs into transmission plant assets (over 69kV), general property plant, and working capital components such as cash, materials, supplies, and deferred charges (financing, tax, pension, and other). The allocation factors are categorized by customer classes, including Domestic, General, Large, Industrial, Municipal, and Unmetered, as well as specific categories for Interr 2 and Extra Large loads.
ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL (7) MEDIUM INDUSTRIAL INDUSTRIAL INDUSTRIAL (8) LARGE (9) EXTRA L1 INTERR 2 (10) MUNICIPAL (11) UNMETERED...
AI summary The document presents a detailed table illustrating the allocation of the average distribution rate base across various customer classes in Nova Scotia. It breaks down costs associated with infrastructure components—such as land, easements, substations, poles, fixtures, and lines—for categories including Domestic, Small General, General, General Large, Small, Medium Industrial, Large, Municipal, and Unmetered customers. The table provides specific dollar amounts and allocation factors (e.g., P-1, P-2, D-1) to demonstrate how distribution costs are distributed among different service types.
FOR THE YEAR ENDING DECEMBER 31 , 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL PLANT (2) PRIMARY DEMAND (3) PRIMARY CUSTOMER (4) SECONDARY DEMAND (5) SECONDARY CUSTOMER ( 1) TOTAL NET POLE COST $134,571 ( 2) PRIMARY ONLY (30%) 40,371 $40,371 $...
AI summary The document presents a financial table detailing the 'Total Net Pole Cost' for the year ending December 31, 2007, totaling $134,571,000. It provides a breakdown of these costs across different categories, including Primary Demand, Primary Customer, Secondary Demand, and Secondary Customer. The data distinguishes between 'Primary Only' costs and '50% Joint' costs for both primary and secondary segments, illustrating the allocation of pole-related expenses.
ALLOCATION OF AVERAGE POLE INVESTMENT (1) TOTAL PLANT (2) PRIMARY DEMAND (3) PRIMARY CUSTOMER (4) SECONDARY DEMAND (5) SECONDARY CUSTOMER ( 1) DOMESTIC $94,253 $36,707 $21 ,238 $15,056 $21 ,251 ( 2) SMALL GENERAL 5,727 2,422 1,155 994 1,15...
AI summary The document presents a table detailing the allocation of average pole investment across different customer classes. It breaks down total plant costs into primary and secondary demand and customer categories, specifically distinguishing between domestic, small general, general, general large, small industrial, medium industrial, industrial large, municipal, and unmetered categories. The table includes specific allocation factors (D-2, C-5, D-1, C-4) to determine how costs are distributed among these segments.
ALLOCATION OF OPERATING EXPENSES (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA Ll INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALLOCA...
AI summary The document presents a detailed table outlining the allocation of operating expenses across various customer classes, including Domestic, Small General, General, General Large, Small Industrial, Medium Industrial, Large Industrial, Extra Large Interconnect, Municipal, Unmetered, and other categories. It breaks down costs for generation and transmission components, including fuel, purchased power, operations and maintenance, grants in lieu, depreciation, interest net of AFUDC, preferred dividends, and corporate taxes. The table also accounts for non-operating revenues, returns (profit/loss), and specific riders like the Interr. Rider DMD Adj. and ELIIR-2 adjustments.
NOVA SCOTIA POWER INC. ALLOCATION OF OPERATING EXPENSES (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA Ll INTERR 2 (10) MUNICIPAL (11...
AI summary The document presents a detailed table of Nova Scotia Power Inc.'s operating expenses, categorized by energy classification and customer segment. It breaks down costs for fuel, purchased power (fixed and variable), operations and maintenance (including steam and hydro), depreciation, interest net of AFUDC, preferred dividends, and corporate taxes. The table also accounts for non-operating revenue from export sales and identifies specific allocation factors for various customer classes ranging from domestic to large industrial.
ALLOCATION OF DISTRIBUTION OPERATING EXPENSES (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA Ll INTERR 2 (10) MUNICIPAL (11) UN METER...
AI summary The document presents a detailed table outlining the allocation of distribution operating expenses across various customer classes, including Domestic, Small General, General, General Large, Small Industrial, Medium Industrial, Large Industrial, Extra Large Industrial, Municipal, Unmetered, and others. It provides specific dollar amounts and allocation factors for these categories, categorized by various project or cost components (referenced as P-1, P-2, D-1, etc.). The data serves to illustrate how operating costs are distributed among different user groups.
ALLOCATION OF DEPRECIATION EXPENSES (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION F...
AI summary The document provides a detailed breakdown of depreciation expenses allocated across various demand classifications, including small general, general, industrial (small, medium, large), extra large interruptible, municipal, unmetered, and other categories. It specifies costs associated with different utility functions: generation (steam, hydro, wind, gas turbine, and general property), transmission (plants under and over 69kV), and distribution. Specific allocation factors and demand classifications are provided for each functional area to determine the cost distribution across customer segments.
REVENUE ANALYSIS (1) (2) (3) LATE (4) MISC. REVENUE EXPORT SALES PAYMENT CHARGE CUSTOMER REVENUE ELECTRIC REVENUE ( 1) DOMESTIC $524,839 $3,231 $2,902 $2,078 ( 2) SMALL GENERAL 30,167 183 88 127 ( 3) GENERAL 252,840 1,802 647 15 ( 4) LARGE...
AI summary The document provides a detailed breakdown of revenue components for a regulatory proceeding, categorized into electric revenue, non-rate revenue, and direct revenue. It quantifies earnings across various customer classes, including domestic, small general, general, large general, and various industrial categories. The analysis also accounts for export sales, late payment charges, miscellaneous customer revenue, and specific direct revenue streams such as the Bowater Basic Block and Real Time Pricing. The total revenue is reported as $1,096,633, adjusted for retained earnings.
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (...
AI summary The document presents a detailed data table for Nova Scotia Power Inc. regarding the development of allocation factors for the year ending December 31, 2007. It breaks down costs and demand across various customer classes, including Domestic, Small General, General, Large Industrial, and others. Key metrics include Pole & Wire investment demand and customer costs, substation investment demand, meter investment costs, and general plant demand, along with the corresponding percentage of responsibility for each class.
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31 , 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL...
AI summary The document presents a detailed breakdown of Nova Scotia Power Inc.'s allocation factors for the year ending December 31, 2007. It provides a comprehensive table detailing the distribution of the rate base, generation and distribution operating expenses, and transmission operating expenses across various customer classes, including Domestic, Small General, General, General Large, and various Industrial categories. The data highlights the percentage of responsibility for each cost component relative to the total company costs.
NOVA SCOTIA POWER INC. DETAIL OF MONTHLY CLASS COINCIDENT KW DEMAND FOR THE YEAR ENDING DECEMBER 31 , 2007 MONTH (1 ) TOTAL (2) COMPANY DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUST. (7) MEDIUM INDUST. (8) LARGE...
AI summary The document provides a detailed breakdown of Nova Scotia Power Inc.'s monthly coincident kilowatt (kW) demand for various customer classes during the year ending December 31, 2007. It includes specific monthly data for classes such as Domestic, Small General, General, and various Industrial categories. Additionally, it presents a summary of demand-related expenses, engineering-related expenses, unit costs, customer-related expenses, operating expenses, total rate revenue, and the percentage of revenue to expenses for several key customer classes.
REVENUE TO EXPENSE COMPARISON (1) TOTAL (2) TOTAL (3) UNIT COST (4) TOTAL (5) (6) (7) DMD.RELATED EXPENSES ENG.RELATED EXPENSES ENG.RELATED ( C I kW.h) CUST.RELATED EXPENSES TOTAL OPER. EXPENSES TOTAL RATE REVENUE %REVENUE TO EXPENSES ( 1)...
AI summary The document presents a detailed revenue to expense comparison table for various customer classes, including Domestic, Small General, General, Large General, Small Industrial, Medium Industrial, Large Industrial, Extra Large Interconnect 2, Municipal, and Unmetered. The data breaks down expenses into DMD-related, ENG-related (including unit costs), and Customer-related categories. It calculates the total operating expenses against total rate revenue to determine the percentage of revenue to expenses, showing a balanced total of 100% across the combined categories.
N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB)
27 passages
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side ofthe substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a ca...
AI summary The document outlines special conditions for utility service, specifically regarding metering and transformer ownership. It stipulates that metering typically occurs on the low voltage side of the substation; however, if a customer requires primary metering, they must provide a capital contribution to cover the additional costs compared to secondary metering. Furthermore, it establishes that customers requesting non-standard service provisions may be required to own the transformer normally provided by the Company.
SPECIAL CONDITIONS: (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a cap...
AI summary The document outlines special conditions regarding metering locations and associated costs. It specifies that metering is typically located on the low voltage side of a substation. If a customer requires primary metering, they must provide a capital contribution to cover the additional costs over secondary metering. It also establishes specific percentage adjustments (reductions or increases of 1.75%) for meter readings based on whether the substation high voltage side is 69 kV or higher.
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...
AI summary The document outlines special conditions regarding metering and transformer ownership for customers with specific requirements. It specifies that metering is typically located on the low voltage side of the substation; however, if primary metering is required, the customer must provide a capital contribution for the additional costs. It also notes a 1.75% adjustment to metered kilowatt-hour usage for high-voltage side metering. Additionally, the Company may require customers to own transformers for non-standard service provisions.
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...
AI summary The document outlines special conditions for a specific utility tariff. It specifies that metering typically occurs on the low voltage side of the substation; however, if a customer requires primary metering, they must provide a capital contribution covering the additional costs relative to secondary metering. Furthermore, it establishes a 1.75% reduction in metered kWh usage for high-voltage side metering and grants the Company the right to withdraw the tariff from customers who do not maintain a minimum billing demand of 250 kV.A (225 KW).
SPECIAL CONDITIONS: - (1) At the option of the Company, supply may be at distribution voltage. Meter readings shall be increased by 1.75% for each transformation between the meter and the low voltage side of the bulk power supply transform...
AI summary The document outlines special conditions for a specific utility tariff, primarily addressing metering and transformer loss adjustments. It specifies that meter readings will be increased by 1.75% for each transformation between the meter and the low voltage side of a bulk power supply transformer to account for losses. It also mandates that customers requiring primary metering must provide a capital contribution for the additional costs. Finally, it establishes eligibility criteria, stating the Company may withdraw the tariff if a customer fails to maintain a regular demand of 2,000 kVA or 1,800 kW.
SPECIAL CONDITIONS: - (1) At the option ofthe Company, supply may be at distribution voltage. Meter readings shall be increased by 1.75% for each transformation between the meter and the low voltage side of the bulk power supply transforme...
AI summary The document outlines special conditions for a specific electricity tariff, primarily focusing on metering and transformer loss adjustments. It specifies that meter readings will be adjusted by 1.75% for each transformation between the meter and the low-voltage side of the bulk power supply transformer. Additionally, it mandates that customers requiring primary metering must make a capital contribution for the extra costs. Finally, it establishes eligibility criteria, stating the Company may withdraw the tariff if a customer fails to maintain a minimum demand of 2,000 kVA or 1,800 kW.
INTERRUPTIBLE RIDER TO THE LARGE INDUSTRIAL TARIFF (Rate Code 25) Customers who qualify for interruptible service will receive a $3.43 per month per kilovolt ampere reduction in demand charge for billed interruptible demand. The billed int...
AI summary The text outlines the financial structure of the Interruptible Rider for the Large Industrial Tariff (Rate Code 25). Customers eligible for interruptible service receive a monthly credit of $3.43 per kilovolt-ampere (KVA) for billed interruptible demand. This demand is calculated as the difference between contracted firm demand and total billing demand, provided the billing demand is less than the contracted firm demand. The calculation for billed interruptible demand considers the maximum interruptible demand of the current month or specific months from the previous eleven-month period.
AVAILABILITY: This rider will be available to a minimum regular billing demand of 2 000 k V .A at 90% Power Factor, under the following terms and conditions: - (1) The customer has provided written notice of his desire to take service unde...
AI summary The text outlines the availability and operational requirements for a specific rate rider for customers with a minimum regular billing demand of 2,000 kVA at a 90% Power Factor. It establishes terms for customers seeking interruptible load, requiring written notice, a 10-minute response time for load reduction requests, and company approval for service restoration. It also specifies penalty charges for non-compliance and notice periods for converting between firm and interruptible service rates.
ENERGY CHARGE The energy rate, in cents per kWh, will be calculated annually based on NSPI's budgets. The calculation will utilize the following formula and will be consistent with approved accounting and costing procedures. \left[ \left(...
AI summary The document outlines the methodology for calculating the energy rate in cents per kWh, which is based on Nova Scotia Power Inc.'s annual budgets. It provides a specific mathematical formula incorporating the Energy Portion of Base Load Fixed Costs, Annual Base Load Energy at an 85% Capacity Factor, Base Load Variable Costs, Base Load Energy Production, and adjustments for Loss and Export Benefits Credit. The rate is set at 5.390 cents per kW.h for the 2006 calendar year.
- a) Determine the expected system load factor for the year for which the ELIIR is being calculated. - b) Apply this system load factor to the Large Industrial Interruptible Rider to determine a cost per kWh. - c) Determine the ELIIR in ce...
AI summary The text outlines a multi-step methodology for calculating and adjusting the ELIIR (Electricity Load Interruptible Rider) and its associated Load Factor Adjustments (LFA). The process involves determining the expected system load factor, applying it to the Large Industrial Interruptible Rider to find a cost per kWh, and using polynomial curve fitting to align the ELIIR with the LFA. This procedure is intended for annual application to adjust the LFA values within a specific table.
Loss Adjustment: A 2% adjustment is included in the Energy Charge to account for system losses. The Loss Adjustment will be calculated annually.
AI summary The document specifies that a 2% adjustment is incorporated into the Energy Charge to account for system losses. This Loss Adjustment is scheduled to be calculated on an annual basis.
Export Benefits Credit (EBC) ($/MWh): The Export Benefits Credit is the expected customer energy requirement under this rate divided by the adjusted Company energy requirement, multiplied by the total margin on export sales divided by the...
AI summary The text provides the formulaic definition for the Export Benefits Credit (EBC), which is a component of the rate design. The credit is calculated by taking the ratio of the expected customer energy requirement to the adjusted Company energy requirement, then multiplying that figure by the ratio of the total margin on export sales to the expected sales (MWh) to the customer under the specific rate.
Expected customer energy requirement Total margin on export sales ffiC = X Adjusted Company Energy Requirement Expected sales (MWh) to the customer under this rate Where:
AI summary The provided text is a technical excerpt from a regulatory filing defining the variables and components for calculating the 'Adjusted Company Energy Requirement' and 'Total margin on export sales.' It establishes the mathematical basis for determining the expected energy requirements and sales volumes for a specific customer under a proposed rate structure.
Minimum Energy Charge: If the Customer Load Factor is below the minimum specified in the Load Factor Adjustment table in a given billing period, the customer will be billed under the Interruptible Rider to the Large Industrial Rate.
AI summary The document specifies the billing procedure for customers whose Customer Load Factor falls below the minimum threshold defined in the Load Factor Adjustment table. In such instances, the customer is transitioned to being billed under the Interruptible Rider associated with the Large Industrial Rate for that billing period.
8. Penalties for Failure to Interrupt for Supply Reasons: Failure of the customer to comply in whole or in part with any Supply Interruption request will result in penalty charges. The penalty charge for each failure shall be twice the cos...
AI summary The document outlines the penalty structure for customers who fail to comply with Supply Interruption requests. If a customer fails to interrupt, they will be charged a penalty equal to twice the cost of the appropriate billing for the total load subscribed under that rate and the energy used for that specific month. The penalties apply to each failure, including instances where the customer fails to respond to subsequent calls within the same month.
9. Buy-Through Option for Economic Interruptions: If the customer is unable to comply with any Economic Interruption request, the energy that is not interrupted as requested by the Company shall be billed at a Buy-Through Rate. The buy thr...
AI summary The text outlines the 'Buy-Through Option for Economic Interruptions' for customers under a specific rate. If a customer cannot comply with an energy interruption request made by Nova Scotia Power Inc. (NSPI), the non-interrupted energy is billed at a 'Buy-Through Rate.' This rate is calculated monthly based on the estimated fuel cost of peaking combustion turbines, a heat rate of 15,000 BTU/kWh, and a $5/MWh fixed component. NSPI commits to balancing interruption hours among customers under this rate.
EXTRA LARGE INDUSTRIAL INTERRUPTIBLE TARIFF If the customer elects the Buy-Through Option, the customer will be billed for the energy requested on a take-or-pay basis at the buy-through rate. If a Supply Interruption is requested while the...
AI summary The document outlines the billing and operational conditions for the Extra Large Industrial Interruptible Tariff, specifically regarding the 'Buy-Through Option.' Customers who select this option are billed for requested energy on a take-or-pay basis at the buy-through rate. However, the document specifies that if a customer requests a Supply Interruption while utilizing the Buy-Through-Rate during an Economic Interruption, the Buy-Through option is voided, and the standard processes and penalties for a Supply Interruption are subsequently applied.
18. Metering Costs: Metering will normally be at the low side of the transformer and meter readings will be increased by 1.75%. Should the customer's requirements make it necessary for the Company to provide primary metering, the customer...
AI summary The Board approved a provision regarding metering costs, specifying that metering is typically located on the low side of the transformer with a 1.75% reading increase. If a customer's requirements necessitate primary metering instead of secondary metering, the customer must provide a capital contribution for the additional costs. Furthermore, any special metering or communication systems required for a customer to take service under the specific rate must be paid for by the customer as a capital contribution.
AHLS Base Cost (AHLSbc) This is the total monthly charge (in dollars), calculated by applying the customer's qualifying alternative rate ("QAR") to the unaltered billing determinants from the Annual Hourly Load Shape. This pre-determined c...
AI summary The text defines the Annual Hourly Load Shape Base Cost (AHLSbc), which is a pre-determined monthly charge for customers on qualifying alternative rates (QAR). Unlike energy charges, the AHLSbc is payable regardless of actual energy consumption during a billing period. It is calculated by applying the customer's QAR to the unaltered billing determinants of the Annual Hourly Load Shape, which includes both demand charges and energy charges based on the full 8760 (or 8784) hour load shape.
TWO PART REAL TIME PRICING TARIFF Projections of the anticipated hourly energy price (week ahead and day ahead) will be provided to the customer according to the following schedule: - By midnight each day, hourly price forecasts for each h...
AI summary The document outlines the notification and billing procedures for the Two Part Real Time Pricing (2P-RTP) tariff. It specifies that hourly energy price forecasts for the upcoming seven days must be provided to customers by midnight each day, with immediate notification of major changes. Furthermore, it establishes that the actual price applied for billing is the marginal cost forecast provided 20 minutes prior to each hour.
Decremental Shift Rebate The Decremental Shifted Load (DSL) each hour, is multiplied by the marginal price, adjusted for losses, in that hour, and summed to produce the Decremental Shift Rebate (DSR).
AI summary The document defines the calculation methodology for the Decremental Shift Rebate (DSR). The rebate is determined by multiplying the Decremental Shifted Load (DSL) for each hour by the marginal price (adjusted for losses) during that specific hour, and then calculating the sum of these values.
Incremental Export Benefit Credit Customers who take service under this rate will be given an Incremental Export Benefit Credit (IEBC) defined as follows: IEBC = (Lesser of Customer's Monthly DSL or NSPI' s Actual Exports calculated monthl...
AI summary The text defines the calculation for the Incremental Export Benefit Credit (IEBC) for customers under a specific rate. The credit is calculated by multiplying the lesser of the customer's monthly Distribution Service Load (DSL) or Nova Scotia Power International's (NSPI) actual exports by NSPI's average export margin for that month. A cap is established such that the total annual IEBC cannot exceed 15% of NSPI's total actual annual export margin.
Forecast ELIIR Cost (FEC) This is the customer's anticipated ELIIR cost as determined in the Fall of each year preceding the active rate year. It is based on the cost that results from using the UET and the monthly ELIIR load factors that...
AI summary The document describes the methodology for calculating the Forecast ELIIR Cost (FEC), which represents the customer's anticipated cost for the Energy Literacy and Inclusion Initiative. The FEC is determined annually in the fall based on the Upper ELIIR Threshold (UET), monthly ELIIR load factors, and energy consumption between the Lower ELIIR Threshold (LET) and the UET under the Customer Billing Line (CBL). An example calculation is provided illustrating how the ELIIR rate and energy volume are multiplied to derive the FEC.
CBL Base Rate (CBLbr) This is the CBLbc divided by the energy forecast to be consumed between the UET and the CBL. (In the above example, it is the $286,200 7 4.2 GWh, or $68.14/MWh). APPROVED: NOV A SCOTIA UTILITY AND REVIEW BOARD EFFECTI...
AI summary The document defines the Customer Billing Line base Rate (CBLbr) as the Customer Billing Line base cost (CBLbc) divided by the energy forecast consumed between the Upper ELIIR Threshold (UET) and the CBL. It provides a specific calculation example resulting in a rate of $68.14/MWh. The text notes that this was approved by the Nova Scotia Utility and Review Board for the Nova Scotia Power Incorporated Two Part Real Time Pricing Tariff, which has since been discontinued.
Special Conditions - 1. During periods of economic interruption, where the customer does not buy through, both the CBL and UET will be lowered by the amount of load interruption requested by NSPI. Any load reduction below this adjusted UET...
AI summary This document outlines special conditions for the Two Part Real Time Pricing (2P-RTP) tariff, specifically regarding the Energy Literacy and Inclusion Initiative (ELIIR). It establishes rules for adjusting the Customer Billing Line (CBL) and Upper ELIIR Threshold (UET) during economic interruptions or supply disruptions caused by system conditions. It also specifies how energy consumption above the CBL is priced during interruptions and defines which threshold governs the Customer's Alternative Cost (CAC) when calculating ELIIR rates.
MAXIMUM PER KW.H CHARGE/MINIMUM BILL The maximum charge per kW.h will be that for a billing load factor of 10% except that the minimum monthly bill for the electric power and energy portion of the Miscellaneous Lighting Rate shall be $12.6...
AI summary The text outlines the pricing structure for the Miscellaneous Lighting Rate, specifically defining the maximum charge per kW.h based on a 10% billing load factor. It establishes a minimum monthly bill of $12.65 for unmetered service billed separately. Additionally, it specifies that capital charges are based on 25-year depreciation and long-term interest rates, while maintenance charges reflect current costs for bulbs and fixtures, excluding globe washing and vandalism repairs.
AVAILABILITY: A flat rate shall be calculated for any service requiring the supply of power and energy only, with a predeterrninable usage, and where metering is considered to be impractical, such as: Telephone Booths, Cable Vision Power S...
AI summary The text establishes a regulatory rule for calculating a flat rate for specific services that require power and energy supply with predeterminable usage. This flat rate is applicable in instances where installing and maintaining standard metering is deemed impractical. Examples of such services include telephone booths, cable vision power supplies, traffic control lights, police telephones, and railway signals.
N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB)
16 passages
g. Capitalization policy Capital assets include labour, inventories and other non-labour costs directly attributable to the capital activity. In addition, in order to ensure the full cost approach, overhead costs that contribute to the cap...
AI summary Nova Scotia Power (NSPI) outlines its capitalization policy, stating that capital assets comprise labor, inventories, and other non-labor costs directly linked to capital activities. To ensure a full-cost approach, NSPI allocates overhead costs—including finance, IT, executive support, employee benefits, insurance, and fleet maintenance—to capital projects. These overhead costs are specifically allocated based on direct labor costs. Furthermore, NSPI determines rates based on project type, ensuring only eligible operating expenditures are included in the calculation.
{millions of dollars} Affiliate Pu!Eose of Transaction 2005 2004 Sales: Emera Fuels Net sale of bunker C oil $0.6 $9.4 Emera Energy Services Net sale of gas and electricity 195.4 156.5 Emera Inc. Allocation of common costs $6.0 $5.8 Variou...
AI summary The document provides a financial breakdown of affiliate transactions between Emera entities for the years 2004 and 2005. It details sales of bunker C oil, gas, electricity, and common costs, alongside purchases of transformer maintenance, line extension work, and a gas turbine. Additionally, it notes a $16.7 million purchase of transportation capacity from Maritimes and Northeast Pipeline, an entity under significant influence of Emera Inc., which is recognized as a fuel expense at fair market value.
Pre-2003 Income Tax Liability and Related Interest NSPI has a $146.7 million regulatory asset related to pre-2003 income taxes that have been paid, but not yet recovered from customers. This circumstance arose when NSPI claimed capital cos...
AI summary Nova Scotia Power Incorporated (NSPI) holds a $146.7 million regulatory asset representing pre-2003 income taxes paid but not yet recovered from customers. This liability originated from capital cost allowance (CCA) deductions that were subsequently disallowed by the Supreme Court of Canada. The Nova Scotia Utility and Review Board (UARB) approved the amortization and recovery of this asset over an eight-year period starting in 2007, preventing the costs from being expensed immediately.
Five-Year Summary 2005 2004 2003 2002 2001 lines (69 kV and over) 5 5 5 5 5 Thousands of kms of distribution lines ~25 kV and under~ 25 25 25 25 25 Five-Year Summary For the year ended December 31 (millions of dollars2 2005 2004 2003 2002...
AI summary The document provides a five-year financial summary (2001-2005) for a utility, detailing revenue, operating costs, and earnings. Key data points include revenue growth from $838.6 million to $963.0 million, fuel costs for generation, depreciation, and regulatory amortization. It also tracks net earnings applicable to common shares, common dividends, and retained earnings, while highlighting specific costs such as coal fuel for generation and allowance for funds used during construction.
2005 Nova Scotia Power Inc. Management's Discussion & Analysis Management's Discussion and Analysis ("MD&A") provides a review of the results of operations of Nova Scotia Power Inc. ("Nova Scotia Power" or "NSPI") during the fourth quarter...
AI summary This section introduces the 2005 Management's Discussion and Analysis (MD&A) for Nova Scotia Power Inc. (NSPI), outlining the financial results for 2005 compared to previous years. It highlights that NSPI is a vertically integrated, regulated electric utility serving 470,000 customers. The text emphasizes that NSPI's accounting policies are subject to UARB approval and may differ from GAAP. It also establishes NSPI's status as a cost-of-service utility, where rates are designed to recover prudently incurred costs and provide a prescribed return on equity.
Overview NSPI is the primary electricity supplier in Nova Scotia, providing over 95% of the electricity generation, transmission and distribution in the province. The company owns 2,293 megawatts ("MW") of generating capacity. Approximatel...
AI summary Nova Scotia Power Incorporated (NSPI) is the province's primary electricity supplier, providing over 95% of its generation, transmission, and distribution. The company's capacity is comprised of coal, oil, natural gas, hydro, and wind. As a regulated public utility under the Public Utilities Act (Nova Scotia), NSPI's operations and rates are overseen by the Nova Scotia Utility and Review Board (UARB). NSPI operates under a cost-of-service model where rates are set to cover prudently incurred costs and provide a regulated return on equity (ROE).
2005 Electricity Rate Increase On March 31 , 2005, the UARB granted NSPI an average rate increase of approximately 5.3%, effective April 1, 2005. The rate decision increased NSPI's electric revenues by approximately $25.0 million in 2005 c...
AI summary The Utility and Rate Board (UARB) granted Nova Scotia Power Inc. (NSPI) an average rate increase of approximately 5.3% effective April 1, 2005, resulting in a $25.0 million revenue increase. The decision included full recovery of a $146.7 million Section 21 income tax deposit starting in 2007. Notably, the UARB disallowed $18 million in forecasted fuel costs due to unsatisfactory past procurement practices and rejected a $13 million cost deferral proposal.
Natural gas supply contract In 04, 2005, Nova Scotia Power reached an agreement with its supplier on pricing for natural gas under an existing long-term natural gas purchase agreement. The contract - which began in 2000 and runs until 2010...
AI summary Nova Scotia Power Inc. (NSPI) describes a 2005 pricing dispute with its natural gas supplier regarding a long-term purchase agreement. After failing to reach a voluntary agreement, the matter entered arbitration. The parties eventually settled before a final decision was rendered. The resulting contract price was more favorable than NSPI's estimates, leading to a $23.8 million fuel expense adjustment and a separate $8.0 million net payment from the supplier, both of which were recorded in 2004.
Net Earnings {millions of dollars} Three months ended December 31 Year ended December 31 2005 2004 2005 2004 2003 Electric revenue $243.0 $237.8 $955.0 $926.9 $895.6 Fuel for generation and purchased power 79.5 86.9 373.8 303.1 277.8 Opera...
AI summary The document provides a detailed financial analysis of Nova Scotia Power Inc.'s (NSPI) net earnings from 2003 to 2005. While Q4 2005 saw a significant increase in net earnings to $34.0 million, primarily driven by favorable natural gas supply contract pricing and a separate $8.0 million net payment from a supplier, annual net earnings trended downward from $112.1 million in 2003 to $91.2 million in 2005. Key factors influencing these changes included load growth, increased fuel expenses from higher commodity prices, capital investment-related depreciation, and a 5.3% rate increase in 2005.
Purchase obligations include the company's purchasing commitments for electricity from independent power producers, transportation of coal, outsource management of the company's computer infrastructure, natural gas, transportation capacity...
AI summary Nova Scotia Power Inc. (NSPI) outlines its long-term purchase and operational obligations, which include commitments for electricity from independent power producers, coal transportation, outsourced computer infrastructure management, natural gas, and transportation capacity on the Maritimes & Northeast Pipeline. Additionally, the company identifies its asset retirement obligations as a significant long-term liability. NSPI asserts that it possesses sufficient cash flows from its ongoing operations to meet these financial and contractual commitments.
Rate Regulation NSPI's accounting policies are subject to examination and approval by the UARB. As a result, NSPI's rate-regulated accounting policies may differ from accounting policies for non-rate-regulated companies. These differences...
AI summary The text explains that Nova Scotia Power Inc.'s (NSPI) accounting policies are subject to UARB approval and may differ from standard corporate accounting due to regulatory requirements. Specifically, these differences often relate to the timing of revenue and expense recognition based on the expectation of future regulatory decisions. Examples include the non-recording of future income taxes and the deferral of expense differences, both of which rely on the assumption that the regulator will eventually allow for the recovery or refund of these amounts in future rate applications.
Natural Gas Price Adjustment Receivable NSPI's existing long term natural gas purchase agreement includes a price adjustment clause covering three years of natural gas purchases. The clause states that NSPI will pay for all gas purchases a...
AI summary Nova Scotia Power Inc. (NSPI) discusses a price adjustment clause within its long-term natural gas purchase agreement. The clause entitles NSPI to a price rebate on specific volumes of gas purchases, with settlement scheduled for November 2007. Management has estimated the value of this rebate using actual and forward marketing pricing and has recorded the amount as a long-term receivable on its financial statements.
Asset Retirement Obligations The company recognizes asset retirement obligations for property, plant and equipment in the period in which they are incurred if a reasonable estimate of fair value can be determined. The fair value of the lia...
AI summary Nova Scotia Power Inc. outlines its accounting treatment for asset retirement obligations (AROs), noting that liabilities are recognized when a fair value can be reasonably estimated. The company discounts these liabilities using a risk-free interest rate adjusted for its credit standing. NSPI asserts that these obligations are recoverable through rates and should not impact its results of operations. As of December 31, 2005, recorded AROs totaled $71.4 million, with an estimated undiscounted settlement cost of $308.2 million to be incurred primarily between 2020 and 2039.
Regulatory Risk In December 2001 , the Nova Scotia government released Nova Scotia's Energy Strategy, Seizing the Opportunity. The strategy for the electricity industry is to carefully introduce certain aspects of competition over time. Th...
AI summary The document outlines the regulatory landscape and risks for Nova Scotia Power Inc. (NSPI), focusing on the province's strategy to introduce competition in the electricity industry. While the Electricity Act and Open Access Transmission Tariff (OATI) facilitate wholesale competition and exports, significant restructuring is not expected in the medium term due to geographic and infrastructure constraints. A primary regulatory risk identified is the uncertainty regarding the full recovery of fuel costs, with NSPI seeking a Fuel Adjustment Mechanism (FAM) or more frequent rate cases to mitigate these costs.
REGULATED STATEMENT OF EARNINGS Quarter-to-Date Actual September Quarter-to-Date Budget September Quarter-to-Date Variance September Year-to-Date Actual Year-to-Date Budget Year-to-Date Variance Full Year Budget Prior YTD Actual Curr/Prior...
AI summary The Regulated Statement of Earnings provides a financial performance comparison for Nova Scotia Power Inc. (NSPI) as of September. The data tracks actual versus budgeted figures for revenue, cost of operations, and depreciation. Key findings include a significant year-to-date variance where actual electric revenue (approximately $710 million) fell short of the budget (approximately $856 million). Additionally, fuel for generation costs were substantially lower than budgeted for the year-to-date period.
11. Contingencies The Company may, from time to time, be involved in legal proceedings, claims and litigation that arise in the ordinary course of business which the Company believes would not reasonably be expected to have a material adve...
AI summary The Company notes that while it is involved in routine legal proceedings and litigation, these are not expected to materially impact its financial condition. The text specifically highlights a 2005 instance where hurricanes in the Gulf of Mexico disrupted petcoke supplies, forcing Nova Scotia Power Inc. (NSPI) to incur additional costs for replacement fuel. NSPI is currently seeking cost recovery from its insurers, who have confirmed coverage exists, though the total recovery amount remains undetermined.
N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB)
25 passages
To My Fellow Shareholders In my letter last year, I emphasized the importance of Emera increasing the predictability of its earnings as a critical step in delivering on our investment value proposition. We've made solid progress toward thi...
AI summary The CEO addresses shareholders regarding Emera's efforts to increase earnings predictability. The text highlights historical challenges at Nova Scotia Power (NSPI), specifically regarding rate increases and the impact of fluctuating world fuel prices. It notes that the Nova Scotia Utility and Review Board (UARB) previously criticized NSPI's fuel procurement. To mitigate these risks, NSPI has diversified its fuel mix, established a portfolio of contracts for commodities and currency, and invested in new infrastructure to ensure cost recovery and competitive access to global coal supplies.
- Nova Scotia Power Inc. ("NSPI") is an electricity generation, transmission and distribution company, provid ing service to the vast majority of the province of Nova Scotia. NSPI has $3 bill ion in assets, and 470,000 customers. NSPI is a...
AI summary The text provides a preamble describing the corporate structure and regulatory environment of Emera's electric utilities. Nova Scotia Power Inc. (NSPI) serves Nova Scotia as a cost-of-service utility regulated by the UARB, while Bangor Hydro-Electric Company (BHE) serves eastern Maine under FERC and MPUC oversight. The document highlights that while these utilities provide stable earnings due to their monopoly positions and regulated markets, Emera seeks growth through infrastructure expansion, including a joint venture for a pumped storage hydro-electric facility in Massachusetts.
Emera Inc.'s consolidated earnings increased $6.3 mil lion to $37.7 million in Q4, 2005 compared to $31.4 million for the same period in 2004. The earnings increase was substantially due to the finalization of pricing terms of NSPI's natur...
AI summary Emera Inc. reported an increase in consolidated earnings for Q4 2005, reaching $37.7 million compared to $31.4 million in Q4 2004. This growth was primarily driven by the finalization of natural gas supply contract pricing for NSPI at rates better than initial estimates, as well as an $8.0 million net payment from a separate agreement with NSPI's gas supplier. Despite the quarterly growth, annual consolidated earnings for 2005 were lower than the previous two years.
Natural gas supply contract In Q4, 2005, Nova Scotia Power reached an agreement with its supplier on pricing for natural gas under an existing longterm natural gas purchase agreement. The contract- which began in 2000 and runs until 2010 -...
AI summary Nova Scotia Power reached a natural gas supply agreement in Q4 2005 following a period of arbitration regarding price redetermination for a contract running until 2010. The final agreed price was more favorable than the company's initial estimates, resulting in a $23.8 million ($14.7 million after-tax) fuel expense adjustment. Additionally, Nova Scotia Power received a net payment of $8.0 million ($5.0 million after-tax) from the supplier, which was recorded as other income.
OVERVIEW NSPI is the primary electricity supplier in Nova Scotia, providing over 95% of electricity generation, transmission and distribution in the province. The company owns 2,293 megawatts ("MW") of generating capacity. Approximately 55...
AI summary Nova Scotia Power Inc. (NSPI) is the primary electricity provider in Nova Scotia, owning over 95% of the province's generation, transmission, and distribution infrastructure. The company's generation portfolio consists of coal, oil, natural gas, hydro, and wind. As a public utility regulated under the Public Utilities Act, NSPI is overseen by the Utility and Rate Advisory Board (UARB). The company operates under a cost of service model where rates are set to cover prudently incurred costs and provide an appropriate return on equity (ROE) to investors.
2005 Electricity Rate Increase On March 31, 2005, the UARB granted NSPI an average rate increase of approximately 5.3%, effective April 1, 2005. The rate decision increased NSPI's electric revenues by approximately $25 million in 2005 comp...
AI summary The UARB granted Nova Scotia Power (NSPI) an average electricity rate increase of approximately 5.3% effective April 1, 2005, resulting in a $25 million revenue increase. The decision included a provision for the full recovery of a $146.7 million Section 21 income tax deposit over eight years starting in 2007. However, the UARB disallowed $18 million in forecasted 2005 fuel costs due to past procurement practices and rejected a $13 million cost deferral proposal. NSPI subsequently filed a compliance report regarding fuel procurement changes.
INCOME TAXES In accordance with ratemaking regulations established by the UARB, NSPI uses the taxes-payable method of accounting for income taxes. NSPI is subject to provincial capital tax (0.288%), large corporations tax (0.175%), corpora...
AI summary The Nova Scotia Public Utilities Regulatory Board (NSPI) utilizes the taxes-payable method of accounting for income taxes, as established by the UARB. NSPI is subject to various provincial and corporate taxes, including a 38.12% corporate income tax. The text discusses a $146.7 million regulatory asset for pre-2003 disallowed tax deductions, which is being amortized over eight years. Additionally, NSPI deferred $12.2 million in federal capital and income taxes for the first quarter of 2005, with the amortization period awaiting approval.
OVERVIEW Bangor Hydro is the second largest electric utility in Maine. BHE's core business is the transmission and distribution ("T&D") of electricity. Electricity generation is deregulated in Maine, and several suppliers compete to provid...
AI summary Bangor Hydro Electric (BHE) is a Maine-based electric utility primarily engaged in transmission and distribution. The company manages significant 'regulatory' assets (stranded costs) from the late 1990s industry restructuring, which account for 30% of its electric rate. BHE's operations are split between regulatory jurisdictions: distribution and stranded costs are regulated by the Maine Public Utilities Commission (MPUC) under an Alternate Rate Plan (ARP), while transmission is regulated by the Federal Energy Regulatory Commission (FERC).
millions of dollars Three months ended December 31 Year ended December 31 T&D revenues - 2003 $ 115.1 Increased energy sales volume 1.8 Unbilled revenue adjustment in Q3, 2003 2.7 Lower special contract rate for large customer (1.1) All ot...
AI summary The document provides a financial breakdown of transmission and distribution (T&D) revenues from 2003 to 2005. It highlights fluctuations in revenue driven by factors such as increased energy sales volume, unbilled revenue adjustments, and lower special contract rates for large customers. Notably, a stranded cost rate reduction implemented in March 2005 led to a significant decrease in annual revenues. The text also notes that while industrial volumes increased, the impact on sales revenue was minimal due to lower unit pricing.
EQUITY EARNINGS Equity earnings from the Maritimes & Northeast Pipeline were $1.7 million in Q4, 2005 compared to $1.2 million for the same period in 2004. The increase is primarily due to increases in tol ls collected for the US operation...
AI summary The document details the equity earnings of Maritimes & Northeast Pipeline (M&NP) for 2004 and 2005, noting an increase in 2005 primarily driven by higher tolls from US operations. It discusses the pending FERC rate decision for 2004, the interim collection of proposed rates, and the potential return of excess funds to customers. The text also highlights how earnings were impacted by pipeline expansion write-offs, currency fluctuations, and lower volumes in the US component.
BUSINESS DEVELOPl\lENT Business development recognized a $1.3 mi llion cost recovery in Q4, 2005, compared to a $0.5 million expense in Q4, 2004 due primarily to the capitalization in Q4, 2005 of $2.5 million of previously expensed busines...
AI summary The text details the financial performance of the business development segment for 2004 and 2005. In Q4 2005, a $1.3 million cost recovery was achieved, largely due to the $2.5 million capitalization of previously expensed costs into the Bear Swamp net assets. For the full year 2005, the segment recognized a $0.2 million cost recovery, influenced by this capitalization and the recovery of a portion of a $1.9 million investment write-off from the Greyhawk Gas Storage joint venture in Q1 2005.
RATE HEGULATION The accounting for these items is based on the expectation of the future actions of the regulators. For example, NSPI does not record future income taxes. The taxes payable method is prescribed by the regulator for rate-mak...
AI summary The text discusses the accounting principles used by Nova Scotia Power Inc. (NSPI) regarding regulatory expectations. It explains that NSPI does not record future income taxes because they expect regulators to allow recovery in rates once payable. Additionally, the company defers differences between regulated amounts and actual expenses, anticipating that regulators will approve subsequent refunds or recoveries. The text warns that if regulatory actions deviate from these expectations, the actual timing and amount of asset refunds or liability recoveries may differ significantly from financial statements.
NATURAL GAS PRICE ADJUST1'\1ENT RECEIVABLE NSPI's existing long-term natural gas purchase agreement includes a price adjustment clause covering three years of natural gas purchases. The clause states that NSPI will pay for all gas purchase...
AI summary Nova Scotia Power Inc. (NSPI) is addressing a price adjustment receivable related to its long-term natural gas purchase agreement. The agreement includes a clause allowing for a price rebate on a portion of gas volumes to be settled in November 2007. Management has calculated a best estimate of this rebate based on contract specifications, actual pricing, and forward marketing pricing, subsequently recording the amount as a long-term receivable.
management's discussion and analysis As part of the 2003 NSPI depreciation settlement, the UARB included the amount of future expenditures associated with the remova l of generation facil ities. NSPI bel ieves that it will continue to be a...
AI summary Nova Scotia Power Inc. (NSPI) asserts that it will continue to recover asset retirement obligations (AROs) through rates, consistent with the 2003 NSPI depreciation settlement. The company argues that changes to AROs or associated cost recognition factors should not affect its results of operations. As of December 31, 2005, NSPI recorded AROs of $71.7 million on its balance sheet, with an estimated undiscounted settlement cost of approximately $309.2 million to be incurred between 2007 and 2061.
Nova Scotia Power In December 2001, the Nova Scotia government released Nova Scotia's Energy Strategy, Seizing the Opportunity. The strategy for the electricity industry is to careful ly introduce certa in aspects of competition over time....
AI summary Nova Scotia Power (NSPI) discusses the province's electricity strategy, which aims to introduce competition over time as permitted by the Electricity Act. Key developments include the approved Open Access Transmission Tariff (OATT) to facilitate wholesale competition and export reciprocity. NSPI notes that major structural changes are unlikely in the medium term due to geographic and infrastructure constraints. The company is currently addressing concerns regarding fuel cost recovery and is seeking approval for a Fuel Adjustment Mechanism (FAM) while filing for 2006 customer rates.
Bangor Hydro Bangor Hydro's business consists of four primary components wh ich are each governed by their own regulatory structure. The components include distribution, transm ission , standard costs, and supply (metering, billi ng, and s...
AI summary The document outlines the four primary components of Bangor Hydro's business: distribution, transmission, standard costs, and supply. BHE's distribution business operates under an Alternate Rate Plan (ARP) requiring annual rate decreases and performance penalties, with the potential for higher returns on equity. Transmission is regulated by FERC and linked to the Regional Transmission Organization for New England. BHE can recover stranded costs for regulatory assets and power purchases, while metering and billing costs are recoverable as prudently incurred.
Consolidated Statements of Earnings Year Ended December 31 millions of dollars (except earnings per common share) 2005 2004 Revenue Electric $ 1,125.9 $1 ,095.7 Other 42.1 38.5 1,168.0 1,134.2 Cost of operations Fuel for generation and pur...
AI summary The document presents the Consolidated Statements of Earnings for the years ended December 31, 2005, and 2004. It details the company's revenue from electric and other sources, cost of operations (including fuel, maintenance, taxes, and depreciation), and various earnings metrics. Key figures show a decrease in net earnings applicable to common shares from $129.8 million in 2004 to $121.2 million in 2005, with a corresponding decrease in basic earnings per common share.
1. SUJ\1MARY <H SIGNIFICANT ACCOUNTING POLICIES Emera Inc. ("Emera" or the Company), incorporated in the Province of Nova Scotia, through its principal subsidiaries, Nova Scotia Power Inc. ("Nova Scotia Power" or "NSPI") and Bangor Hydro-E...
AI summary The document provides an overview of the significant accounting policies and regulatory framework for Emera Inc., specifically its subsidiaries Nova Scotia Power Inc. (NSPI) and Bangor Hydro-Electric Company (BHE). It highlights NSPI's role as the primary electricity supplier in Nova Scotia, regulated by the Utility and Rate Board (UARB) under the Public Utilities Act. NSPI operates under a cost of service model, where rates are set to recover prudently incurred costs while providing a regulated return on equity (ROE) to investors.
d. Allowance for Funds Used during Construction Accounting for the impact of rate regulation: In accordance with accounting policies determined by their respective regulators, NSPI and Bangor Hydro provide for the cost of financing constru...
AI summary The text describes the accounting treatment for the Allowance for Funds Used during Construction (AFUDC) by Nova Scotia Power Inc. (NSPI) and Bangor Hydro. Following regulatory accounting policies, these utilities include the cost of financing construction work in progress as an addition to property costs using a weighted average cost-of-capital. AFUDC is capitalized as property, plant, and equipment, subsequently charged to operations via depreciation and recovered through future revenues, encompassing both interest and equity components.
13. LONG-TERM RECEIVABLE The current portion of the long-term receivable, which arose from Emera's 2003 sale of its 8.4% interest in the offshore platforms and sub-sea field gathering lines of the Sable Offshore Energy Project to Pengrowth...
AI summary The document details two components of long-term receivables for Nova Scotia Power Inc. (NSPI). First, it addresses a $20.0 million receivable from the 2003 sale of an interest in the Sable Offshore Energy Project to Pengrowth Corporation, noting that the remaining long-term portion was reduced to zero by December 31, 2005. Second, it describes a price rebate of approximately $48.4 million expected in November 2007 under an existing natural gas purchase agreement, which is currently reflected in long-term receivables.
Pre-2003 Income Tax Liability and Related Interest NSPI has a $146.7 million regulatory asset related to pre-2003 in come taxes that have been paid, but not yet recovered from customers. This circumstance arose when NSPI cla imed capital c...
AI summary Nova Scotia Power Inc. (NSPI) maintains a $146.7 million regulatory asset representing pre-2003 income taxes paid but not yet recovered from customers. This liability originated from capital cost allowance (CCA) deductions that were subsequently disallowed by the Supreme Court of Canada. The Utility Analysis Review Board (UARB) approved the amortization and recovery of this asset over an eight-year period starting in 2007. Without this regulatory approval, the costs would have been treated as expenses rather than recoverable assets.
Costs to Terminate/Restructure Purchased Power Contracts Bangor Hydro has power purchase contracts, wh ich it was required to negotiate when oil prices were high, with several independent power producers known as small power production fac...
AI summary Bangor Hydro is addressing high-cost power purchase contracts with small power production facilities negotiated during periods of high oil prices. To mitigate these costs, the utility has incurred expenses to terminate or restructure specific contracts. The MPUC has permitted Bangor Hydro to defer and recover these costs through stranded cost rates, with amortization schedules spanning 11 and 20 years. Without this regulatory approval, the utility would have had to expense these costs immediately, significantly impacting its earnings.
Maine Yankee Decommissioning Costs Bangor Hydro owns 7% of the common stock of Maine Yankee, which in 1997 permanently shut down its nuclear generating plant. Pursuant to a contract with Maine Yankee, BHE is required to pay its pro-rata sh...
AI summary The text describes Bangor Hydro's (BHE) financial obligations regarding the Maine Yankee nuclear plant decommissioning. BHE owns 7% of the common stock and is contractually obligated to pay its pro-rata share of operating and decommissioning costs, which were approximately $5.0 million in 2005. These costs are included in BHE's stranded cost revenues and are reconcilable with purchased power and Hydro-Quebec costs. Any variances between actual and estimated amounts are managed through regulatory deferrals and future MPUC reviews.
Seabrook Nuclear Project Bangor Hydro was a participant in the Seabrook nuclear project in Seabrook, New Hampshire. On December 31 , 1984, Bangor Hydro had almost $87 million invested in Seabrook, but because the uncertainties arising out...
AI summary The text discusses Bangor Hydro's historical involvement in the Seabrook nuclear project in New Hampshire. Due to financial instability caused by project uncertainties, Bangor Hydro sold its investment in 1986. The MPUC issued an order in 1985 disallowing certain costs but permitted the recovery of 70% of the 1984 investment in Seabrook Unit 1 via customer rates over a 30-year period. The document notes that without this approval, the loss on sale would have significantly impacted the company's 2005 earnings.
Hydro-Quebec Obligation The obligation associated with Hydro-Quebec represents the estimated present va lue of Bangor Hydro's estimated future payments for net costs associated with ownership and operation of the Hydro-Quebec intertie betw...
AI summary The text describes the financial obligation associated with Hydro-Quebec, which represents the estimated present value of Bangor Hydro's future payments for the ownership and operation of the Hydro-Quebec intertie. This obligation is recognized as a long-term deferred credit permitted for recovery by the MPUC. The regulatory asset is being reduced as expenses are incurred, with the amortization of the asset being reflected in purchase power expenses. It also notes the impact of this obligation on 2004 and 2005 earnings.
N-2-gRIRs 1 to 25 - Stutz to NSPI - REDACTED (Large File - 18 MB)
12 passages
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Stutz REDACTED Question IR-1: Reference DE, pages 1 to 3 and Appendix A, Table 2 Please indicate the change in required revenues for 2007 due to all of the changes in rates proposed by NSPI. I...
AI summary NSPI provides a response to an information request regarding the change in required revenues for 2007 resulting from proposed rate changes. While the gross change in required revenues is $82.5 million, the net revenue requirement is adjusted to $81.3 million after accounting for $0.4 million in incremental miscellaneous revenues and $0.8 million in Mersey Additional Energy revenues. The response clarifies the methodology for calculating component changes by comparing 2007F against 2006C.
In the Nova Scotia Utility and Review Board's March 10, 2006 Decision (NSUARB-NSPI-P-882), the Board directed NSPI to conduct a cost of service study with respect to the Unrnetered Class. The Decision stated: 5 6 7 8 9 1 2 3 4 "This study...
AI summary Nova Scotia Power Inc. (NSPI) submitted a report in response to a 2006 Nova Scotia Utility and Review Board directive requiring a cost of service study for the Unmetered Class. NSPI proposes reducing the C-3 weighting factor from 5.0 to 2.0. The report also asserts that the current unmetered rate base is accurate, as it only includes assets owned and paid for by the company, and provides the requested breakdown of costs and assets by municipality.
2.0 THE C-3 WEIGHTED CUSTOMER ALLOCATOR There has been discussion and debate about the use of the Cost of Service Study's C-3 Weighted Customer Allocator which is used to allocate certain customer-related expenses to ATL classes. There has...
AI summary Nova Scotia Power Inc. (NSPI) proposes a revision to the C-3 Weighted Customer Allocator used to allocate customer-related expenses to above-the-line (ATL) classes. NSPI argues that the Unmetered Class does not disproportionately cause costs in customer service head office and field areas, leading to a proposal to switch these costs to the C-1 Allocator. For Billing Services and Call Centre functions, NSPI conducted a review of effort and call volumes, proposing reduced weighting factors for the Unmetered Class based on specific analysis of LED conversions and call metrics.
3.0 UNMETERED CLASS RATE BASE With respect to the unmetered rate base, HRM's concern during NSPI's 2006 Rate Hearing appears to have centered on its belief that developers pay for streetlights in the capital contributions they provide when...
AI summary Nova Scotia Power Inc. (NSPI) addresses concerns raised by the Halifax Regional Municipality (HRM) regarding the inclusion of streetlights in the unmetered rate base. NSPI clarifies that developers do not contribute to streetlight capital costs, and customer-owned area lights are excluded from the rate base. NSPI asserts that its rate base correctly reflects only assets owned and paid for by the company. Additionally, NSPI notes it lacks the granular data required to provide a breakdown of streetlight costs by specific municipality.
5 4.2 Schedule 2 - Determination of Maintenance Costs by Fixture Type 6 7 8 9 10 11 12 13 14 15 16 17 18 The purpose of this schedule is to assign current maintenance costs to all lights containing a maintenance charge, based on the servic...
AI summary The document outlines the methodology for determining maintenance costs for various light fixtures. It explains that current maintenance costs are assigned based on the service life of lamp types and specific weighting factors relative to 1 OOW High Pressure (Intensity) Sodium lights. By applying these weights to the total number of lights and using forecasted 2006C street light operating expenses (including corporate overhead and pension costs), the calculation establishes the annual and monthly maintenance charges for each fixture type.
5 4.4 Schedule 4 - Determination of Depreciation and Capital-related costs by Fixture Type 6 7 8 9 10 11 12 13 14 15 16 17 In this schedule, the capital component of the street light rate is determined by individual fixture type. The depre...
AI summary The document outlines the methodology for determining the capital component of the street light rate based on individual fixture types. It specifies the use of a 4.55% depreciation rate, corresponding to Year 2 of the DARB-approved phase-in schedule for 2006. Additionally, a tax-adjusted weighted average cost of capital (WACC) of 11.96% is applied to calculate remaining capital-related costs, including interest, taxes, and dividends. This methodology aligns with the approved approach for Nova Scotia Power Inc.'s Open Access Transmission Tariff (OATT).
4.8 Schedule 9 -New Street and Crosswalk Lighting Rates by Cost Component 5 6 7 8 9 10 11 12 13 14 15 16 17 4 Once the analysis of all costs components was complete, they were summarized in Schedule 9 including the rate description, the ra...
AI summary This section details the methodology for establishing new street and crosswalk lighting rates based on cost components. It explains that incandescent rates were benchmarked against Mercury Vapour rates (250W and 400W). The power and energy component calculation is derived from annual photocell and continuous burning energy usage to determine average cents per kWh. Finally, the analysis notes that the new rates result in a projected revenue increase of $0.276M for 2006 compared to current approved rates.
5.0 CONCLUSION In order to ensure that the three components of unmetered rates remain aligned with costs, NSPI proposes to update this Street I Crosswalk Lighting Study each time the Company files a future general rate application. The Com...
AI summary Nova Scotia Power Inc. (NSPI) proposes a methodology update for unmetered rates to ensure the three cost components remain aligned with actual costs. Instead of applying an average across-the-board rate adjustment, NSPI intends to review and revise individual cost components for specific fixture types during each future general rate application. While the official tariffs will continue to display unmetered rates as single figures, the underlying pricing will reflect these individual components. Additionally, NSPI proposes updating terminology to reflect 'High Pressure Sodium' lighting.
UNMETERED SERVICE CLASS ANALYSIS OF ALLOCATED CUSTOMER-RELATED EXPENSES 2006 Compliance Filing Total- Incl. Cust. Costs Cust. Costs Corp. 0/H & assigned to assigned to Total Direct Pension Unmetered Class Unmetered Class Costs ($000) Costs...
AI summary The document provides a financial breakdown of customer-related expenses for the 2006 Compliance Filing, specifically focusing on the allocation of costs to the Unmetered Service Class. It distinguishes between total direct costs (including corporate overhead and pension costs) and the specific portion of customer costs assigned to the Unmetered Class as a dollar amount and a percentage of total customer costs.
Customer Costs Assigned to Unmetered Class Using C-3 Allocator:
AI summary The document segment introduces the methodology for assigning customer costs to the unmetered class. It specifies the use of the C-3 allocator as the mechanism for this cost distribution.
STREET / CROSSWALK LIGHTING STUDY Description Rate Code kW.h/Mo. Power & Energy Maintenance Capital 2006 New Resulting Rates 2006 New Resulting Revenue 2006 Approved Rates Percent Change Units Revenue Variance Incandescent : Incandescent <...
AI summary The document presents a detailed Street / Crosswalk Lighting Study comparing various lighting technologies, including Incandescent and Mercury Vapour bulbs of different wattages. The table provides a comprehensive breakdown of power and energy costs, maintenance, capital costs, and revenue variances. It specifically evaluates the 2006 New Resulting Rates against 2006 Approved Rates, illustrating the percent change and revenue variance across different lighting configurations and unit counts.
Also, please refer to UARB IR-61a. Figure 9.1 Modified for GRLF class at current rates. %Revenue Proposed RIC Ratio Increase Revenue ABOVE-THE-LINE CLASSES Residential 90.8% 0.0% $481.6 Commercial Small General 93.7% 0.0% $28.1 General Dem...
AI summary The document presents a financial table detailing the revenue requirement and revenue distribution for various customer classes under the GRLF class at current rates. It breaks down revenue by 'Above-the-line' classes (Residential, Commercial, Industrial, and Other) and 'Below-the-line' categories (Exports, Miscellaneous). Notably, the table shows a projected revenue shortfall of $82.8 million, with a total revenue requirement of $1,197.6 million against a total revenue of $1,114.8 million.
N-40RIRs Attachment SEB-NSPI - 2d (Large File - 20 MB)
53 passages
GENERAL DESCRIPTION OF RATE This Rate ECR is made a part of each of the base rate schedules of the Company to which Rate ECR is applicable and any modification to, amendment to or replacement of such base rate schedules. All bills rendered...
AI summary This section describes the implementation of the Rate ECR, which is integrated into the Company's base rate schedules. The Rate ECR establishes the procedure for recovering defined energy costs and determines the effective Energy Cost Recovery factor. Once calculated, this factor will be combined with other charges in the applicable rate schedule and presented to customers as a single line item on their bills.
RATE ECR A SOU'I'HEGN COMPANY ENERGY COST RECOVERY RATE PAGE 2 of6 EFFECTIVE DATE REVISION November, 2001 Billings Second
AI summary The document is a heading page for a regulatory proceeding regarding the Energy Cost Recovery (ECR) rate for the Sou'i'hegn Company. It specifies that the revision is effective as of November 2001 and pertains to the second billing cycle.
ENERGY COST RECOVERY FACTOR CALCULATION PROCEDURE (RATE ECR FORMULA) The Energy Cost Recovery factor to be applied to each kilowatt-hour supplied by the Company under any base rate schedule of which this Rate ECR is made a part shall be ca...
AI summary The text outlines the calculation procedure for the Energy Cost Recovery Factor (ECRF) applied to retail kilowatt-hour sales. The ECRF is determined by summing the Estimated Total Energy Cost (ETEC) and the CF ETS. The ETEC component includes three primary elements: (1) estimated fossil fuel and emission allowance costs from specific Uniform System of Accounts, (2) estimated nuclear fuel costs, and (3) estimated purchased energy costs, excluding capacity or demand charges. The formula accounts for costs at the Company's plants, shared capacity, and affiliated company operations.
RATE ECR A SOUTHERN COMPANY ENERGY COST RECOVERY RATE PAGE EFFECTIVE DATE REVISION 3of6 November, 2001 Billings Second identifiable cost of fossil and nuclear fuel (together with costs, gains, or losses associated with emission allowances)...
AI summary This section of the document defines the Energy Cost Recovery (ECR) rate for Southern Company. It specifies that the rate is designed to recover the identifiable costs of fossil and nuclear fuels, including any associated gains or losses from emission allowances. It also accounts for the estimated average cost of these fuels in instances where specific costs are not actually identifiable, particularly regarding estimated inter-system sales.
- (4) Gains, losses and costs associated with Company's utilization of futures, options and over the counter derivatives (including, without limitation, futures contracts, puts, calls, caps, floors , collars, and swaps) for the purpose of...
AI summary The text outlines the methodology for calculating the Energy Cost Recovery (ECR) factor, specifically focusing on the correction factor (CF) used to adjust prior estimates to actual data. It describes the process for calculating net under- or over-recoveries for retail customers by subtracting wholesale and retail energy cost recoveries from total energy costs. Additionally, it addresses the transition from the Fuel Tariff (FT) Energy Cost Adjustment to the ECR rate, requiring initial estimates for specific months in 1981.
RULES AND REGULATION GOVERNING APPLICATION OF ENERGY COST RECOVERY RATE These rules and regulations are applicable to and are an integral part of Rate ECR. These rules and regulations established the procedures to be used in the determinat...
AI summary This text outlines the regulatory procedures for determining and adjusting the Energy Cost Recovery factor (ECRF). It establishes a timeline for the Company to submit estimates of energy costs and sales to the Commission. It specifies requirements for public hearings, the Company's burden of proof to justify rate increases based on cost fluctuations, and the notice periods required for proposing new factors to be incorporated into the Company's base rate schedules.
A SOUTHERN COMPANY PAGE EFFECTIVE DATE REVISION 5 of6 November, 2001 Billings Second Formal intervention by customers of the Company shall be permitted. The staff of the Commission and formal intervenors shall have the right to examine all...
AI summary The text outlines the formal procedures for determining the Energy Cost Recovery factor. It establishes the rights of Commission staff and formal intervenors to examine Company records, cross-examine witnesses, and submit rebuttal testimony. It specifies that rebuttal testimony must be submitted five days before the hearing. The Commission is required to issue an order for the factor within 35 days of the Company's submittal, with a provision that the Company's proposed factor becomes effective automatically if no order is issued by the 45th day.
- 3. The Company shall compute, record and report to the Commission the monthly and accumulated over or under-recovery of actual energy cost resulting from application of the Energy Cost Recovery factor as soon as available. - 4. It is the...
AI summary The text outlines the regulatory framework for the Energy Cost Recovery (ECR) mechanism. It requires the Company to report monthly over or under-recoveries resulting from the Energy Cost Recovery factor. The primary purpose of the Rate ECR is to ensure the Company recovers specific energy costs, including an adjustment to refund or collect differences between actual costs and estimated revenues. Additionally, it establishes that the Commission may disallow costs resulting from imprudent conduct and specifies that orders changing the recovery factor are final and subject to judicial review.
EXPERIENCE MODIFICATION FACTOR An Experience Modification Factor (EMF) decrement of0.0069 ¢I kWh and EMF interest decrement ofO.OOIO ¢I kWh is effective for service on and after July I, 2006 and will continue until June 30, 2007
AI summary The document specifies the application of Experience Modification Factor (EMF) decrements to the electricity cost recovery structure. Specifically, an EMF decrement of 0.0069 ¢/kWh and an EMF interest decrement of 0.0010 ¢/kWh are scheduled to take effect on July 1, 2006, and remain in force until June 30, 2007.
USE OF RIDER Since adjustments are already included in the Rates of the Company's current rate schedules which are effective for service on and after July 1, 2006, this Rider should not be used in addition to such rate schedules for bill c...
AI summary The document specifies that certain adjustments are already incorporated into the Company's current rate schedules, which became effective on July 1, 2006. Consequently, the Rider in question is not to be applied in addition to these existing rate schedules for the purpose of bill calculations. The text refers to a North Carolina Fifteenth Revised Leaf and a corresponding NCUC Docket Order.
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...
AI summary The text specifies the applicability of a fuel cost adjustment to the Utility's South Carolina retail electric rate schedules. It outlines that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one ten-thousandth of a cent using a specific formula (F=EIS + G/S1), subject to the Commission's determination of reasonableness and propriety.
STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the nearest 0.001 mill ($0.000...
AI summary The document outlines the methodology for Standard Contract Rider No. 60, which establishes the Fuel Cost Adjustment applicable to all retail rate schedules. It specifies that charges for electric service to retail customers will be adjusted—increased or decreased to the nearest 0.001 mill per KWH—based on a formula designed to recover or credit the costs associated with fuel. The formula is defined as the Fuel Cost Adjustment Factor, calculated by dividing total projected system fuel costs by estimated total energy sales, minus a fixed correction factor.
where: - 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the first month of the billing cycle and consisting of the following costs: - (a) the average cost of fossil fuel consumed due to the opera...
AI summary The text defines the methodology for calculating the fuel cost adjustment factor for native load customers. It specifies the components of estimated fuel expenses (F), including fossil and nuclear fuel costs for company-owned units and purchased energy, as well as estimated kilowatt-hour sales (S). The formula includes modifications for utility receipts taxes, a mechanism to reconcile differences between estimated and actual incremental fuel costs, and a specific fixed adjustment rate of $0.004520 per kilowatt-hour effective from 2007.
The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service: Energy Loss Factor Fixed Fuel Factor ($/KWH) A. Texas System 1.00000 0.03631 (I) B. Transmission Voltage (If customer is not specified below and...
AI summary The document outlines the Fixed Fuel Factors and Energy Loss Factors for the Empire District Electric Company. It specifies different fuel factors based on voltage levels of service, including transmission, primary, and secondary voltages. Additionally, it introduces the '16 YRIDER (Rider ECR)' (Energy Cost Recovery Rider), which allows the company to recover energy costs as defined in the tariff for specific rate schedules.
38.1 RECOVERY OF ENERGY COST (NR) Energy Cost Recovery Rider ECR ("Rider ECR") defines the procedure by which the "Energy Cost Rate" of Entergy Arkansas, Inc. ("EAI''. or "Company") shall be initially established and periodically redetermi...
AI summary The text describes the Energy Cost Recovery Rider (Rider ECR) for Entergy Arkansas, Inc. (EAI). This rider establishes the procedures for the initial determination and periodic redetermination of the 'Energy Cost Rate.' The primary purpose of this rate is to recover the Company's net fuel and purchased energy costs, which are specifically defined within the Rider ECR framework.
38.2 ENERGY COST RATE The Energy Cost Rate to be initially effective under this Rider ECR shall be determined in the manner prescribed by the Arkansas Public Service Commission ("Commission") in its final order in Docket No. 96-360-U and s...
AI summary The document outlines the rules for determining and applying the Energy Cost Rate under Rider ECR. The initial rate is established based on the Arkansas Public Service Commission's final order in Docket No. 96-360-U. Subsequently, the rate is subject to annual redetermination through specific filing procedures. The rate is applied to monthly billing energy in kilowatt-hours (kWh), with an exception for special rate contracts that do not contain specific provisions for energy cost recovery.
38.3 ANNUAL REDETERMINATION On or before March 15 of each year beginning in 1999, the Company shall file a redetermined Energy Cost Rate with the Commission. The redetermined Energy Cost Rate shall be determined by application of the Energ...
AI summary The text outlines the annual redetermination process for the Energy Cost Rate (ECR) for Entergy Arkansas, Inc. The Company is required to file a redetermined rate by March 15 annually, calculated using a specific formula and accompanied by supporting workpapers. The rate must reflect projected energy costs for the upcoming 12-month period, including a true-up adjustment for over- or under-recoveries from the previous calendar year. These rates are effective for a twelve-month 'Rider Cycle' starting in April.
38.4 INTERIM ADJUSTMENT Should a cumulative over-recovery or under-recovery balance arise during any Rider Cycle which exceeds ten (10) percent of the Energy Cost determined for the Energy Cost Period included in the most recently tiled ra...
AI summary The text outlines the conditions for an interim adjustment to the Energy Cost Rate under the Rider ECR. If a cumulative over-recovery or under-recovery balance exceeds ten percent of the Energy Cost determined for the most recently filed rate redetermination during a Rider Cycle, either the Arkansas Public Service Commission General Staff or the Company is permitted to propose a revision to the currently effective rate.
38.5 TERM This Rider ECR shall remain in effect until modified or terminated in accordance with the provisions of this Rider ECR or applicable regulations or laws. If this Rider ECR is terminated by a future order of the Commission, the En...
AI summary This section outlines the term and termination provisions for Rider ECR. It states that the rider remains in effect until modified or terminated by the Commission or law. In the event of termination, existing Energy Cost Rates will persist until an alternative recovery mechanism is approved. Furthermore, it mandates that any cumulative over-recovery or under-recovery resulting from the terminated rates must be adjusted in customer billings over a twelve-month period following the termination.
ENERGY COST RATE FORMULA ECR ENERGY COST RATE ECR (TUA + PEC) / PES (RT) WHERE, TUA TRUE-UP ADJUSTMENT FOR THE ENERGY COST PERIOD INCLUDING CARRYING CHARGES (1) = \sum_{j=1}^{12} (EC_j - (RR_j - PTU_j)) \ (1 + CCR \ ((21 - j) / 12)) (RT) W...
AI summary The text provides the mathematical formula for the Energy Cost Rate (ECR), which is calculated by dividing the sum of the True-Up Adjustment (TUA) and Projected Energy Cost (PEC) by the Projected Energy Sales (PES). The formula specifically defines the True-Up Adjustment, which accounts for energy costs including carrying charges, and details the components of energy costs such as fuel expenses charged to specific accounts, excluding certain retained share fuel charges for the Grand Gulf project.
ENERGY COST RATE FORMULA (CONT'D) = = CCR = REVENUE UNDER RIDER ECR FOR MONTH j OF THE ENERGY COST (RT) PERIOD PLUS AN IMPUTED LEVEL OF REVENUES FOR SALES (AT) UNDER SPECIAL RATE CONTRACTS WHERE THE ENERGY COST (AT) RATE IS NOT SEPARATELY...
AI summary The document provides a technical breakdown of the Energy Cost Rate formula, specifically detailing the calculation of the Carrying Charge Rate (CCR). It outlines the components of the Projected Energy Cost (PEC) for a given period, including the integration of revenues from special rate contracts, prior period true-up adjustments, and specific adjustments such as the Nuclear Refueling Outage Adjustment (NRFA). The formulas are intended to determine the rate structure for the Energy Cost (RT) period.
SCHEDULE: "FCR-18" PAGE EFFECTIVE DATE 2 of 2 With Bills Rendered for the Billing Month of July 2006 REVISION Original Zanionsproventendenning Co. 2 of 2 VVIIIn Bills Rendered for the Billing Month of July 2006 Original 9.00 - (7) net gain...
AI summary The document is a portion of Schedule 'FCR-18', which outlines specific components of a fuel cost recovery calculation. It specifically identifies the inclusion of net gains and losses from the Natural Gas and Oil Procurement and Hedging Program, as established in Docket No. 16134-U, as a factor in the calculation.
SENIOR CITIZEN- LOW INCOME ASSISTANCE: Qualifying customers, after certification by the Company, will be eligible for a fuel cost recovery credit of $6.00 monthly at their primary residence. To qualify, the customer must be certified as el...
AI summary The document outlines the 'SENIOR CITIZEN- LOW INCOME ASSISTANCE' program, which provides a monthly fuel cost recovery credit of $6.00 to qualifying customers at their primary residence. Eligibility is determined by the Company following a certification process based on the R-15 tariff or its successor. The provision specifies that there shall be no net credits and no carry-over of credits between billing periods.
where: 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the month immediately following the current billing cycle month and consisting of the following costs: (Cont'd on Sheet No. 3.18) ISSUED BY C...
AI summary The document provides a technical definition for 'F', which represents the estimated expense of fuel based on a three-month average cost starting after the current billing cycle month. It is part of the Thirty-second Revised Sheet No. 3.18 for the Indiana Michigan Power Company, issued under the authority of the Indiana Utility Regulatory Commission. The document specifies the effective date as December 23, 1997, and identifies the issuing officer as Coulter R. Boyle, III.
TERMS AND CONDITIONS OF SERVICE (Cont=d from Sheet No. 3.18) - B. The adjustment factor as computed above shall be further modified to allow the recovery of gross receipts taxes and other similar revenue based tax charges occasioned by the...
AI summary The text outlines the terms and conditions for fuel cost adjustments, including mechanisms to recover gross receipts taxes and adjustments based on incremental fuel costs from the previous three months. It further specifies that certain subsections are suspended due to a 2005 Settlement Agreement (Cause No. 42045-S1). During this suspension, I&M is required to file semi-annual applications for fixed fuel adjustment charges, ensuring that fuel costs are not offset by other expense decreases and that the charges do not result in an unauthorized return.
APPLICABLE. To Tariffs R.S., R.S.-L.M.-T.O.D. R.S.-T.O.D., S.G.S., M.G.S., M.G.S.-T.O.D., L.G.S., Q.P., C.I.P .-T.O.D., C.S.-l.R.P., M.W.,.O.L., end S.L. 1. The fuel clause shall provide for periodic adjustment per kwh of sales equal to th...
AI summary The text outlines the methodology for a fuel clause adjustment mechanism, which periodically adjusts the per-kWh sales rate based on the difference between fossil fuel costs in a base period and a current period. It defines 'Fuel costs (F)' to include costs from the utility's own plants, shared plants, and substitute power for forced outages, while excluding specific capacity charges and costs from intersystem sales. It also specifies the treatment of forced outages, noting that costs from Acts of God or public unrest may be included with Commission approval.
TARIFF F.A.C. (Cont'd) (Fuel Adjustment Clause) - 5. Sales (S) shall be all kwh's sold, excluding intmystem sales. Where, for any reason billed system sales cannot be coordinated with the fuel costs for the billing period, sales may be equ...
AI summary This section outlines the regulatory requirements for a utility's Fuel Adjustment Clause (F.A.C.). It defines 'Sales' (S) as all kilowatt-hours sold, excluding intersystem sales, and specifies that fuel costs include the invoice price plus transportation charges. The regulation mandates that utilities submit fuel purchase contracts, justify price escalations, and provide detailed cost support for tariff filings. Furthermore, it establishes a framework for oversight, including monthly filings, public hearings every six months to review past adjustments, and a comprehensive biennial review to disallow improper expenses.
AVAILABILITY OF SERVICE This schedule is a mandatory rider to all electric rate schedules. (1) The charge per KWH delivered under the rate schedules to which this fuel clause is applicable shall be increased or decreased during each month...
AI summary The text outlines the mandatory 'Availability of Service' fuel clause rider, which establishes the formula for monthly adjustments to the charge per KWH delivered. It defines how fuel costs (F) are calculated, including fossil fuel consumption in own plants, costs for forced generation or transmission outages, and costs for energy purchased for reasons other than economic dispatch. It specifically excludes capacity or demand charges and requires fuel costs to be based on weighted average inventory costing.
FUEL CLAUSE RIDER Kingsport Power is authorized under the terms of this rider to adjust customers' bills in each applicable tariff whenever the unit cost of fuel in the charges for power purchased from Appalachian Power Company under Feder...
AI summary The Fuel Clause Rider authorizes Kingsport Power to adjust customer billing based on the fluctuating unit cost of fuel purchased from Appalachian Power Company. The adjustment is triggered when the actual fuel cost deviates from a base unit price of 15.8563 mills per KWH, adjusted for losses. Calculations are performed monthly based on the most recent available calendar month data to ensure that customers pay the actual cost of fuel for the power consumed.
Fuel Adjustment Clause insurrection or acts of the public enemy, then the Company may, upon proper showing, with the approval of the Commission, include the fuel cost of substitute energy in the adjustment. (3) Sales (S) shall be determine...
AI summary The text outlines provisions regarding the Fuel Adjustment Clause, specifically addressing the inclusion of substitute energy costs during times of insurrection or acts of the public enemy, subject to Commission approval. It also defines the methodology for determining Sales (S) in kilowatt-hours, which includes the summation of net generation, purchases, and interchange-in.
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of...
AI summary The text defines the methodology for calculating the fuel cost per kilowatt-hour (F) to be included in the Utility's South Carolina retail electric rate schedules. It establishes a formula accounting for total projected system fuel costs (E), including fuel consumed in own plants, purchased power (unit, limited term, and economy), and intersystem sales, divided by projected system kilowatt-hour sales (S). The calculation also incorporates a cumulative difference (G) between fuel revenues and expenses. The current fuel cost is set at 2.500 cents per kilowatt-hour.
APPLICABILITY This adjustment is applicable to and is part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of a...
AI summary The document outlines the applicability of a fuel cost adjustment for the Utility's retail electric rate schedules in South Carolina. It specifies that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one-thousandth of a cent using a provided formula, provided the Commission deems the costs reasonable and proper.
PLUS (B) Fuel costs related to purchased power and applicable S02 emission allowances such as those incurred In unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated with...
AI summary The text defines the scope of 'PLUS' (Purchased Power and Limited-term power) fuel costs. It specifies that these costs include fuel and S02 emission allowances for power where such costs are identifiable and clearly stated on billing statements. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, explicitly excluding specific reservation and option charges while including total delivered costs.
RECOVERY OF ENERGY COST Energy Cost Recovery Rider ("Rider ECR ") defines the procedure by which the "Energy Cost Rate" of Southwestern Electric Power Company ("SWEPCO" or "Company") shall be initially established and periodically redeterm...
AI summary The text introduces the Energy Cost Recovery Rider (Rider ECR), which establishes the procedure for determining and periodically redetermining the 'Energy Cost Rate' for Southwestern Electric Power Company (SWEPCO). The primary purpose of this rate is to recover the Company's net fuel and purchased energy costs as defined within the specific provisions of the Rider ECR.
ENERGY COST RATE The Energy Cost Rate to be initially effective under this Rider ECR shall be determined in the manner prescribed by the Arkansas Public Service Commission ("APSC" or "Commission") in its final order in Docket No. 98-339-U...
AI summary The text outlines the methodology for determining and applying the Energy Cost Rate under the Energy Cost Recovery Rider (ECR). The rate is initially established based on the Arkansas Public Service Commission's final order in Docket No. 98-339-U and is subject to annual redetermination. The rate applies to monthly billing energy (kWh) for all customers, with estimated usage applied to unmetered service. Calculations are precise to the nearest $0.000001 and rounded to the nearest cent for billing.
ANNUAL REDETERMINATION On or before March 15 of each year beginning in 2000, the Company shall file a redetermined Energy Cost Rate with the Commission. The redetermined Energy Cost Rate shall be determined by application of the Energy Cos...
AI summary The document outlines the annual redetermination process for the Energy Cost Recovery Rider (Rider ECR) for the Southwestern Electric Power Company. The Company is required to file a redetermined Energy Cost Rate by March 15 annually, calculated using a specific formula and supported by detailed workpapers. The rate must account for projected energy costs for the upcoming 12-month period and include a true-up adjustment for any over-recovery or under-recovery from the preceding calendar year.
ADJUSTMENTS If prior to the annual redetermination of the Energy Cost Rate, Staff or the Company becomes aware of an event that is reasonably expected to occur and/or has occurred which will materially impact the Company's Energy Cost, eit...
AI summary The text outlines the procedures for adjusting the Energy Cost Rate Formula within the Energy Cost Recovery Rider (ECR). It specifies that if an event occurs that materially impacts the Company's Energy Cost prior to the annual redetermination, either the Staff or the Company may propose an adjustment. Additionally, it establishes a threshold for interim revisions, allowing for proposals if the cumulative over-recovery or under-recovery balance exceeds ten percent (10%) of the Historical Energy Cost Period.
PAYMENT FOR SERVICE AT CT Payment for Service Rider- See Rate Schedule 44. AT Original: Sheet No: R-27.3 Sheet 3 of 14 Replacing: Sheet No: Name of Company: SOUTHWESTERN ELECTRJC POWER COMPANY Kind of Service: Electric Class of Service: Al...
AI summary This document segment identifies the 'Payment for Service Rider' as a component of Rate Schedule 44 for the Southwestern Electric Power Company. It specifically references Rate Schedule No. 27, titled 'ENERGY COST RECOVERY RIDER (RJDER ECR),' which pertains to the recovery of energy costs for all classes of electric service.
ENERGY COST RATE FORMULA ECR ENERGYCOSTRATE ECR = \frac{TUA + (PEC \ JAF)}{PES} \ LCF + (M \ LCF) WHERE, TUA = \sum_{j=1}^{12} ((EC_j \ JAF) - (RR_j - PTU_j)) \ \left(1 + CCR \ \frac{21 - j}{12}\right) Where, E0 = ENERGY COST FOR MONTH) OF...
AI summary The document defines the mathematical formula for the Energy Cost Recovery Rider (ECR) for the Southwestern Electric Power Company. It details the components of the ECR calculation, including the Total Unit Average (TUA), Projected Energy Costs (PEC), and Junior Adjustment Factors (JAF), as well as the historical energy cost components (Fe, Pe, MST, and DHMV). The formula is intended to determine the rider rate based on fuel costs and system costs for all electric classes of service.
ATTACHMENT A (continued) Where Fe1 FUEL EXPENSE CHARGED TO ACCOUNT 501 LESS ACCOUNT 501 COSTS THAT FIT THE DEFINITION OF FERC ACCOUNT 152, LESS FUEL COST ASSOCIATED WITH SALES TRANSACTIONS IN MONTH j OF THE HISTORICAL ENERGY COST PERIOD Pe...
AI summary This document excerpt provides the mathematical formulas and definitions for components of the Energy Cost Recovery Rider (Rider ECR) for the Southwestern Electric Power Company. It specifies how fuel expenses, purchased energy expenses, and sales margins from affiliated and non-affiliated companies are calculated relative to historical energy cost periods. It also includes a specific adjustment for the Dolet Hills Mining Venture (DHMV) savings based on accumulated deferred fuel.
ATTACHMENT A (continued) If DHMV SAVINGfi.i > DHLC ACCUMULATED DEFERRED FUELj AND lf0.5 • DHMV SAVINGfi.i S UNAMORTIZED LITIGATION COS1j THEN DHMV;· = DHLC ACCUMULATED DEFERRED FUELj + 0.5• (DHMV SAVINGfi.i- DHLC ACCUMULATED DEFERRED FUEL)...
AI summary The document provides specific mathematical formulas and logic for calculating the Distribution Heat and Maintenance Value (DHMV) for the Southwestern Electric Power Company. It details the conditions under which DHMV is calculated based on savings, accumulated deferred fuel, and unamortized litigation costs. It also defines the DHMV Benchmark based on the total mmBTU delivered by the Dolet Hills Lignite Company during the Historical Energy Cost Period.
Treatment of Non-Affiliated Sales Margins: In consideration of incorporating a fixed minimum level of off-system sales margins in the energy cost recovery rider, and in recognition of the differences in off-system sales margins pre and pos...
AI summary The document discusses the treatment of non-affiliated sales margins within the Energy Cost Recovery Rider (ECR) for Southwestern Electric Power Company (SWEPCO). It outlines how off-system sales margins—derived from pre-merger Joint Operating Agreements and post-merger System Integration Agreements with American Electric Power (AEP)—are shared between customers and shareholders. Specifically, it establishes a base off-system sales margin of $583,539 to be credited to customers, with 100% of additional margins up to $758,600 also allocated to retail customers in the Arkansas jurisdiction.
PRE-MERGER Company Base Off-System Sales margin in The Test Year Threshold Level for 15% Sharing by Shareholders in Off-System Sales Threshold Level for 50% Sharing by Shareholders in Off-System Sales SWEPCO $583,539 $758,600 $1,167,078 (b...
AI summary The document outlines the post-merger financial arrangements for off-system sales margins in Southwestern Electric Power Company's (SWEPCO) Arkansas retail jurisdiction. It establishes a base off-system sales margin of $758,600 to be included in the Energy Cost Recovery Rider and credited to customers annually. It further specifies a tiered sharing structure: for margins between $758,600 and $1,167,078, 85% is credited to customers and 15% to stockholders; for margins exceeding $1,167,078, the split is 50% to customers and 50% to stockholders.
Treatment of Affiliated Sales Margins Margins allocated to SWEPCO's Arkansas retail jurisdiction resulting from energy sales transactions with affiliated electric operating companies will be reflected in the calculation of the Energy Cost...
AI summary The document specifies that margins from energy and capacity sales transactions with affiliated electric operating companies in SWEPCO's Arkansas retail jurisdiction must be included in the Energy Cost Recovery Rider (ECR) calculations. It outlines a two-step methodology for deriving the jurisdictional allocation factor: first, adjusting meter kWh to generation kWh using energy loss factors, and second, calculating the Arkansas-specific share based on the proportion of total generation kWh across all jurisdictions.
Treatment ofthe Dolet Hills Mining Venture Adjustment In consideration of expected fuel cost savings resulting from the replacement of the former mine operator, SWEPCO will be allowed to recover the costs associated with the Do let Hills L...
AI summary The document outlines the regulatory treatment for the Dolet Hills Mining Venture (DHMV) adjustment for Southwestern Electric Power Company (SWEPCO). To protect ratepayers from high fuel costs associated with the Dolet Hills Lignite Company (DHLC), SWEPCO is permitted to recover costs only up to a calculated DHMV Benchmark. This benchmark is based on specific contractual quantities and prices, adjusted annually by the GDP Implicit Price Deflator. Costs exceeding this benchmark are designated as a negative DHMV Adjustment and must be deferred for ratemaking purposes.
FUEL ADJUSTMENT RIDER- LOUISIANA All kilowatt-hours sold will be adjusted to reflect the current cost offuel. For electric service billed under applicable rate schedules for which there is no metering, the monthly usage shall be estimated...
AI summary The document outlines the methodology for calculating the Fuel Adjustment Factor (F AF) for electric service in Louisiana. It specifies that all kilowatt-hours sold will be adjusted based on current fuel costs. For unmetered services, the Company will estimate monthly usage to apply the factor. The calculation formula incorporates variables such as the Fuel cost per kilowatt-hour (F), Junior Adjustment Factor (JAF), Implicit Price Deflator (I), Load Factor (LF), S02 emission allowances (S), Annual Load Factor (ALF), Maintenance and System Taxes (M), and other specific cost components.
Definitions F = Fuel Cost: Fuel costs incurred by the Company for the second preceding month for retail jurisdictional sales. The cost of fossil fuel shall include only those items includible in FERC Account 151 , less excludable costs def...
AI summary This document provides technical definitions for various components used to calculate fuel costs and service riders within the Louisiana Service Territory. It defines 'Fuel Cost' (F) based on FERC accounts, including costs for consumed fuel, purchased energy, and revenues from sales. It also establishes formulas for the Jurisdictional Allocation Factor (JAF), Loss Factor (LF), Average Loss Factor (ALF), Interest (I), and a specific Surcharge formula used to account for variances in fuel recovery.
Definitions: A = Cumulative Over/Under Recovery (Third Preceding Month) B =Fuel Cost/kWH Delivered \left[ \left( \frac{(F \ JAF) + I}{K} \right) \ LF \right] - \left( (S / ALF) \ LF \right) (Second Preceding Month) - C = LA retail jurisdic...
AI summary This document excerpt provides a list of mathematical definitions and variables used in a regulatory tariff manual for the Public Utility Commission of Texas. It defines components for calculating fuel costs, recovery factors, and specific costs associated with the South Hallsville Mine reclamation for the Southwestern Electric Power Company (SWEPCO). The formulas involve variables for fuel costs, load factors, emission allowances, and kilowatt-hour sales.
PURCHASED POWER COST RECOVERY FACTOR (PCRF) A PCRF will be added to the energy charges for each rate schedule on a per kWh basis. The factor will be determined as follows: PCRFcloss = [(P x AF)- CAc,,..J!ESc,,.. Where: - P = Estimated purc...
AI summary The document outlines the methodology for calculating the Purchased Power Cost Recovery Factor (PCRF), a new component to be added to energy charges on a per-kWh basis. The PCRF is designed to recover estimated purchased power costs (excluding fuel) that exceed the amounts recovered in base rates. The calculation incorporates a demand allocation factor (AF) based on the most recent cost-of-service study, an estimated annual kWh sales figure (ES), and a correction amount (CA) to account for variances between actual allocated costs and revenues from the preceding twelve months.
The following are the allocation factors to be used in the calculation of the PCRF: Rate Class Demand Allocation Factor (AF) Residential Lighting 0.130000 Residential All Electric 0.013154 Residential Space Heating 0.004100 Residential Wat...
AI summary The document specifies the demand allocation factors (AF) used to calculate the Purchased Power Cost Recovery Factor (PCRF). It provides a detailed breakdown of factors for various rate classes, including residential lighting, space heating, heat pumps, irrigation, and various industrial and public authority categories, as well as specific distribution and transmission classes.
FUEL CHARGE RIDER-B The charge for service under Virginia Electric and Power Company's Filed Rate Schedules 1, IP, IS, IT, IW, 5, 5C, 5P, 6, GS-I, GS-2, GS-2T, GS-3, GS-4, 6TS, 7, 8, IO, 25, 27, 28 and 29, as well as applicable energy char...
AI summary The document outlines a rate increase of 0.135 cents per kilowatt-hour for various service schedules of the Virginia Electric and Power Company. This increase is specifically designated as 'Fuel Charge Rider-B,' which is intended to recover the Virginia fuel deferral balance as of December 31, 2003, in accordance with a previous settlement. The rider is supplementary to Fuel Charge Rider-A and is scheduled to remain in effect until the balance is recovered or until June 30, 2007.
ORDER ESTABLISHING FUEL FACTOR On October 21, 2005, Appalachian Power Company ("Appalachian" or the "Company") filed with the State Corporation Commission ("Commission") an application along with testimony, exhibitS, and a proposed tariff...
AI summary Appalachian Power Company filed an application with the State Corporation Commission to increase its fuel factor from 1.420 to 1.785 per kWh, effective January 1, 2006. The company argues this adjustment is necessary to recover appropriate fuel expenses for the 2006 calendar year. The Commission established a procedural schedule, allowing for interim implementation of the factor while investigating the application. Several parties, including the Division of Consumer Counsel and the Old Dominion Committee, filed notices of participation.
For the Attorney General: Len G. Green, Assistant Attorney General, North Carolina Department of Justice, Post Office Box 629, Raleigh, North Carolina 27602-0629 Public Staff witness Edwards testified that he generally agreed with PEC, pro...
AI summary The Commission reviewed whether transaction-related hedging costs incurred by PEC to stabilize natural gas costs should be recoverable as fuel costs. While CIGFUR II argued that these costs fall outside the scope of G.S. 62-133.2, the Commission agreed with Public Staff and PEC. The Commission concluded that direct, transaction-related costs arising from prudent efforts to mitigate natural gas price volatility should be recoverable as fuel costs, provided they meet the standards of reasonableness and prudence.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB)
48 passages
The kWh charges shown reflect adjustment pursuant to Rates RSE and CNP for application to monthly bills effective for April 2006 billings. PAGE EFFECTIVE DATE REVISION 3 of 3 January, 2006 Billings Fourteenth TERM OF CONTRACT
AI summary The document specifies that the kilowatt-hour (kWh) charges are subject to adjustments based on the Rates RSE and CNP. These adjustments are scheduled to be applied to monthly customer bills starting with the April 2006 billing cycle. The table provided indicates that the current information is based on the fourteenth revision effective for January 2006 billings.
ENERGY COST RECOVERY The amount calculated at the above rate will be increased under the provisions of the Company's Rate ECR (Energy Cost Recovery) by applying the effective Energy Cost Recovery Factor.
AI summary The text specifies that the calculated amount will be subject to an increase based on the provisions of the Company's Rate Energy Cost Recovery (ECR). This adjustment is determined by applying the effective Energy Cost Recovery Factor to the base rate.
ADJUSTMENT FOR COMMERCIAL OPERATION OF CERTIFICATED NEW PLANT Rate CNP (Adjustment for Commercial Operation of Certificated New Plant) is incorporated in this rate and will be applied to increase kWh charges calculated hereunder.
AI summary The document addresses the inclusion of Rate CNP (Adjustment for Commercial Operation of Certificated New Plant) within the current rate structure. This specific rate adjustment is intended to increase the kilowatt-hour (kWh) charges calculated in the proceeding to account for the commercial operation of a newly certificated plant.
NATURAL DISASTER RESERVE The amount calculated at the above rate will be increased under the provisions of the Company's Rate Rider NDR (Natural Disaster Reserve) by applying the effective NDR Charge.
AI summary The text specifies the calculation method for the Natural Disaster Reserve (NDR). It states that the amount determined at a specific rate will be further increased by applying the effective NDR Charge, as stipulated under the provisions of the Company's Rate Rider NDR.
ALABAMA POWER COMPANY BILL CALCULATION FACTORS 2006 December 2.48/6.15 24.000 23.439 22.108 21.534 -2.430 UNION ELECTRIC COMPANY
AI summary The document provides a table of bill calculation factors for Alabama Power Company for the month of December 2006. It lists numerical values across several columns, including a specific figure of 2.48/6.15 and a final value of -2.430. The document also serves as a header for a subsequent section regarding Union Electric Company.
NAME OF OFFICER TITLE ADDRESS i MOIN FLECTRIC COMPANY kVar = kilovar billing units kVarh = metered kilovarhours kWh = metered kilowatthours kW = metered kilowatts 1 0.4843 = kilovar requirement at 90% lagging power factor. 1 1 Where in the...
AI summary This document excerpt outlines specific tariff rules for reactive power supply and optional Time-of-Day (TOD) service for Large Primary Service customers. It specifies the formula for kilovar requirements at a 90% lagging power factor, allows for alternative agreements for self-generation customers, and establishes 12-month minimum commitment periods for the TOD option with specific cancellation penalties. The rates were issued pursuant to a 1993 Order from the Public Service Commission of Missouri.
Rider B DISCOUNTS APPLICABLE FOR SERVICE TO SUBSTATIONS OWNED BY CUSTOMER IN LIEU OF COMPANY OWNERSHIP \ A. Where a substation provided or leased by Customer transforms all or a part of the service from a delivery voltage of 34,500 volts o...
AI summary The text introduces Rider B, which outlines specific discounts applicable for service to substations owned by customers rather than the Company. It specifies that when a customer-provided or leased substation transforms service from 34,500 volts or higher to a lower voltage, the Company will adjust meter readings and apply discounts from its applicable rate schedule.
The customer will receive a credit for each entire billing month in which the customer-owned meter is installed and functioning at the customer's service location. The credit shall be the following: Delivery Voltage Secondary Primary Subtr...
AI summary The text outlines the terms for a monthly metering credit provided to customers who own and maintain their own electric service meters. Credits are assigned based on the delivery voltage level, ranging from $0.98 for secondary, primary, and subtransmission systems to $4.09 for transmission systems. Customers have the right to request the Company to replace a customer-owned meter with a Company-owned meter, which will result in the customer being charged for the replacement cost and the cessation of the monthly credit.
Customers who notify the Company of their intention to discontinue service under this schedule shall be responsible for the cost of removing the customer-owned meter and installing a Company-owned meter. However, such customers who are mov...
AI summary The text outlines the responsibility for costs associated with changing meter types when a customer discontinues service under a specific schedule. Customers who switch to a schedule requiring customer-owned metering are only responsible for the costs of necessary metering changes, rather than the full cost of removing and installing a Company-owned meter.
CUSTOMER-OWNED METERS (Cont'd) Customers may, at any time upon request to the Company, discontinue ownership of the electric service meter. Upon such a request, the Company will replace the Customer-owned meter with a Company-owned meter a...
AI summary The text outlines the procedures and costs associated with customers who wish to discontinue ownership of their electric service meters. Customers requesting a transition to Company-owned meters must pay the replacement costs and will lose their monthly metering credit. Specific cost-sharing rules apply for customers moving to different schedules: those moving to another customer-owned meter schedule only pay for required changes, while those moving to a Company-owned meter schedule bear the full replacement cost.
METERED VOLTAGE ADJUSTMENT The rates set forth in this Schedule are based upon the delivery and measurement of energy at the same voltage. When the measurement of energy occurs at a voltage different than the delivery voltage, the measurem...
AI summary This text outlines the procedures for metered voltage adjustments when energy is measured at a different voltage than the delivery voltage. The Company reserves the right to compensate for these differences using loss compensating equipment, formulas, or specific multipliers. Specifically, measurements at the low-side of customer-owned transformers are multiplied by 1.01, while measurements at the high-side of Company-owned transformers are multiplied by 0.98 to ensure accurate billing of KWH, KW, and KVAR.
EQUIPMENT SUPPLIED BY CUSTOMER Customers who as of October 7, 1983, owned, operated and maintained all equipment and apparatus beyond the delivery point of service, were receiving equipment credit for such ownership, and whose service was...
AI summary The document specifies a retail transmission credit for customers who owned and maintained all equipment beyond the delivery point of service as of October 7, 1983. This credit applies to customers served at a primary delivery voltage of 34,500 volts. The credit amount is set at $0.54 per KW for the combined sum of on-peak and off-peak excess monthly billing demands, specifically for those billed under the primary delivery voltage rates of the schedule.
LOCAL TAX ADJUSTMENT (C) To bills for electric service supplied within specified municipalities or political subdivisions which impose taxes based upon the amount of electric service sold or revenues received by the Company, as specified o...
AI summary The document describes the methodology for applying a local tax adjustment to electric service bills. It specifies that a surcharge will be added to bills for service supplied within certain municipalities or political subdivisions. This surcharge is calculated based on percentages provided on specific sheets (4-2, 4-3, and 4-4) to ensure the Company can recover taxes imposed on the amount of electric service sold or revenues received.
ANNUAL MINIMUM: $511,470 Any annual minimum deficiency will be determined during the April billing cycle for the previous 12-month period. For a customer who has taken service on this schedule for less than 12 months, the annual minimum wi...
AI summary The document establishes an annual minimum charge of $511,470 for a specific service schedule. It specifies that any annual minimum deficiency will be calculated during the April billing cycle for the preceding 12-month period. Additionally, for customers who have been on this service schedule for less than a full year, the annual minimum will be prorated based on their actual months of service.
SPECIAL TERMS AND CONDITIONS: For Customers who have more than one metering point to serve contiguous facilities or properties, the coincident demand from all such meters must not exceed 25,000 kVA in order to receive service under this sc...
AI summary The text outlines special terms and conditions for customers seeking service under a specific rate schedule. Key requirements include a coincident demand limit of 25,000 kVA for contiguous facilities, a minimum kVA demand of 2,500 for customers with a power factor below 80%, and a prohibition on using resistance load banks to artificially inflate demand. It also specifies grandfathering for existing customers who installed demand-side management measures before May 1, 1992, and notes that monthly rates are subject to various adjustments including tax and energy efficiency riders.
APPLICABLE: To Customers in the State of Idaho where the Company has electric service available. This Power Cost Adjustment shall be applicable to all retail customers for charges for electric energy sold and to the flat rate charges for C...
AI summary The text defines the scope and purpose of a Power Cost Adjustment for retail customers in the State of Idaho where the Company provides electric service. The adjustment applies to electric energy charges as well as flat rate charges for street and area lighting. Its primary function is to recover or rebate the variance between actual and allowed net power supply costs.
APPLICABLE: To Customers in the State of Idaho where the Company has electric service available. This Energy Efficiency Rider or Rate Adjustment shall be applicable to all retail customers for charges for electric energy sold and to the fl...
AI summary The document specifies the applicability of an Energy Efficiency Rider or Rate Adjustment. It applies to all retail customers in the State of Idaho where the Company provides electric service. The adjustment covers charges for electric energy sold, as well as flat rate charges for Company-owned or Customer-owned Street Lighting and Area Lighting Service. The primary purpose of this rate adjustment is to recover costs associated with providing energy efficiency services and programs to customers.
Special Terms and Conditions (Contd.) - 2. All wiring, pole lines, wires, and other electrical equipment and apparatus located beyond point of connection of Customer's service lines with the lines of Company are considered the distribution...
AI summary This section outlines special terms and conditions regarding the distribution of electrical services. It clarifies that equipment beyond the point of connection is the customer's responsibility, except for certain metering equipment. It addresses the company's policy on providing transformations for primary service, noting that excess facilities charges apply for unusual requests. Additionally, it defines metering requirements for single locations and establishes a 'Maintenance Period Provision' allowing customers to receive prorated maximum load charges during scheduled maintenance, subject to a $500.00 fee.
\ Subject to: Standard Contract Rider No. 60-Fuel Cost Adjustment Standard Contract Rider No. 62—Qualified Pollution Control Property Revenue Adjustment Standard Contract Rider No. 63—SO 2 and NO x Emission Allowance Adjustment Standard Co...
AI summary The document lists several Standard Contract Riders that modify the terms of utility contracts. These riders address various cost adjustments and credits, including fuel costs, pollution control property revenue, emission allowances, merger savings, demand side management, purchased power costs for peak load, Midwest ISO management costs, summer reliability, and clean coal operating costs. These adjustments are effective as of November 1, 2006.
Issued: November 1, 2006 Fuel Cost Rider 60 in Rates Fuel Adjust. Jan '06 Apr '06 Jui'06 Oct '06 ./ $ 0.014484 $ 0.000232 0 014484 ,~-<~?~f-=t. £.~ 0.014484 0.001052 J 0.007713/ 0.014484 Average 0.002307/ ._l_u_Rc_14_-_o_u_K_E_E_N_ER_G_Y_I...
AI summary This document provides a quarterly rider update for Keen Energy Services for the first and second quarters of 2006. It lists specific monetary adjustments for various riders, including Fuel Rider 60, Qualified Pollution-Rider 62, Emission Allowance Riders, DSM On-Going Expenses, Midwest ISO Management Cost and Revenue Adjustment, Summer Reliability Adjustment, and Clean Coal Operating Cost. The data is broken down by specific customer classes (RS, cs, LLF, HLF, TS) and specifies effective dates for the adjustments.
- (2) Efffectlve First Billing Cycle of September 2006 OCT - DEC 2006 QUARTER 4 RS cs LLF HLF TS Fuel Rider 60 $0.007713 $0.007713 $0.007713 $0.007713 $0.007713 Qualified Pollution-Rider 62 $0.001480 $0.001560 $0.001516 0.652214111 $0.0011...
AI summary The document presents a table of various rate riders and their associated costs for the October - December 2006 quarter. It specifies the specific dollar amounts for components including the Fuel Rider, Qualified Pollution-Rider, Emission Allow. Rider, Merger Savings Credit, Demand-Side Management (DSM) On-Going Expenses, Midwest ISO Management Cost and Revenue Adjustment, Summer Reliability Adjustment, and Clean Coal Operating Cost across different service types (RS, CS, LLF, HLF, TS). It also notes that the Rate HLF factor is billed on non-coincident demand.
STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the nearest 0.001 mill ($0.000...
AI summary The document defines Standard Contract Rider No. 60, which establishes the mechanism for the Fuel Cost Adjustment applicable to all retail rate schedules. It specifies that electric service charges for the Company's retail customers will be adjusted (increased or decreased) to the nearest 0.001 mill per KWH. The adjustment is designed to recover or credit fuel costs based on a specific formula involving the ratio of fuel costs to sales (F/S) minus a constant of $0.014484.
where: - 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the first month of the billing cycle and consisting of the following costs: - (a) the average cost of fossil fuel consumed due to the opera...
AI summary The text defines the methodology for calculating the fuel cost adjustment factor, specifically identifying the components of fuel expense (F) and estimated kilowatt-hour sales (S). It outlines the inclusion of fossil and nuclear fuel costs for native load customers, net energy costs for economic dispatch, and adjustments for utility receipts taxes. Additionally, it specifies a fixed fuel cost adjustment rate of $0.007713 per kilowatt-hour effective October 2006 and provisions for recovering costs for power purchases exceeding monthly benchmarks.
STANDARD CONTRACT RIDER NO. 62 QUALIFIED POLLUTION CONTROL PROPERTY REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS The applicable charges for electric service to the Company's retail customers, to the extent so served, shall include a...
AI summary The document outlines the methodology for the Qualified Pollution Control Property Revenue Adjustment for retail electric service customers. It specifies that these charges reflect the rate base treatment for qualified pollution control property as per established regulations. The revenue adjustment is calculated by multiplying a specific adjustment factor (rounded to the nearest 0.001 mill) by the customer's monthly billed or estimated kilowatt-hours, depending on whether the service is metered or unmetered.
where: - 1. "a" is the jurisdictional cost of the Company's cumulative qualified pollution control property including costs of completed capital projects or parts of capital projects that comply with provisions of Commission Rule 170 lAC 4...
AI summary The text defines the components and methodology for calculating the Qualified Pollution Control Property Revenue Adjustment Factor by Rate Group. It specifies that the calculation includes the jurisdictional cost of qualified pollution control property (complying with Commission Rule 170 lAC 4-6), the Company's weighted average cost of capital, a revenue conversion factor after interest expense synchronization, and specific production demand allocators and adjusted billing cycle kilowatt-hour sales for individual retail rate groups.
STANDARD CONTRACT RIDER NO. 62 QUALIFIED POLLUTION CONTROL PROPERTY REVENUE ADJUSTMENT FACTOR APPLICABLE TO RETAIL RATE GROUPS Qualified Pollution Control Property Qualified Pollution Control Property Revenue Adjustment Line Revenue Adjust...
AI summary The document outlines Standard Contract Rider No. 62, which establishes the Qualified Pollution Control Property Revenue Adjustment Factor for various retail rate groups. It provides specific financial factors per kilowatt-hour (KWH) and non-coincident kilowatts (KW) for different service categories, including Residential Service (RS), Commercial Service (CS), and various industrial and transmission service rates. The rider serves to adjust revenues based on qualified pollution control property investments.
STANDARD CONTRACT RIDER NO. 63 S02AND NOx EMISSION ALLOWANCE ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the neares...
AI summary The text describes a specific contractual rider (No. 63 S02) designed to adjust retail electric service charges based on the costs of Sulfur Dioxide (SO2) and Nitrogen Oxides (NOx) emission allowances. The adjustment is calculated to the nearest 0.001 mill per kWh using a specific mathematical formula. This mechanism ensures that the Company can recover or credit the costs associated with these environmental emission allowances across all retail rate schedules.
where: - 1. " S02" and "NOx'" emission allowances costs shall be defined as the estimated expense of S02 and NO. emission allowances applicable to native load customers based on estimated average costs over the three month period beginning...
AI summary The text defines the methodology for calculating SO2 and NOx emission allowance costs for native load customers. It specifies that costs are based on three-month average estimates, including costs from the Company's own generating units (per FERCUSOFA standards), costs from purchased energy for economy and reliability, and net gains or losses from allowance trading. The formula includes adjustments for utility receipts taxes and a reconciliation mechanism to align estimated costs with actual costs incurred.
Availability The applicable energy charges for service to the Company's retail electric customers shall be decreased monthly to reflect the sharing of the Cinergy Corp. I Duke Energy Corporation merger savings, net of merger costs, per the...
AI summary The document outlines the mechanism for applying merger savings credits to retail electric customers following the merger of Cinergy Corp. and Duke Energy Corporation. The energy charges for the Company's retail customers will be decreased monthly to reflect these savings, net of merger costs, as per the approved merger savings sharing plan. The credit rider is scheduled to commence 30-60 days after the merger is finalized and will remain active for a period of twelve months before expiring automatically.
STANDARD CONTRACT RIDER NO. 66 DEMAND SIDE MANAGEMENT ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS A. The applicable charges for electric service to the Company's retail electric customers shall include a charge to recover on-going Demand S...
AI summary This document outlines Standard Contract Rider No. 66, which establishes the mechanism for recovering ongoing Demand Side Management (DSM) expenses from retail electric customers. It defines the calculation of a monthly DSM billing adjustment by multiplying a specific DSM adjustment factor by the monthly kilowatt-hour usage. Notably, the adjustment is excluded for commercial and industrial customers with an annual billed peak demand exceeding 500 kilowatts. The formula also accounts for the recovery of utility receipts taxes associated with these costs.
ASSIGNMENT OF DEMAND SIDE MANAGEMENT (DSM) ON-GOING COST RECOVERY BY RETAIL RATE GROUP BASED ON THE PROVISIONS OF THE COMMISSION'S ORDERS IN CAUSE NOS. 41875,42325 AND 42612 Line No. Retail Rate Group (Note) Calendar Year2006 On-Going Expe...
AI summary The document outlines the assignment of Demand-Side Management (DSM) on-going cost recovery across various retail rate groups. It specifies that the total retail on-going expense for the 2006 calendar year is $5,650,000, with the majority ($5,125,000) assigned to the Residential Service (RS) rate. Notably, the text includes a provision excluding commercial and industrial customers with an annual peak demand exceeding 500 kW from these on-going expenses.
Standard Contract Rider No. 67 Recovery of Preapproved Purchased Power Costs to Meet Retail Customer Peak Load Requirements (Purchased Power Tracker) On April 17, 2004, the Commission approved the recovery of certain jurisdictional purchas...
AI summary The document outlines Standard Contract Rider No. 67, which establishes a mechanism for the recovery of preapproved purchased power costs. These costs are specifically associated with meeting the peak load requirements of retail customers within the IURC jurisdiction. The rider ensures that these charges are recovered separately from the fuel adjustment charge. It specifies that retail electric service rates will be increased based on a formula involving a Purchased Power Factor to account for the estimated costs of purchased power.
Standard Contract Rider No. 67 Recovery of Preapproved Purchased Power Costs to Meet Retail Customer Peak Load Requirements (Purchased Power Tracker) Line No. Rate Groups Purchased Power Factor Per kWh to be Applied to Customer Bills Begin...
AI summary The document outlines Standard Contract Rider No. 67, which establishes the recovery of preapproved purchased power costs required to meet retail customer peak load requirements. The provided table specifies the Purchased Power Factor per kWh to be applied to customer bills beginning with the effective date of the Order in Cause No. 42359. Currently, all listed rate groups, including residential, commercial, and industrial categories, show a factor of $0.000000.
STANDARD CONTRACT RIDER NO. 68 MIDWEST INDEPENDENT SYSTEM OPERATOR ("MIDWEST ISO") MANAGEMENT COST AND REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS The applicable charges for electric service to the Company's retail electric custome...
AI summary This document outlines Standard Contract Rider No. 68, which establishes the mechanism for adjusting electric service charges for retail customers based on the operation and maintenance expenses of the Midwest Independent System Operator (MIDWEST ISO). The adjustment is calculated by applying a specific Management Cost and Revenue Adjustment Factor to the monthly billed or estimated kilowatt-hours consumed by customers over three consecutive billing cycles.
where: - 1. "a" is the Midwest ISO Management Costs billed PSI Energy, Inc., or a designee of PSI, under Service Schedule 10 - ISO Cost Recovery Adder of the Open Access Transmission and Energy Markets Tariff for the Midwest Independent Tr...
AI summary The document defines specific cost components related to the Midwest ISO Management Costs billed to PSI Energy, Inc. It identifies five distinct categories of costs and revenues (a through e), including ISO Cost Recovery Adders for transmission and energy market support, and standard market design costs. Additionally, it specifies a three-month average pro forma level of $1,389,000 for Midwest ISO Management Costs, which is included in the determination of basic charges for electric service.
STANDARD CONTRACT RIDER NO. 68 MIDWEST INDEPENDENT SYSTEM OPERATOR ("MIDWEST ISO") MANAGEMENT COST AND REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS ALLOCATED SHARE OF RETAIL PEAK DEMAND FOR THE COMPANY'S RETAIL CUSTOMERS BY RATE GRO...
AI summary The text introduces Standard Contract Rider No. 68, which establishes a management cost and revenue adjustment for the Midwest Independent System Operator (MIDWEST ISO) applicable to retail rate groups. It specifies that the allocated share of retail peak demand for the Company's retail customers is determined as a percentage of the total retail peak demand developed for cost of service purposes in Cause No. 42359, based on data from the twelve-month period ending September 30, 2002.
STANDARD CONTRACT RIDER NO. 70 SUMMER RELIABILITY ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail electric customers shall be increased or decreased, to the nearest...
AI summary The document outlines Standard Contract Rider No. 70, which establishes a formula for the Summer Reliability Adjustment Factor. This adjustment is designed to recover or credit retail electric customers for the net jurisdictional costs of summer reliability purchases, PowerShare® program costs, and net profits from off-system sales. The formula incorporates variables such as purchased power capacity costs, PowerShare® bill credits, coincident system peak demand allocations, off-system sales profits, and annual kilowatt-hour sales, while allowing for adjustments for utility receipts taxes and annual reconciliations.
STANDARD CONTRACT RIDER NO. 70 SUMMER RELIABILITY ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES Estimated Summer Reliability Factor Per kWh Line to be Applied to Customer Line No. Rate Groups Bills No. (A) RateRS $0.000385 2 Rates CS...
AI summary The document outlines Standard Contract Rider No. 70, which establishes a Summer Reliability Adjustment applicable to all retail rate schedules. It provides specific estimated summer reliability factors per kWh for various rate groups, including residential, commercial, and industrial customers, as well as specific industrial entities like NUCOR and Air Liquide. The adjustment became effective during the first billing cycle of November 2006.
STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS The applicable charges for electric service to the Company's retail customers, shall be increased or decreased to the nearest 0.00...
AI summary Standard Contract Rider No. 71 establishes a mechanism for adjusting retail electric service charges to recover clean coal operating costs, specifically depreciation and operation and maintenance expenses. The adjustment is to be updated and reconciled by the Company at least every six months. The rider specifies that charges shall be adjusted to the nearest 0.001 mill per kWh, with the specific revenue adjustment factor determined by a formula based on various cost and rate group components.
Where: - 1. "a" is the forecasted depreciation expense applicable to investments in clean coal energy projects that comply with provisions of Ind. Code 8-1-8.8. For purposes of determining the value of depreciation expense, the clean coal...
AI summary The text defines the components of a clean coal operating cost revenue adjustment factor. It specifies how to calculate forecasted depreciation expenses over an eighteen-year period, identifies incremental operation and maintenance expenses (O&M) as recorded under FERCUSOFA standards, and establishes the use of a revenue conversion factor and jurisdictional production demand allocators. The factor is designed to adjust for the difference between estimated and actual incremental operating costs experienced by retail rate groups.
STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS . Clean Coal Clean Coal Operating Cost Operating Cost Revenue Adjustment Line Revenue Adjustment Factor Per Line No. Retail Rate G...
AI summary The document outlines Standard Contract Rider No. 71, which establishes the Clean Coal Operating Cost Revenue Adjustment for various retail rate groups. It provides specific revenue adjustment factors per kilowatt-hour (KWH) and non-coincident kilowatts (KW) for different customer categories, including Residential Service (RS), Commercial Service (CS), and various industrial and transmission service rates. The rider became effective on November 1, 2006.
ADJUSTMENT FOR NET REVENUES FROM WHOLESALE SALES The Company's Adjustment for Net Revenues from Wholesale Sales ruder will apply to service supplied to establishments classified as "Manufacturing Industries" by the Standard Industrial Clas...
AI summary The text defines the scope of the 'Adjustment for Net Revenues from Wholesale Sales' rule. This adjustment applies specifically to establishments classified as 'Manufacturing Industries' under the Standard Industrial Classification Manual, provided that more than 50% of their electric energy consumption is dedicated to manufacturing processes. The currently approved adjustment is noted as being integrated into the rate for Industrial Service.
4. Credit and Credit Computation: Each month, a determination of the interruptible capacity available to the Company will be made in order to compute a credit. All energy consumed at a level above the Firm Contract Demand during the Exposu...
AI summary The document outlines the methodology for calculating monthly credits for customers under an interruptible power service. The credit is based on the Effective Interruptible Demand (EID), which is calculated by dividing the energy consumed above the Firm Contract Demand during the Exposure Period (excluding Interruption Periods) by the duration of those periods. This figure is then reduced by the monthly maximum demand occurring during any Interruption Period. The final credit amount is determined by multiplying the EID by a rate of $3.50 per kilowatt.
EXPERIENCE MODIFICATION FACTOR An Experience Modification Factor (EMF) decrement of 0.0069 ¢ / kWh and EMF interest decrement of 0.0010 ¢ / kWh is effective for service on and after July 1, 2006 and will continue until June 30, 2007
AI summary The document specifies the application of an Experience Modification Factor (EMF) decrement and an EMF interest decrement for specific electricity service. A decrement of 0.0069 ¢ / kWh and an interest decrement of 0.0010 ¢ / kWh are effective for service starting July 1, 2006, and are scheduled to remain in effect until June 30, 2007.
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...
AI summary The text defines the applicability of a fuel cost adjustment within the Utility's South Carolina retail electric rate schedules. It specifies that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one ten-thousandth of a cent using a specific formula (F=E/S + G/S1), provided the Commission deems the costs reasonable and proper.
Minus - (D) The cost of fuel and applicable S02emission allowances recovered through intersystem sales including the fuel costs and applicable S02 emission allowances related to economy energy sales and other energy sold on an economic dis...
AI summary The text outlines the methodology for calculating fuel costs (F) and associated SO2 emission allowances for intersystem energy sales. It specifies that fuel costs are recovered for economy energy and other energy sold on an economic dispatch basis, while excluding non-billing transactions like diversity energy or storage energy payback. The calculation incorporates projected system kilowatt-hour sales, cumulative differences between jurisdictional fuel revenues and expenses, and the appropriate revenue-related tax factor.
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...
AI summary The text outlines the applicability of a fuel cost adjustment formula to the Utility's South Carolina retail electric rate schedules. It specifies that the Public Service Commission will include fuel costs in base rates, rounded to the nearest one ten-thousandth of a cent, based on a formula that calculates fuel costs as the sum of energy and generation costs divided by system capacity (F = E/S + G/S).
Where: F = Fuel cost per kilowatt-hour included in base rate, rounded to the nearest one ten-thousandth of a cent. E = Total Projected system Fuel costs: (A) Fuel consumed in the Utility's own plants and the Utility's share of fuel consume...
AI summary The text defines the methodology for calculating the fuel cost (F) per kilowatt-hour included in the base rate. It specifies the components of total projected system fuel costs (E), including fuel from own and jointly owned plants, purchased power (unit, limited term, and firm generation capacity), and economy purchases. It also outlines deductions for fuel costs recovered through intersystem sales, the treatment of SO2 emission allowances, and the exclusion of non-monetary energy receipts. It concludes with specific fuel cost and tax rider values for the period of October 2005 through September 2006.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB)
34 passages
IV. Transformation Discounts: When Customer owns the step-down transformation and all other facilities beyond the transformation which Company would normally own, except Company's metering equipment, the charge per kW of on-peak Billing De...
AI summary The document outlines 'Transformation Discounts' applied to customers who own their own step-down transformation and subsequent facilities. These discounts reduce the charge per kW of on-peak Billing Demand and per kWh for both transmission and distribution services. Specific ownership requirements and voltage thresholds (e.g., 69 kV, 115 kV, or 230 kV for transmission; 12.47 kV or higher for distribution) must be met to qualify. It also specifies conditions regarding metering, additional facilities, and the potential for discount reclassification due to system changes.
1. DURJNG A LEVEL 2 CAPACITY CURTAILMENT PERJOD For the maximum Curtailable Demand registered or computed by or from Company's metering facilities, during a Level 2 Capacity Curtailment Period, Customer's monthly bill will be increased sub...
AI summary The text outlines the billing structure for customers who have contracted to curtail demand during a Level 2 Capacity Curtailment Period. It specifies a tiered pricing model where the discount per kW increases by 10% for the second use and 20% for subsequent uses within a billing month. The calculation also accounts for the duration of the contract and the history of the customer's Curtailable Demand over the preceding 11 months, including provisions for credits and exclusions for Level 1 curtailment periods.
IV. Transformation Discounts: When Customer owns the step-down transfonnation and all other facilities beyond the transformation which Company would normally own, except Company's metering equipment, the charge per kW of on-peak Billing De...
AI summary The text outlines the criteria and specific discount rates for customers who own their own step-down transformation facilities and associated infrastructure. It defines 'Transmission Service Transformation Discounts' and 'Distribution Service Transformation Discounts' based on the voltage of the service line (e.g., 69 kV to 230 kV for transmission; 12.47 kV or higher for distribution). It specifies eligibility requirements, such as the exclusion of customer-specific substations, and notes that the Company retains metering options and the right to adjust discounts if system conditions change.
FUEL ADTIJSTMENT Fuel costs of $.02500 per kWh are included in the kWh charges and are subject to adjustment by order of the Public Service Commission of South Carolina.
AI summary The document specifies that fuel costs of $0.02500 per kWh are incorporated into the kilowatt-hour (kWh) charges. These charges are subject to periodic adjustments as ordered by the Public Service Commission of South Carolina.
A. During a Level 2 Capacity Curtailment Period For the maximum Curtailable Demand registered or computed by or from Company's metering facilities, during a Level 2 Capacity Curtailment Period, Customer's monthly bill will be increased sub...
AI summary The text outlines the billing mechanics for customers who contract to curtail demand during a Level 2 Capacity Curtailment Period under Rider-58E. It specifies a tiered pricing structure where the 'discount per kW' increases by 10% for the second instance of use in a billing month and by 20% for subsequent uses. The rider also defines specific rules for calculating payments and credits based on the elapsed months of the contract period and the historical peak of Curtailable Demand.
Replacement Energy: Adjusted Index Price multiplied by Replacement Energy. Submitted Under Advice Letter No. 06-06 ISSUED: August 14, 2006 EFFECTIVE: September 15, 2006 P.S.C.U. No. 47 • • • Original Sheet No. 9A.l
AI summary The text describes a calculation method for 'Replacement Energy' within a regulatory proceeding. It specifies that the value is determined by multiplying the Adjusted Index Price by the Replacement Energy amount. The document references a specific submission made under Advice Letter No. 06-06 and identifies the filing as P.S.C.U. No. 47, with an issuance date of August 14, 2006, and an effective date of September 15, 2006.
Demand Side Management (DSM) Cost Adjustment PURPOSE: The DSM Cost Adjustment is designed to recover the costs incurred by the Company, since August 1, 2001, associated with Commission-approved demand side management expenditures. APPLICAT...
AI summary The document outlines the purpose and application of the Demand Side Management (DSM) Cost Adjustment. It is designed to recover costs incurred by the Company since August 1, 2001, for Commission-approved demand side management expenditures. The adjustment applies to all customers under the company's electric service schedules and was scheduled to remain in effect from April 1, 2004, until March 31, 2014, unless extended by a Commission order.
SCHEDULE 98 ADJUSTMENT ASSOCIATED WITH THE PACIFIC NORTHWEST ELECTRIC POWER PLANNING AND CONSERVATION ACT All bills to qualifying customers shall have deducted an amount equal to the product of all qualifying kilowatt-hours of use multipli...
AI summary The text specifies a credit or deduction for qualifying customers under Schedule 98, which is associated with the Pacific Northwest Electric Power Planning and Conservation Act. The deduction is calculated by multiplying the total qualifying kilowatt-hours of use by a rate of 0.884¢ per kWh.
PURPOSE: The System Benefits Charge is designed to recover costs incurred by the Company associated with providing demand side management services and programs to customers. \frac{\text{APPLICABLE}}{\text{All}}: \\ \frac{\text{bills}}{\tex...
AI summary The text outlines the purpose and application of the System Benefits Charge. This charge is intended to recover costs associated with the Company's demand side management (DSM) services and programs provided to customers. It applies to all bills calculated under the presently effective Tariff WN. No. U-74, specifically as a product of total kilowatt-hours of use multiplied by a designated cent-per-kilowatt-hour rate.
Applicable All retail tariff rate schedules shall be subject to two normally scheduled rate elements, a Base Net Power Costs (NPC) charge and Deferred NPC Adjustment that together recover total net power costs including fuel, purchased pow...
AI summary The document specifies that all retail tariff rate schedules are subject to two primary rate elements: the Base Net Power Costs (NPC) charge and the Deferred NPC Adjustment. Together, these elements are designed to recover total net power costs, which encompass fuel, purchased power (including financial hedges), wheeling, and sales for resale for both natural gas and electricity. It explicitly excludes other NPC costs that are not specifically modeled in the Company's production cost model.
Definitions and Basic Concepts: NPC Rate Effective Period shall be the 12 month period beginning April 1, 2007 and extending through March 31, 2008 in the first PCAM application filed on or before February 1, 2007. In each succeeding PCAM...
AI summary This document section defines the temporal and structural parameters for the Net Power Costs (NPC) Price Comparison and Amortization Mechanism (PCAM). It establishes the 'NPC Rate Effective Period' as a 12-month window and the 'NPC Comparison Period' as the preceding 12-month historic period. Additionally, it defines the 'Base NPC' as the sum of monthly total Company NPC approved by the Commission, noting that it must reflect an Embedded Cost Differential (ECD) adjustment and be recovered through unbundled rate elements.
Definitions and Basic Concepts (continued): Adjusted Actual NPC: Adjusted Actual NPC is the annual sum of the monthly total Company amounts properly recorded in FERC Account Numbers: 501 (Steam Power Generation - Fuel), 503 (Steam Power Ge...
AI summary The text defines key components of the Price Comparison and Amortization Mechanism (PCAM), specifically the Adjusted Actual Net Power Costs (NPC) and the Deferred NPC Adjustment. Adjusted Actual NPC includes costs for coal, steam, natural gas, purchased power, and wheeling, excluding unpredictable events like hydro normalization or forced outages. The Deferred NPC Adjustment is a retail tariff charge calculated based on monthly differences between Adjusted Actual NPC and Base NPC, incorporating factors such as the Dead Band, Sharing Proportions, and Symmetrical Interest.
TABLE 1 Adjusted Actual Total NPC Layer Customer Proportion Company Proportion Over $200 million above Base Company recovers 90% from Customers Company absorbs 10% Over $100 million and up to $200 million above Base Company recovers 85% fr...
AI summary The document presents a table outlining the distribution of Net Power Costs (NPC) between the utility company and its customers based on the magnitude of costs exceeding the base level. It establishes a tiered recovery structure where the company's share of cost absorption increases as the excess NPC decreases, culminating in a 'Dead Band' where the company absorbs 100% of costs exceeding $40 million above the Base.
Definitions and Basic Concepts (continued): $40 million below Base (Dead Band) Company returns 0% to Company retains 1 00% Over $40 million and up to $100 Customers Company returns 70% to Company retains 30% million below Base Over $100 mi...
AI summary The text defines the 'Dead Band' and the specific revenue sharing mechanisms associated with it. The Dead Band is established as a symmetrical annual range of plus and minus $40 million from the NPC Base. Within this range, the Company retains 100% of the returns. Outside this range, the Company returns a sliding percentage of returns to customers based on the magnitude of the deviation (ranging from 30% to 90% depending on the amount). Furthermore, no interest deferral or accrual applies to costs falling within the Dead Band.
Sharing Proportion is also illustrated in Table 1 above and is the symmetrical proportion of Deferred NPC Adjustment eligible for recovery from, or repayment to customers. The Sharing Proportion shall be layered to reflect a Customer Propo...
AI summary The text outlines the mechanics for the Deferred NPC Adjustment, specifically defining the 'Sharing Proportion' which divides adjustments between customers and the company. It specifies that no interest is deferred for the company's portion. Additionally, it describes the Revenue Variation Adjustment based on actual versus forecast kilowatt-hours sold in Wyoming and establishes a 'Symmetrical Interest' rule where interest is paid to the company on under-collections and to customers on over-collections of the deferred balance.
Timing (continued) to defer recovery of a NPC under collection at its discretion and the Company may elect to defer refund of a NPC over recovery if the balance in the deferred account is less than $1 million on a Wyoming Jurisdiction allo...
AI summary The text specifies a provision regarding the deferral of Net Power Costs (NPC) recovery. The Company maintains the discretion to defer NPC recovery at its own choice. However, it also notes a limitation: the Company may elect to defer a refund of an NPC over recovery only if the balance remaining in the deferred account is less than $1 million, calculated on a Wyoming Jurisdiction allocated basis.
Deferred NPC Adjustment: Deferred NPC for the Comparison Period shall be calculated monthly and recorded on the Company's books, based on the following formula: Deferred NPC adjustment= ((((Adjusted Actual NPC- (Base NPC x Revenue Variatio...
AI summary The text outlines the calculation methodology for the Deferred Net Power Costs (NPC) Adjustment. It provides a specific formula involving Adjusted Actual NPC, Base NPC, Revenue Variation adjustments, and Dead bands, weighted by Sharing Proportions and Wyoming Allocated Shares, plus Symmetrical Interest. It also details the inclusion of an Embedded Cost Differential (ECD) Adjustment. Furthermore, it establishes the initial annual Base NPC at $660 million, with specific conditions and revisions for the 2006 comparison period based on the filing of a general rate case.
.... e •snzt'¥tM e'ffl& Deferred NPC Adjustment: (continued) schedules and, where applicable, to the demand and energy rate components within each schedule based on the applicable allocation factors and cost of service study relationships...
AI summary The text describes the methodology for allocating and calculating the Deferred NPC (Net Power Costs) Adjustment. The Company proposes to distribute allocated and classified costs across demand and energy rate components based on allocation factors and cost of service study relationships established in the previous General Rate Case (GRC). These costs are then divided by billing determinants to determine specific rates, ensuring the Deferred NPC adjustment is spread across customer classes and rate elements in the same proportion as the Base NPC.
Schedule Delivery Voltage Billing Units Base NPC Deferred NPC Adj. 2 \ \ Demand per kWh Energy per kWh 0.148¢ 1.180¢ 0.000¢ 0.000¢ 15 \ \ Demand per kWh Energy per kWh 0.017¢ 1.186¢ 0.000¢ 0.000¢ 25 Secondary Demand in excess of 15 kW per...
AI summary The document provides a technical table detailing the Net Power Costs (NPC) for various delivery schedules (Schedules 2, 15, 25, and 33). It specifies delivery voltages, billing units (Demand and Energy per kWh), and distinguishes between Base NPC and Deferred NPC Adjustments. The data includes specific pricing for primary and secondary voltages and identifies demand thresholds for specific schedules.
NPC PCAM Tariff Schedule 94 Monthly Billing (continued) Schedule Delivery Voltage Billing Units Base NPC Deferred NPC Adj. 33 Transmission Supp. Demand per kW Energy per kWh $0.77 1.135¢ $.000 0.000¢ 40 \ \ Demand per kW Energy per kWh $0....
AI summary The document presents a portion of Schedule 94 of the NPC PCAM Tariff, specifically detailing monthly billing rates for various delivery voltages and schedules. It lists base Net Power Costs (NPC) and Deferred NPC Adjustments for transmission, secondary, and primary delivery systems, categorized by billing units such as demand per kW and energy per kWh.
NPC PCAM Tariff Schedule 94 Monthly Billing (continued) Schedule Delivery Voltage Billing Units Base NPC Deferred NPC Adj. 207 \ \ Demand per kWh Energy per kWh 0.013¢ 1.186¢ 0.000¢ 0.000¢ 210 \ \ Demand per kW Energy per kWh $0.73 1.209¢...
AI summary The document presents a table detailing the NPC PCAM Tariff under Schedule 94. It specifies various delivery schedules (207, 210, 211, 212-1, 212-2, and 212-3) across different delivery voltages. Each schedule lists billing units (Demand per kWh or kW and Energy per kWh), corresponding Base NPC rates, and Deferred NPC Adjustments. The rates are applicable across all delivery voltage levels.
STORM DAMAGE COMPONENT The energy charges above include a storm damage component of $.00008 per Kwhr. for accumulation of a storm damage reserve.
AI summary The text specifies a storm damage component included in the energy charges, set at a rate of $0.00008 per Kwhr. This component is designated for the accumulation of a storm damage reserve.
APPLICABILITY This adjustment is applicable to and is part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of a...
AI summary The text specifies the applicability of a fuel cost adjustment for the Utility's South Carolina retail electric rate schedules. It states that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one-thousandth of a cent using a specific formula (F = E_S + G_S1), provided the Commission deems the costs reasonable and proper.
PLUS (B) Fuel costs related to purchased power and applicable S02 emission allowances such as those incurred in unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated with...
AI summary The text defines the scope of 'PLUS' costs, specifically focusing on fuel costs associated with purchased power and SO2 emission allowances. It specifies that these costs must be identifiable in billing statements for unit and limited-term power purchases. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, explicitly excluding certain reservation and option charges.
MINUS (D) The cost of fossil fuel and applicable S02 emission allowances recovered through intersystem sales including the fuel costs and applicable S02 emission allowances related to economy energy sales and other energy sold on an econom...
AI summary The text defines the 'MINUS' component of a fuel cost calculation for Southwestern Electric Power Company. It specifies that the cost of fossil fuels and SO2 emission allowances associated with intersystem sales, economy energy sales, and other energy sold on an economic dispatch basis are excluded from certain calculations. It clarifies that energy deliveries without billing transactions, such as diversity energy and storage energy payback, are not considered sales. The calculation also incorporates a revenue-related tax factor and notes that S.C. Code Ann. Sec. 58-27-865 takes precedence in case of conflict.
Adjustments: Fuel Adjustment: In addition to all other charges, the amount of the Customer's bill will be adjusted by an amount per kilowatthour calculated according to the formula in the Energy Cost Recovery Rider - Arkansas. Tax Adjustme...
AI summary The document outlines two specific billing adjustments for customers. The Fuel Adjustment modifies the bill per kilowatt-hour based on the formula established in the Energy Cost Recovery Rider - Arkansas. Additionally, the Tax Adjustment increases the bill by the proportionate part of any new or increased tax rates as dictated by the Tax Adjustment Rider - Arkansas.
The Demand Credit used to calculate the Monthly Curtailable Power Credit will be: VOLTAGE LEVEL DEMAND CREDIT Secondary Service $3.19/kW Primary Service $3.06/kW Transmission Service $2.91/kW NON-COMPLIANCE PROVISIONS
AI summary The text specifies the Demand Credit rates used to calculate the Monthly Curtailable Power Credit across three different voltage levels. The credits are set at $3.19/kW for Secondary Service, $3.06/kW for Primary Service, and $2.91/kW for Transmission Service. The document also indicates that non-compliance provisions apply to these credits.
LIMITATIONS ON CURTAILMENTS Curtailments under this Rider are limited as follows: Daily Limit: No longer than 12 hours in any day, measured from midnight to midnight, except during system emergencies as described below. Annual Limit: No mo...
AI summary The document outlines the limitations and measurement rules for the Experimental Curtailable Service Rider for Southwestern Electric Power Company. It establishes a daily curtailment limit of 12 hours and an annual limit of 400 hours, excluding interruptions caused by equipment failures. During system emergencies involving public pleas for energy conservation, these daily limits are suspended, though these events still count toward the annual limit. It also specifies that any curtailment under 15 minutes is counted as a full 15-minute period.
BASERATEREVENUEPERCENTAGE Year Applicable Merger Savings Credit% Year 1 .6954% Year 2\ 1.0700% Year 3\ ].2831% Year 4\ 1.4496% Year 5\ 1.5643% Year 6\ and thereafter 2.0323% For each twelve month period, the Net Merger Savings Credit Perce...
AI summary The text specifies the annual Merger Savings Credit percentages to be applied to all retail customer rate classes over a multi-year period, beginning at 0.6954% in Year 1 and increasing to 2.0323% from Year 6 onwards. These credits are based on the 1998 Regulatory Plan Stipulation and Agreement (Docket No. 98-339-U). It also notes that if other jurisdictions receive additional net benefits, equivalent benefits and a revised Net Merger Savings Rider, including interest based on SWEPCO's rate of return, must be provided to Arkansas ratepayers.
En e cf IVe: J my I 2006 th roug1 hJ nne 2007 revenue mon th Descri12tion Rate Code Year Six Over/Under Adjusted Year 7 Factor %for year 6 Net Merger Savine:s Credit Residential Basic 015,038 2.0323% -0.4288% 1.6035% Residential Heating 02...
AI summary The document provides a detailed breakdown of rate adjustments and merger savings credits for various customer classes for the 2006 through 2007 revenue months. It lists specific rate codes, Year Six factors, over/under percentages, and adjusted Year 7 figures. Key categories include residential heating, general services, lighting and power (primary and secondary), municipal services, and industrial applications like pulp and paper mills. It also specifies that Net Merger Savings Credits are excluded for certain standby and emergency power services.
APPLICATION This Transition Cost Rider ("Rider TC") is a surcharge applicable to all electric service billed under Southwestern Electric Power Company ("SWEPCO") rate schedules specified below, whether metered or unmetered. Rider TC is to...
AI summary Southwestern Electric Power Company (SWEPCO) is applying for a Transition Cost Rider (Rider TC) surcharge to be applied to all electric service billed under specific rate schedules. The purpose of this rider is to recover costs associated with implementing retail open access, as well as costs mandated by statute or regulation that are not otherwise recoverable. The rider is proposed to be effective upon approval by the Arkansas Public Service Commission and is scheduled to terminate by February 21, 2006.
The Net Monthly Rates set forth in SWEPCO's Rate Schedules identified below will be increased by the following Rate Adjustment amounts. Rate Class Rate Adjustment Residential $0.0002480 per kWh Commercial/Small Industrial $0.0001949 per kW...
AI summary The document outlines specific Rate Adjustment increases for various customer classes under SWEPCO's Rate Schedules. The adjustments are provided as fixed amounts per kilowatt-hour (kWh) for five distinct categories: Residential, Commercial/Small Industrial, Large Industrial, Municipal, and Lighting.
TERMS AND CONDITIONS SWEPCO shall monitor the amounts collected from ratepayers by application of Rider TC. The total sum of transition costs collected from ratepayers and retained by SWEPCO shall not exceed the total sum of actual approve...
AI summary The document outlines the terms and conditions for SWEPCO's recovery of transition costs via Rider TC. It specifies a maximum cap of $1,294,363 for total transition costs and stipulates that collections for specific Rate Classes must cease once the approved amount is recovered before the February 21, 2006 deadline. It also establishes procedures for addressing over/under collections, requiring refunds via Rider ECR if necessary, and mandates the filing of reports on actual collections during the first year and at the end of the recovery period.
2006 Fuel Adjustment Factors- Arkansas Transmission - Transmission - Primary Billing Month 138kV 69kV Substation Primary Secondary January $0.032698 $0.033016 $0.033179 $0.033464 $0.034406 February $0.032698 $0.033016 $0.033179 $0.033464 $...
AI summary The document provides a detailed schedule of 2006 fuel adjustment factors for Arkansas. It specifies monthly rates for various transmission levels, including 138kV and 69kV lines, as well as Primary and Secondary Substation rates. The data shows consistent monthly values for each category throughout the calendar year, reflecting the cost adjustments applied to electricity billing for that period.
N-40RIRs Attachment SEB-NSPI - 2h
26 passages
With Non-Firm Capacity Interruptible Credit (eft. 1211182) 50.000 Load Factor 90% Monthly kWh 32,850,000 MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 Monthly kW Total ECR Factors for 2006:
AI summary The document provides technical load data associated with a 'With Non-Firm Capacity Interruptible Credit' (eft. 1211182). It specifies a monthly load of 50,000 kW with a 90% load factor, resulting in a monthly consumption of 32,850,000 kWh. The text also serves as a transition point to presenting ECR (Electricity Cost Recovery) factors for the year 2006.
Jan Apr Jul Oct Average Max Int. I Min Firm Description Customer Charge $2,000.00 $2,000 2 Demand Charge: $10.00 50,000 500,000 3 Energy Charge: $0.008595 32,850,000 282,346 4 ECR (Avg of Jan,Apr,Jui,Oct '06) $0.022255 32,850,000 731,077 5...
AI summary The document presents a detailed table of electricity rate components for a specific period, including Customer Charges, Demand Charges, and Energy Charges. It calculates the Electricity Cost Recovery (ECR) based on a four-month average. The table also details various rate riders, interruptible credits, and a multi-tiered state tax calculation totaling a final cost of $1,405,302 at 42.78 mills per kWh.
Rate: LPS-TOD (eff. 10/2/06) Pursuant to Interim Order WIGHTHY KVV U j Load Factor 0% Monthly kWh 0 Total A CONTRACTOR AND AND AND AND AND AND AND AND AND AND Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 50 MV √ Firm n Line Des...
AI summary The document presents a rate structure for LPS-TOD, effective October 2, 2006, pursuant to an interim order. It details a specific billing schedule for a customer with a monthly load of 50,000 kW and 32,850,000 kWh. The rate components include a fixed customer charge, demand charges, off-peak excess demand charges, energy charges, a fuel factor, and a customer-owned meter credit, culminating in a total monthly cost of $1,163,498 and a mill rate of 35.42.
Metering Loss Adjustment Reduces units by 3% 200 50 MW F irm Line Description Rates Units Cost (1) (2) (3) Facilities Charge: 1 First 500 kW (per bill) $678.40 1 $678 2 Add'l kW (per kW) $1.06 48,000 50,880 Demand Charge: 2 Summer (June -...
AI summary The document presents a detailed breakdown of the 200 MW Firm power supply costs for Avista Corporation. It outlines the specific rate components including Facilities Charges (based on kW), Demand Charges (split by summer and winter peak usage), and Energy Charges (split by peak and off-peak periods for both summer and winter). The total cost is calculated at $1,138,340, resulting in a rate of approximately 34.05 mills per kWh.
Voltage: Transmission Power Factor: 90% Assumes Substation Ownership ASSUMF PTIONS Firm Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible Monthly kW 0 Load Factor 0% Monthly kWh 0 Total Monthly kW 50,000 Load Factor 90...
AI summary The document provides a detailed cost calculation for a firm 50 MW load with a 90% load factor under Rate Schedule 25 - Extra Large General Service. It breaks down the monthly costs into demand charges (based on kVA) and energy charges (based on kWh), including a primary voltage discount. It also accounts for specific adjustments such as the Temporary Power Cost Adjustment and the Energy Efficiency Rider Adjustment, resulting in a total monthly cost of $1,291,703.
Rate OPT Effective: October 1, 2006 Rate IS Effective: April 28, 2006 Voltage: Transmission Power Factor: 90% Assumes Substation Ownership ASSUMPTIONS Firm MonthlykW 0 Load Factor 100%' MonthiykWh 0 llnterruQtible MonthiykW 50,000 Load Fac...
AI summary This document outlines the cost components and rate structures for two types of transmission power service: Optional Power Service (Rate OPT) and Interruptible Power Service (Rate IS). It provides a detailed breakdown of facilities charges, demand charges (tiered by season and capacity), and energy charges (tiered by peak/off-peak usage) for a 50,000 kW load. The data includes specific cost calculations for both firm and interruptible service types, including a fuel adjustment for Rate OPT.
Adjustment for fuel in rates Fuel in Rates ¢/kWh Jan 2006 1.4070 Apr2006 1.4070 Jul 2006 1.4070 Oct 2006 1.776o I Average 1.4993 Difference (0.2768) $/kWh (0.002768) EL PASO ELECTRIC COMPANY· TEXAS ASSUMPTIONS Rate 29, Transmission Voltage...
AI summary The document provides a detailed breakdown of fuel cost adjustments and rate structures for El Paso Electric Company in Texas. It presents comparative fuel rates for 2006, showing a variance between different quarters. Specifically, it outlines the cost components for 'Transmission Voltage Service' (Firm and Interruptible), including demand charges, energy charges, and fixed fuel factors based on specific load factors, monthly kilowatts, and kilowatt-hours.
Max Int. / Min Firm Line Description Rates Units Cost 1 Customer Charge - Firm $170.00 1 $ 170 2 Customer Charge - Interr $28.40 1 28 Demand Charge: 3 Summer (JJAS) $11.45 16,667 190,833 4 Winter 7.70 33,333 256,667 5 Total 50,000 $447,500...
AI summary The document provides a detailed cost breakdown for a 'Max Int. / Min Firm' rate structure. It outlines specific charges including Customer Charges for Firm and Interruptible services, Demand Charges for Summer and Winter periods (including Interruptible Credits), and Energy Charges based on hourly usage. The calculation concludes with a total cost of $1,730,815, incorporating an Electricity Cost Recovery (ECR) mechanism and reflecting a final rate of 52.69 mills per kWh.
Rider M1 reduces units by 2% ASSUMPTIONS Firm Rider M1 Reduc Monthly kW 0 0 Load Factor 100% 100% Monthly kWh 0 0 Interruptible Monthly kW 50,000 49,000 Load Factor 90% 90% Monthly kWh 32,850,000 32,193,000 Total MonthlykW 50,000 49,000 Lo...
AI summary The document provides a detailed cost calculation for a customer under Rider M1, which includes a 2% unit reduction. It breaks down various charges and credits, including Firm Customer Charges, Interruptible Customer Charges, and seasonal On Peak and Excess kW charges for both Summer and Winter periods. The calculation accounts for specific M1 Credits, Demand Credits from a settlement agreement, and various riders such as the M27 Fuel Adjustment, M33 Grand Gulf, and M47 Transition Cost Rider, resulting in a total cost of $1,155,855 at 35.19 mills per kWh.
www.southerncompany.com/gapower/pricing/gpc rates .asp?mnuOpco+gpc&mnuType+com&mnultem-ps Voltage: Transmission ASSUMPTIONS Power Factor: 90% Assumes Substation Ownership Firm Monthly kW 0 Load Factor 100% Monthly kWh 0 Interruptible Month...
AI summary The document provides a detailed breakdown of the GPC rates for transmission-level voltage service, specifically for a firm substation ownership scenario with a 50,000 kW capacity and 90% load factor. It outlines a complex tariff structure including base charges, demand charges, and tiered energy charges. Notably, it incorporates the DPEC-1 (Demand Plus Energy Credit) rider, which applies seasonal demand and energy credits, and includes a fuel cost recovery mechanism and state sales tax.
INDIANA MICHIGAN POWER· IN www.aep.com Voltage; Transmission Power Factor. 90% Assumes Substation Ownership ASSUMPTIONS !Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 lnterru[ltible Monthly kW 50.000 1 Load Factor 90% Monthly kWh 32,850,...
AI summary The document provides a detailed rate schedule for Indiana Michigan Power (AEP) regarding Industrial Power (I.P.) and Interruptible Power (I.R.P.) services effective July 30, 2001. It outlines specific assumptions for firm and interruptible loads, including monthly kW, load factors, and kWh. The tables detail service charges, demand charges per kVA, energy charges per kWh, savings credits, and fuel adjustments, providing a cost breakdown for both firm and interruptible service types.
Note: Fuel Adj. Is combination of Fuel Adj. AND Systems Sales Factor 50 MW Firm Line Description Rates Units Cost Line Description (1) (2) (3) (., 1 —7 Firm Rate: CIP-TOD 1 Service Charge $1,353 1 $1,353 Demand Charge 2 On Peak kW $9.35 50...
AI summary The document provides a detailed rate calculation for the Kentucky Power Company, specifically for the CIP-TOD Firm Rate and the CC IDD Contract Service Interruptible Power (C3-IKF). The breakdown includes service charges, demand charges (on-peak and off-peak kW), energy charges, fuel adjustments, and capacity charges. It also accounts for an environmental surcharge, a Net Merger Savings Rider, and a 6.00% state tax, resulting in a total cost of $1,234,164 and a rate of 37.57 mills per kWh.
Transmission Level ASSUMPTIONS Firm MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible MonthlykW 0 Load Factor 0% Monthly kWh 0 Total MonthlykW 50,000 Load Factor 90% Month! kWh 32,850,000 Max Int. I Min Firm Line Descri...
AI summary The document outlines the cost structure for Transmission Level service, based on specific load assumptions including a monthly demand of 50,000 kW and a 90% load factor. It details various charges including customer, demand, and energy charges, alongside fuel adjustments, environmental surcharges, and surcredits (Merger and Value Delivery). It also specifies different curtailable demand credit options based on annual curtailment hour limits.
Adjustment for Fuel and Fuel included in Rates Fuel Fuel in Total Cost Adjustment Rates of Fuel $/kWh ~/kWh ~/kWh Jan 2006 0.0023100 0.01810 0.0204100 Feb 0.0026300 0.01810 0.0207300 Mar 0.0020300 0.01810 0.0201300 Apr 0.0044000 0.01810 0....
AI summary The document provides a monthly breakdown of fuel costs for the year 2006, specifically distinguishing between the Fuel Adjustment and the portion of fuel costs already included in rates. It calculates the total cost of fuel per kWh, determines the average monthly cost, and subtracts the current fuel included in rates to arrive at a net Fuel Adjustment of $0.0062933/kWh. The data pertains to Kingsport Power Company (AEP).
Rate: I.P. - Transmission Level (eft 12/22/97) ASSUMPTIONS Firm Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible Monthly kW 0 Load Factor 0% Monthly kWh 0 Total Monthly kW 50,000 Load Factor 90% Mont hi kWh 32,850,000...
AI summary The document outlines the rate structure for Industrial Power (I.P.) at the Transmission Level, effective December 22, 1997. It provides a detailed cost breakdown for a 50 MW firm load with a 90% load factor. The rates include a fixed service charge, demand charges based on kW, and energy charges based on kWh. It also accounts for fuel adjustments, a Purchased Power Adjustment Rider, and a prompt payment discount, resulting in a final calculated cost of $1,114,408 with a mill rate of 33.92 mills per kWh.
Assumes Substation Ownership ASSUMPTIONS Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 Interruptible MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor 90% Month! kWh 32,850,000 Max Int. I Min Finn...
AI summary The document provides a detailed cost calculation for a customer assuming substation ownership under the Firm Rate· LP-TOD tariff. It outlines various charges including customer charges, demand charges (Basic, Summer Peak, and Winter Peak), and interruptible credits. The calculation also incorporates energy charges, fuel adjustments, environmental cost recoveries, and various surcredits such as the Merger Surcredit and Value Delivery Surcredit. The final total cost is calculated at $1,068,607, resulting in a rate of 32.53 mills per kWh.
Adjustment for Fuel and Fuel included in Rates Fuel Fuel in Total Cost Adjustment Rates of Fuel $/kWh $/kWh $/kWh Jan 2006 0.0008800 0.01349 0.0143700 Apr2006 0.0026800 0.01349 0.0161700 Jul2006 0.0021900 0.01349 0.0156800 Oct 2006 0.00520...
AI summary The document presents a data table detailing the 'Adjustment for Fuel and Fuel included in Rates' for the year 2006. It breaks down costs into fuel adjustment components and fuel already included in rates on a quarterly basis (January, April, July, and October). The final calculation provides an annual fuel adjustment figure of $0.0027375/kWh after subtracting the current fuel included in rates from the total fuel cost.
Voltage: Transmission Power Factor: 90% ASSUME TIONS Firm Monthly kW 0 Load Factor 100% Monthly kWh 0 Interruptible Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Max...
AI summary The document presents a detailed cost calculation for a Large Industrial Firm Rate based on a transmission power factor of 90%. It outlines specific demand charges for summer and winter periods, energy charges for peak and off-peak usage, and includes cost recovery mechanisms for AEP (Appalachian Power) and Energy Efficiency. The total firm cost is calculated at $1,301,468, which is subsequently reduced by a Rider No. 4 Interruptible Power credit to a total cost of $1,141,468, resulting in a final rate of 34.75 mills per kWh.
North System ASSUMPTIONS MonthlykW 0 Load Factor 100% Monthly kWh 0 MonthlykW 50,000 90% Monthly kWh 32,850,000 Total 50,000 Load Factor 90% Monthly kWh 32,850,000 I Firm lnterrul:!tlble Load Factor MonthlykW Max Int. I Min Firm Line Descr...
AI summary The document presents a detailed cost calculation for the 'North System' under the Large General Service firm rate. It outlines assumptions for a 50,000 kW load with a 90% load factor, totaling 32,850,000 monthly kWh. The calculation breaks down monthly service charges, demand charges for summer and winter peaks, and off-peak demand charges. It also includes energy charges for on-peak and off-peak periods, along with specific cost recoveries for AEP and Energy Efficiency, resulting in a total firm cost of $975,291.
South System Rate LXPILXO LGS-TOU Transmission (eft 3/1/99) ASSUMPTIONS Rider No. 57 Curtailment SeNice (eft 1/9/03) Firm I MonthlykW 0 Voltage: Transmission . Load Factor 100% Power Factor. 90% Monthly kWh 0 lnterru!Jtible MonthlykW 50,00...
AI summary The document outlines the rate structure and cost calculations for the South System, specifically focusing on the LGS-TOU Transmission rate and Rider No. 57 Curtailment Service. It provides a detailed breakdown of demand charges for summer and winter periods, energy charges for on-peak and off-peak usage, and specific cost recoveries for AEP and energy efficiency. The calculations are based on a firm monthly load of 50,000 kW and a total of 32,850,000 kWh.
Rider No. 58 E - Curtailable Load eff. 711/05 ASSUMPTIONS Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 Interruptible MonthlykW 50.000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor 90% Monthl kWh 32.850,000 Ma...
AI summary The document outlines the rate structure for Rider No. 58 E - Curtailable Load, effective July 1, 2005, for Progress Energy Carolinas, Inc. in South Carolina. It provides a detailed breakdown of monthly costs for firm and interruptible services, including basic customer charges, tiered demand charges for summer and winter periods, energy charges for on-peak and off-peak usage, fuel adjustments, and voltage discounts. The calculation concludes with a total monthly cost of $1,551,566 based on a 50,000 kW load.
Rate 23, Industrial Power Service eff. 5/1/06 Interruptible Rider- 1/2005 ASSUMPTIONS Firm MonlhlykW 0 Load Factor 100% Monthly kWh 0 Interruptible Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor...
AI summary The document presents a rate calculation for the Industrial Power Service (Rate 23) effective May 1, 2006, specifically focusing on the Interruptible Rider. It outlines cost components for a 50,000 kW load with a 90% load factor, including demand charges, voltage discounts, energy charges, and fuel adjustments. Two interruptible credit options (Option A and Option C) are compared, showing that Option C provides a higher credit and a lower mill per kWh rate than Option A.
14 Mills per kWh ASSUMPTIONS Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 Interruptible Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor 90% Monlhl kWh 32,850,000 Max Int. I Min Firm Line Descr...
AI summary The document provides a detailed cost calculation for a specific load profile (50,000 kW at a 90% load factor) under the 'Large Light & Power' Firm Rate. It breaks down the monthly costs into demand charges for summer and winter, energy charges, and various riders including a Curtailable Service Rider, Net Merger Savings Rider, and a Fuel Adjustment. The final calculated total cost is $1,387,211, resulting in a rate of 42.23 cents per kWh.
YlVtW swepr.o com!CpslomerService Rr~tcsAndTarlf1srLeaa!TariffFllingsrrexm;Current.aspx ASSUMPTIONS Rates Effective: February 15, 1984 Firm Voltage: Transmission Monthly kW 0 Power Factor: 90% Load Factor 100% Assumes Substation Ownership...
AI summary The document provides a detailed tariff structure for firm and interruptible electricity rates, effective February 15, 1984. It outlines specific demand charges, energy charges, and various riders—including fuel adjustments, merger savings, and rate reductions—for transmission-level voltage. The data distinguishes between firm service (with 100% load factor assumptions) and interruptible service (with 90% load factor assumptions), calculating total monthly costs and mills per kWh based on specific power factors and consumption volumes.
Note: Costs exclude Fuel Cost Surcharges- the fuel cost surcharges for transmission customers are based on actual historical kWh usage recorded during period that the underrecoveriesloverrecoveries accumulated.
AI summary The text provides a technical clarification regarding the exclusion of Fuel Cost Surcharges from specific cost calculations. It specifies that for transmission customers, these surcharges are calculated based on actual historical kilowatt-hour (kWh) usage recorded during the specific period in which the relevant underrecoveries or overrecoveries were accumulated.
Transmission Service (Schedule 1823) Description Units Rates Cost Basic Charge: per kVa 55,556 4.866 270,333 Energy: per kWh 32,850,000 0.028520 936,882 Total Cost ¢/kWh (Canadian) $ 1,207,215 3.67 Hydro Quebec
AI summary The document provides a cost breakdown and rate structure for Transmission Service under Schedule 1823. It lists specific unit rates and costs for Basic Charges per kVa and Energy per kWh, calculating a total cost per kWh in Canadian dollars. The table also includes a reference to Hydro Quebec, likely as a comparative entity or a related service provider.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB)
24 passages
FIXED RATE RIDER This rider is available to existing or new customers taking service under this schedule with a minimum contractual monthly demand of at least 8,000 KW. Upon the execution of a three (3) year service contract, EPEC will gua...
AI summary The Fixed Rate Rider provides a mechanism for customers with a minimum contractual monthly demand of at least 8,000 KW to secure guaranteed fixed rates for the non-fuel (T) component of their monthly rate. This requires a three-year service contract, guaranteeing fixed rates for at least two years, with a possible extension up to three years at EPEC's discretion. The rider is ineligible for customers under the Economic Development Rate Schedule No. 33 and is generally unavailable for customers with firm demand in conjunction with interruptible power service unless expressly permitted by EPEC.
FACILITIES CHARGE In the event the Company is required to install and operate additional transmission plant, switching stations or transformation to meet the customer's requirements, a Facilities Charge shall be included under this rate. T...
AI summary The text defines the 'Facilities Charge' rate, which applies when the Company is required to install and operate additional transmission infrastructure, switching stations, or transformation facilities to meet specific customer requirements. It explicitly states that the installed costs of metering are included in the determination of this charge.
MONTHLY RATE The monthly charge for interruptible power service hereunder, excluding fuel, shall be comprised of the following rate elements: - (a) a demand charge calculated by multiplying (i) Customer's Interruptible Power Billing Demand...
AI summary The document outlines the monthly rate structure for interruptible power service, excluding fuel costs. The rate is composed of three elements: a demand charge based on Texas-jurisdictional transmission costs, an energy charge based on production and transmission-related non-fuel variable O&M expenses, and a fixed adder of $0.00325 per KWH. The calculations rely on data from the Texas Public Utility Commission's most recent general rate order for EPEC, with a provision for mutual agreement if that data is unavailable.
INTERIM ORDER DOCKET NO. 12700 Page 1 of 3 Line · Demand Charge No. Calculation Value Source 1 Total Transmission Plant $162,114,000 Page 2 of 18 Commission Jurisdictional COS Study 2 Accum. Depr. Transmission 45,125,000 Page 3 of 18 Commi...
AI summary This document presents a calculation for the annual and monthly demand charges for El Paso Electric Company's interruptible rate transmission voltage customers for the test year ending June 30, 1993. The calculation derives a total demand-related cost of $19,125,941 based on net transmission plant values, depreciation, O&M expenses, and property taxes. This total is divided by the loss-adjusted non-coincident peak demands to arrive at an annual demand charge of $18.29 per kW and a monthly charge of $1.521 per kW.
INTERIM ORDER DOCKET NO. 12700 Page 3 of 3 Line Demand Charge No. Calculation Value Source A501 Non-Reconcilable Fuel $244,000 Page 4 of 18 Commission Jurisdictional COS Study 2 A512 Maintenance of Boiler Plant 1,554,000 Page 4 of 18 Commi...
AI summary The document provides a breakdown of demand charges and variable O&M expenses for Texas Class, as detailed in the Commission Jurisdictional Cost of Service Study and EPEC Schedule 0-1.4. It specifically identifies non-reconcilable fuel costs and maintenance expenses for boiler, electric, and reactor plants. The calculation for the Energy Charge ($/kWh) is derived by dividing the sum of these non-fuel components by the total Texas Class kWh at supply, excluding interruptible kWh.
The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service: Energy Loss Factor Fixed Fuel Factor ($/KWH) A. Texas System 1.00000 0.03056 (1) B. Transmission Voltage (If customer is not specified below and...
AI summary The document outlines the Fixed Fuel Factors (FFF) for The Empire District Electric Company, specifically for Transmission Service. It details energy loss factors and corresponding fuel factors based on different voltage levels of service, including Transmission Voltage (69,000 volts and higher), Primary Voltage (2,400 to 69,000 volts), and Secondary Voltage (480 volts and below). The factors are used to adjust for energy losses across various service schedules.
Schedule GP Customer .................................... Schedule PT Customer ..... 21.5% of (CT) (CR) (CT) (CR) Credit on Demand Reduction, per kW 18.2. MONTHLY RATE: 18.3. BILLING DEMAND: The minimum monthly billing demand for all Custo...
AI summary The text outlines the rate structures and credit mechanisms for two types of customers (Schedule GP and Schedule PT) under a demand reduction rider. It specifies a minimum monthly billing demand of 1000 kW. Customers receive monthly credits based on their actual demand reduction during interruption periods, provided they meet contracted targets. Specifically, GP customers receive a credit of 33% of the Demand Charge price, while PT customers receive 21.5%. Failure to meet the contracted reduction results in the repayment of all credits issued during that contract year.
- 18.6.9. Credits shall be applied to bills the month after such credits are earned. AKKANSA 45 PUBL IC SE KVICI - 00 DIVINISSION Revis Repla heet N 34 34 Issued 4/10/95 Name of C Company: THE EN PIRE DISTRI CT ELECTRIC COMPANY Kind of Se...
AI summary The document outlines the Energy Cost Recovery Rider (ECR) for the Connecticut Electric Company. It specifies that credits are applied to customer bills the month following they are earned. The rider establishes a formula to determine the Energy Cost Factor (ECF) per kilowatt-hour, based on the Energy Cost Rate (ECR). The ECR is calculated by summing fuel expenses (FE) and purchased energy expenses (PE) for a specific period, adjusted for carrying charges and other variables.
Agers, Donna From: Kim Imhof [[email protected]] Sent: Friday, December 08, 2006 4:55 PM To: Agers, Donna Bill Eichman Cc: Subject: FW: Empire District (Arkansas) - ECR Factors Sensitivity: Confidential Donna, Below are the ECR rat...
AI summary The text is a confidential email from Kim Imhof of Empire District regarding Energy Cost Rate (ECR) factors for the period of October 2005 to March 2007. It notes that annual filings occur on April 1st and reflect fuel costs from the preceding calendar year. The sender mentions that interim filings are permissible if specific criteria are met, referencing an interim filing submitted in October 2005.
ENERGY COST RECOVERY ARKANSAS From To ECR Amount 10-1-05 3-31-06 $0.035365 4-1-06 3-31-07 $0.037657 Thanks, Kim Imhof Regulatory Analyst Empire District Electric Co 417-625-6545 Original Message From: Bill Eichman Sent: Friday, December 08...
AI summary The document contains internal correspondence and data regarding Energy Cost Rate (ECR) factors for Empire District Electric Co. in Arkansas. It specifically lists historical ECR amounts for the periods of October 2005 to March 2006 and April 2006 to March 2007. The correspondence involves communication between a regulatory analyst, a representative from ConsultBai, and Bill Eichman regarding the collection of these factors.
18.2. ADJUSTMENT TO NET MONTHLY RATE This rate shall remain in effect until modified or terminated in accordance with its terms or (AT) applicable regulations or laws. 18.2.1. Service is delivered and metered at voltages less than 13,800Y/...
AI summary This section outlines the specific rules for adjusting the net monthly rate based on the voltage levels at which service is delivered and metered. It specifies that for service delivered and metered at voltages below 13,800Y/7,960, there is no reduction in Demand or Energy. However, for service delivered at lower voltages but metered at 13,800Y/7,960 or greater (but less than 115,000 Volts), a 1% reduction in Demand and Energy is applied to account for losses.
(AT, MT) Function: Generation Transmission Distribution Customer Total Billing Item Service Reduce Demand and Energy by 1.0% for losses; and, Reduce Monthly I Demand $0.00 $0.00 $1.63 $0.00 $1.63 Charge per kW by: Reduce Daily Den nand Cha...
AI summary The document provides a breakdown of billing items related to demand reduction and energy loss reduction for different utility functions, including Generation, Transmission, Distribution, and Customer service. It specifically outlines charges per kW for reducing monthly and daily demand, highlighting a distribution-specific charge of $1.63 for monthly demand reduction and $0.0536 for daily demand reduction. It also specifies service conditions for delivery and metering at 115,000 Volts or greater.
37.2.3. Funding Method - A. EAI shall establish external trusts to accumulate the necessary funds to decommission ANO. - B. EAI shall place the maximum possible amount of its internally funded decommissioning reserve balance associated wit...
AI summary The document outlines the funding method for the decommissioning of Arkansas Nuclear One (ANO) by Entergy Arkansas, Inc. (EAI). It mandates that EAI establish external trusts to accumulate necessary funds, prioritizing tax-qualified trusts for the maximum allowable deduction. EAI is required to deposit future revenues collected under the specific Rider into these trusts, with a monthly transfer schedule based on the previous two months' billed revenue, net of uncollectible accounts.
37.2.5. Revenue Requirement and Rate Determination A. TheANO decommissioning revenue requirement for the Arkansas retail jurisdiction that is to be utilized to develop the Rate Adjustment amounts in Attachment A for each calendar year shal...
AI summary This section outlines the methodology for determining the Arkansas Nuclear One (ANO) decommissioning revenue requirement and the resulting Rate Adjustments for the Arkansas retail jurisdiction. It specifies that adjustments must be based on current estimates of various inputs, including trust management fees, income tax rates, bad debt rates, trust earnings, and decommissioning expenditures. The revenue requirement is allocated across rate classes based on the proportions established in Entergy Arkansas, Inc.'s most recent final general rate filing, and the final Rate Adjustments are calculated by dividing the class revenue requirements by projected annual billing units.
42.2. CONDITIONS In Opinion No. 234 in Docket ER82-616-000 and Docket ER82-483-000 the Federal (CT,RT) Energy Regulatory Commission ("FERC") allocated to Entergy Arkansas, Inc. ("EAI'' or "Company'') 36% of the power from the 90% share of...
AI summary The text outlines the conditions regarding power allocation from the Grand Gulf Unit 1 nuclear generating unit. The Federal Energy Regulatory Commission (FERC) allocated 36% of the 90% share owned by System Energy Resources, Inc. (SERI) to Entergy Arkansas, Inc. (EAI). Consequently, EAI became responsible for paying SERI for this power starting July 1, 1985. All associated costs incurred by EAI are to be recovered from its Arkansas retail customers as per the APSC-approved Stipulation and Settlement Agreement.
The cost of this power will be allocated in the following manner beginning January 1, 1994 and all succeeding years: Percent of SERI's Share of Grand Gulf Unit 1 Company Allocation Share of Grand Gulf Unit 1 Costs Current Recovery Share 28...
AI summary The document specifies the allocation method for the costs associated with Grand Gulf Unit 1 power starting January 1, 1994. It outlines a transition from a 'Current Recovery Share' of 28.08% to a 'Retained Share' of 7.92%, totaling a 36.00% share of SERI's portion. The corresponding company allocation shares are defined as 78.00% and 22.00% respectively, summing to 100% of the allocated costs.
The energy related portion of Grand Gulf costs associated with the Current Recovery (CT,RT) Share and the energy from the Retained Share which is sold to the Company's Arkansas retail customers pursuant to the Stipulation and Settlement Ag...
AI summary The document specifies the rate recovery mechanism for the Grand Gulf project. It clarifies that energy-related costs associated with the Current Recovery (CT,RT) Share and energy from the Retained Share sold to Arkansas retail customers will be recovered through the Energy Cost Recovery Rider (ECR) as purchased power. This provision is part of the rate schedule for Entergy Arkansas, Inc. under the Grand Gulf Rider M33.
The Net Monthly Rates for Grand Gulf demand related costs for the billing period from January 2006 through December 2006 will be as follows: (CT) Rate Class Rate Schedules Net Monthly Rate Residential Small General Service RS,RT SGS, GFS,...
AI summary The document specifies the net monthly rates for Grand Gulf demand-related costs applicable for the billing period of January 2006 through December 2006. It provides a detailed breakdown of rates for different customer classes, including Residential Small General Service and Large General Service Lighting, categorized by specific rate schedules. The text also introduces the section regarding the procedures for the recovery of these costs.
- 42.3.1. On or before November 1 of 1998 and each succeeding year thereafter, the Company will file with the APSC a revision to this Grand Gulf Rider which will reflect the demand related Grand Gulf costs which are projected to be incurre...
AI summary The text outlines the filing requirements and cost recovery mechanisms for the Grand Gulf Rider (M33) for Entergy Arkansas, Inc. The Company must submit annual revisions to the APSC by November 1st, reflecting projected demand-related costs and new Net Monthly Rates. These rates include a true-up of prior over or under-recoveries. The provision specifies the allocation of costs between Entergy Arkansas, Inc. and other entities based on the Stipulation and Settlement Agreement, while also detailing the 86.13 percent allocation factor for Arkansas retail customers.
ARKANSAS RETAIL ENERGY COST RECOVERY and FUEL & PURCHASED POWER COST FACTORS Billing Month $Per kWh 2003 Jan- Mar Apr- Dec $ 0.00892 per kWh $ 0.00896 per kWh 2004 Jan- Mar Apr- Dec $ 0.00896 per kWh $ 0.01039 per kWh 2005 Jan- Mar Apr- Se...
AI summary The document provides a historical table of retail energy cost recovery rates for Arkansas, specifically focusing on 'Power and Light Large' customers. It details the billing rates per kilowatt-hour (kWh) from January 2003 through March 2007. The data illustrates a significant upward trend in energy costs over this four-year period, with rates increasing from approximately $0.00892 per kWh in early 2003 to $0.02827 per kWh by early 2007.
Limitation of Service Service will be provided hereunder for those customers having a calculated demand of 500 kW or greater where that calculation is the greater of: (1) Applying Sixty percent (60%) to the current or previous Eleven (11)...
AI summary The text defines the specific criteria for the 'Limitation of Service' for customers with a calculated demand of 500 kW or greater. The calculation is determined by taking the greater of two values: 60% of the current or previous 11 months of winter or off-peak demands, or 95% of the current or previous 11 months of summer or on-peak demands. It also notes that customers on Off-Peak (OP) and Variable Off-Peak (VOP) riders must follow the specific percentages defined in those riders.
Construction Service Construction power shall be considered as a part of permanent service and will be provided in accordance with the Applicability section of this schedule. The Company will obtain a payment in advance for each metering p...
AI summary The document specifies that construction power is categorized as part of permanent service and must be provided according to the schedule's Applicability section. It further mandates that the Company must collect advance payment for each metering point to be served, with the payment amount based on current files held by the Georgia Public Service Commission.
FUEL COST RECOVERY SCHEDULE: "FCR-18" AUL STANDS OF STANDS OF STANDS LITEOTIVE DATE The second section of the second section of the second section of the second section of the second section of the second section section section section se...
AI summary The provided text is a heading and a table header for Schedule 'FCR-18' regarding Fuel Cost Recovery. The content appears to be corrupted or contains repetitive placeholder text ('section section section') and does not provide substantive information, arguments, or data regarding the fuel cost recovery mechanism.
APPLICABILITY: The MTC will be applied to all customers in the Georgia Power territory as it existed on June 30, 2006 and will be designed to distribute all amounts collected by the MTA to customers in the Georgia Power territory as it exi...
AI summary The text defines the applicability of the Main Terms Charge (MTC) within the Georgia Power territory as of June 30, 2006. It specifies that the MTC is designed to distribute amounts collected by the Main Terms Agreement (MTA) to customers on a per kilowatt-hour basis. However, a specific exclusion is noted: the MTC does not apply to Real-Time Pricing (RTP) customers for usage exceeding their Contract Billing Level (CBL), as these customers are not subject to the higher fuel charges the MTC is intended to compensate.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB)
36 passages
Fuel Adjustment: In addition to all other charges, the amount of the Customer's bill will be adjusted by an amount per kilowatt-hour calculated according to the formula in the Fuel Adjustment Rider-Louisiana.
AI summary The document specifies that customer bills will be subject to an additional adjustment per kilowatt-hour. This adjustment is calculated based on a specific formula defined in the Fuel Adjustment Rider-Louisiana.
Tax Adjustment: Total billing will be increased by the proportionate part of any new tax or increased rate of tax as provided in the Tax Adjustment Rider - Louisiana.
AI summary The document specifies that total billing will be adjusted to reflect the proportionate share of any new taxes or increased tax rates. This mechanism is governed by the Tax Adjustment Rider - Louisiana, ensuring that tax changes are passed through to the billing structure.
FIXED FUEL FACTOR Electric service billed under applicable rate tariffs shall be subject to this Fixed Fuel Factor in accordance with the Substantive Rules of the Public Utility Commission of Texas Section 25.237. The Fixed Fuel Factor is...
AI summary The document defines the application of the Fixed Fuel Factor to electric service billed under applicable rate tariffs. It specifies that the factor must be applied in accordance with the Substantive Rules of the Public Utility Commission of Texas Section 25.237. The calculation involves multiplying the Fixed Fuel Factor by the kilowatt-hour (kWh) sales, which are read, estimated, or determined based on metering voltage provisions during a specific billing month.
APPLICATION This Net Merger Savings Rider provides for a monthly credit calculated as a percentage of the customer's base rate revenue beginning with the first billing cycle of the July 2006 billing period and expiring after completion of...
AI summary The application introduces a Net Merger Savings Rider designed to provide customers with a monthly credit as a percentage of their base rate revenue. This credit, labeled as 'Merger Savings Credit' on bills, is intended to offset costs resulting from the merger between American Electric Power Company, Inc. and Central and South West Corporation. The rider is scheduled to begin in July 2006 and expire in June 2007, or upon the implementation of competition in Texas for the SPP.
No later than 60 days prior to July I, 2007, the Company will make a compliance filing to implement new Base Rate Revenue Percentages for the upcoming 12-month period. These percentages will be based on the refund amounts for the. upcoming...
AI summary The text outlines the procedure for the Company to file compliance documentation for new Base Rate Revenue Percentages, scheduled for implementation prior to July 1, 2007. These percentages are calculated based on refund amounts and true-up figures from previous periods. It specifically notes that over-under refund balances will be determined by rate class and incorporated into the Net Merger Savings Rider for the period beginning July 2006. The annual true-up, including interest, will persist until the Net Merger Savings Rider is no longer applicable as per the Final Order in PUCT Docket No. 19265.
MILITARY BASE ADJUSTMENT FACTOR Military Base Adjustment Factor shall be effective with the first billing cycle of May 2006 and will remain in effect Wltil revised eacl). year in accordance with PURA Section 36.354. Electric service suppli...
AI summary The text defines the application and billing procedures for the Military Base Adjustment Factor, which became effective in May 2006. It specifies that the factor applies to all kilowatt-hours billed across all rate schedules, including estimated usage for unmetered accounts. The factor must be clearly identified on customer bills and is explicitly excluded from accounts eligible for the Federally Owned or Operated Military Base Discount, in accordance with PURA Section 36.354.
IDSTORJCAL ADJUSTMENTS AND TRUE-UP The Military Base Adjustment Factor shall be based on actual historic usage and adjusted in May of each year to include the over/under recovery from the previous year. PUBUC UTIIJiY OOMMISSfllNOFTmS APPRO...
AI summary The document specifies the methodology for the Military Base Adjustment Factor, stating that it will be based on actual historic usage. It further establishes that the factor will be adjusted annually in May to account for any over-recovery or under-recovery from the preceding year. The text appears to be an excerpt from a tariff for electric service applicable to the entire system.
APPLICATION Applicable to all standard rates and all kilowatt-hours sold thereunder. For electric service billed under applicable rate schedules for which there is not metering, the monthly kilowatt-hour usage shall be estimated by the Com...
AI summary The application outlines the methodology for applying the Purchased Power and Conservation Factor to all standard electricity rates and kilowatt-hours sold. It specifies that for unmetered services, kilowatt-hour usage will be estimated by the Company. Additionally, the application notes that the cost of demand-side management (DSM) and renewable energy resources, approved during the integrated resource planning process and not recovered in base rates, will be added to the charges of the applicable rate schedules.
Method of Calculation For Purchased Power and Conservation Factor A Purchased Power and Conservation Factor (PPCF) is calculated annually for each major rate class. The formula for the PPCF is as follows: PPCF = Demand Side Management cost...
AI summary The document defines the methodology for calculating the Purchased Power and Conservation Factor (PPCF) for major rate classes. The calculation is performed annually and is based on a formula that combines Demand Side Management (DSM) costs and Renewable Energy Resource (RER) costs, divided by the estimated kilowatt-hour (kWh) sales.
Method of Calculation For Demand-Side Management Costs (DSM) DSM = (DP - TU) \ AAF, where: - DP = Estimated costs of DSM resource contracts executed in connection with the Company's integrated resource planning process or as a result of a...
AI summary The text outlines the specific mathematical methodology for calculating Demand-Side Management (DSM) costs. It defines DSM as the product of the estimated costs of DSM resource contracts (DP) and the Average Annual Factor (AAF). It also provides a formula for the 'True-Up' (TU) amount, which adjusts for variances between actual DSM-related revenue received from the Power Purchase Cost Factor (PPCF) and the actual costs intended for recovery, to be conducted on an annual basis.
- AAF = Adjusted Allocation Factor is ((((DP TU) \ D) / BPS) \ S) for each listed major rate class / divided by the sum of this calculation for all listed major rate classes. PUSLIC UTILI N CUMINIS APPROVE SIGHT OF TEXAS OCT 14 '05 DOCKET...
AI summary The document snippet provides the mathematical formula for the Adjusted Allocation Factor (AAF), which is used to determine the distribution of costs across major rate classes. The calculation incorporates variables including Estimated costs of DSM resource contracts (DP), True-Up amounts (TU), a specific factor (D), Base Power Sales (BPS), and a secondary factor (S). The text also references a 2005 docket from the Public Utility Commission of Texas regarding electric service tariffs.
BPS = Base Period Adjusted Kilowatt-hour Sales are the sales utilized to calculate the Kilowatt-hour rate for the first year of the PPCF. These kWh sales figures are as follows: Major Rate Class Base Period kWh Sales Residential 2,192,184,...
AI summary The document defines Base Period Adjusted Kilowatt-hour Sales (BPS) as the sales figures used to calculate the Kilowatt-hour rate for the first year of the Power Purchase Cost Factor (PPCF). It provides a breakdown of these kWh sales across four major rate classes: Residential, Commercial, Industrial, and Lighting. Additionally, it introduces the Demand Allocation Factor (D), which is derived from the company's most recent cost allocation study.
SWEPCO Demand Allocation Table Customer Class Allocator Residential 37.58% Commercial 46.32% Industrial 14.50% Lighting 1.6% S= Estimated annual kWh sales for each major rate class.
AI summary The document presents a demand allocation table for SWEPCO, which specifies the percentage of costs attributed to different customer classes. The allocation is distributed across four categories: Commercial (46.32%), Residential (37.58%), Industrial (14.50%), and Lighting (1.6%). This table is used to determine how costs are shared among various consumer segments based on their specific demand profiles.
Method of Calculation For Renewable Energy Resources(RER) RER = (ERC - TIJ) \ AAF: - ERC = Estimated costs of renewable energy resources in connection with the Company's integrated resource planning process or as a result of a Commission-a...
AI summary The document outlines the specific mathematical formulas and methodology for calculating Renewable Energy Resources (RER) costs within the electricity tariff. It defines the components for calculating the Adjusted Allocation Factor (AAF), which incorporates Estimated costs of renewable energy resources (ERC), True-Up amounts (TU) to reconcile variances between actual costs and revenue, Demand Allocation Factors (DE), Base Power Sales (BPS), and a scaling factor (S). These calculations are intended to determine the distribution of costs across major rate classes for cost recovery via the Power Purchase Cost Factor (PPCF).
PURCHASED POWER AND CONSERVATION FACTOR The following factors will be applied to the energy usage of retail customers beginning with thfi! billing month of November 2005. The factors will be identified on customer bills as "Purchased Power...
AI summary The document introduces the 'Purchased Power and Conservation Factor' (PPCF), which will be applied to the energy usage of retail customers starting in November 2005. This factor is designed to be clearly identified on customer bills to reflect the costs associated with purchased power and conservation efforts.
Purchased Power and Conservation Factor RATE SCHEDULE Residential Service (RS) RATE CODE 015,019,037,038 $per kWh {1) (0.000084} Rider to Residential Service for Con trolled Service to Water Heater (RWH) 011 (0.000084} General Service (GS)...
AI summary The document provides a rate schedule for the Purchased Power and Conservation Factor (PPCF) across various residential and commercial electric service categories. It specifies the dollar amount per kilowatt-hour (kWh) for multiple rate codes, including Residential Service (RS), General Service (GS), Lighting and Power Service (LP) at both secondary and transmission levels, Large Lighting and Power Service (LLP), and Metal Melting Service (MMS). It also includes a specific contract rate for Lone Star Steel Company.
PURCHASED POWER AND CONSERVATION FACTOR (Continued) Purchased Power and Conservation Factor RATE SCHEDULE Oil F1eld large Industrial Power Schedule (OLI) RATE CODE 329 $per kWh (1) (0.000087) Municipal Pumping Service (MPS) 540,550 ·(0.000...
AI summary The document provides a table of specific rate factors for the Purchased Power and Conservation Factor (PPCF) across various industrial, municipal, and private service schedules. It lists the specific numerical factors (e.g., 0.000083 to 0.000087) applicable to different service types, including Municipal Pumping Service, Private & Area Lighting Service, and Interruptible Power Service, noted as applicable to both metered and unmetered kilowatt-hours.
LARGE GENERAL SERVICE - TRANSMISSION - BACKBONE SERVICE DISCOUNT: A discount of $1,125 per customer and $0.15 per additional kW of demand per month will be allowed when service is supplied at a voltage of 115 kV or greater. - LOSS ADJUSTME...
AI summary This section outlines the tariff specifications for Large General Service - Transmission. It details a backbone service discount for high-voltage supply (115 kV or greater), loss adjustment protocols for secondary-side metering, and fuel cost recovery mechanisms. It also specifies the character of service (three-phase, 60 hertz, 69,000 volts or above), a minimum three-year contract period, and requirements for customers to pay for line extensions in advance.
pany or those initiated by activation of control equipment by Company, and those resulting from the operation of underfrequency relays installed in connection with instantaneous interruptible service. - FUEL COST RECOVERY: The charge per k...
AI summary The text outlines specific rate components and billing conditions for a utility service. It defines limitations on interruptions caused by control equipment or underfrequency relays, specifies a fuel cost recovery mechanism based on a specific tariff, and establishes payment terms including late fees. Additionally, it details a power factor adjustment based on reactive demand relative to measured kW demand and describes a mechanism for adjusting bills to include various taxes and fees resulting from new or amended laws.
Southwestern Public Service Company Purchased Power Cost Recovery Factor (PCRF) Texas Retail Jurisdiction Current Month 2006 ($/kWh) Factor Class January February March April May June July August September October November December N/ARROW...
AI summary The provided text contains a heading and a table header for the Southwestern Public Service Company's Purchased Power Cost Recovery Factor (PCRF) for the Texas Retail Jurisdiction for the year 2006. However, the data cells in the table are corrupted with repetitive, nonsensical text ('the states of the states of the states...') and do not provide actual numerical values or meaningful information regarding the cost recovery factors.
FUEL COST RECOVERY FACTOR Application of fuel cost recovery factors are as follows:
AI summary The document section introduces the application of fuel cost recovery factors within the regulatory proceeding. It serves as a heading for the specific methodology or application rules governing how fuel costs are recovered, though the specific details of the factors are not provided in this brief excerpt.
PRIMARY DISTRIBUTION FUEL COST RECOVERY FACTOR: The Primary Distribution fuel cost recovery factor to be billed is 3.5936¢ per kilowatt-hour and shall apply when service is metered at greater than or equal to approximately 12 kV and less t...
AI summary The document specifies the Primary Distribution fuel cost recovery factor, which is set at 3.5936¢ per kilowatt-hour. This rate is applicable to services metered at voltages between approximately 12 kV and 69 kV. This represents a specific cost recovery mechanism for fuel costs associated with primary distribution services.
SUB-TRANSMISSION FUEL COST RECOVERY FACTOR: The Sub-transmission fuel cost recovery factor to be billed is 3.4397¢ per kilowatt hour and shall apply when service is metered at approximately 69 kV and less than approximately 115 kV or Joss...
AI summary The document specifies the Sub-transmission fuel cost recovery factor, which is set at 3.4397¢ per kilowatt-hour. This rate is applicable to services metered at approximately 69 kV and less than 115 kV, or where Joss compensated meters are utilized to account for sub-transmission losses.
BACKBONE-TRANSMISSION FUEL COST RECOVERY FACTOR: The Backbone transmission fuel cost recovery factor to be billed is 3.4201 ¢ per kilowatt hour and shall apply when service is metered at greater than or equal to approximately 115 kV or Jos...
AI summary The document specifies the Backbone transmission fuel cost recovery factor, which is set at 3.4201 ¢ per kilowatt hour. This factor is applicable to services metered at approximately 115 kV or higher, as well as instances where Joss compensated meters are utilized to account for losses to the backbone transmission system.
Effective: November 1, 2005 Approved _ _ PURCHASED POWER COST RECOVERY FACTOR (PCRF)
AI summary The document provides the effective date for the Purchased Power Cost Recovery Factor (PCRF) as of November 1, 2005. It serves as a heading for the section detailing the mechanism used to recover costs associated with purchased power within the utility's rate structure.
Where: - P Estimated purchased power costs, exclusive of fuel, on an annualized basis to co generator in excess of the annualized amounts recovered in base rates. - AF = The demand allocation factor for each listed rate class used to alloc...
AI summary The text defines several variables and formulas used to calculate the Purchased Power Cost Recovery Factor (PCRF). It specifies how estimated purchased power costs (P) are handled for co-generators, the demand allocation factor (AF) based on the most recently approved cost-of-service study, and the calculation for a correction amount (CA) to address variances between actual allocated costs and revenues. It also identifies the estimated annual kilowatt-hour sales (ES) for the applicable year.
The following are the allocation factors to be used in the calculation of the PCRF: Rate Class Demand Allocation Factor (AF) Residential Lighting 0.130000 Residential All Electric 0.013154 Residential Space Heating 0.004100 Residential Wat...
AI summary The document provides a table of Demand Allocation Factors (AF) used to calculate the Purchased Power Cost Recovery Factor (PCRF) for the Southwestern Public Service Company. It lists specific numerical factors for various rate classes, including residential categories (Lighting, All Electric, Space Heating, Water Heating, Heat Pump), industrial/agricultural services (Irrigation, Cotton Gin, Grain Elev. & Feed Mill, Oil Well Pumping), and public authority services (Schools, Street Lights, Guard Lights).
FUEL COST FACTORS BY $/KWH #01 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 #109 0.041709 0.041709 0.041709 0.041709 0.034397 0.034397 0.034397 0.034397 0.034397 0.030896 - #10 0.044470 - 0.044470 0.0...
AI summary The provided text is a data table detailing fuel cost factors measured in $/kWh for various rate classes and true-up adjustments throughout the year 2006. It includes specific monthly values for multiple entries (e.g., #109, #10, #11 #12, #13, #14, #15, #16, #17, #18, #19) and notes regarding true-up amounts and specific calculations. The document serves as a technical reference for fuel cost recovery and adjustments within a rate case.
Adjustment The base demand and energy charges shall be increased or decreased in accordance with the current Adjustment Addendum published by TVA. (In addition, such charges shall be increased or decreased to (a) correspond to increases or...
AI summary The document outlines the methodology for adjusting base demand and energy charges based on the Transmission Valley Authority (TVA) Adjustment Addendum. These adjustments account for changes in the value of hydro-generation benefits allocated to residential consumers and ensure balanced hydro-allocation credits and debits between residential and other consumers. Additionally, the text specifies that facilities rental charges and reactive demand charges may be adjusted to reflect costs associated with delivery at voltage levels below 161 kV and reactive power provision.
IX. METER READING AND BILLING When the actual number of days between meter readings is more or Jess than 30 days, the Basic Customer Charge, the Distribution Demand Charge, the rkVA Demand Charge, the On-Peak Electricity Supply Demand Char...
AI summary The document outlines the billing methodology for periods where the interval between meter readings exceeds 30 days. It specifies that several components of the electricity rate, including the Basic Customer Charge, Distribution Demand Charge, rkVA Demand Charge, and various Electricity Supply Demand Charges, must be prorated. This is achieved by multiplying each charge by the actual number of days in the billing period and dividing by 30 to ensure accurate cost recovery for longer billing cycles.
X. STANDBY, MAINTENANCE OR PARALLEL OPERATION SERVICE A Customer requiring standby, maintenance or parallel operation service may elect service under this schedule provided the Customer contracts for the maximum kW which the Company is to...
AI summary This section outlines the requirements and billing conditions for customers seeking standby, maintenance, or parallel operation services. To qualify, customers must contract for the maximum kW the Company can supply. Key provisions include the customer's responsibility to install and maintain suitable protective apparatus at their own expense, subject to Company inspection. Additionally, it establishes that if distribution demand exceeds the contracted demand, the contract demand will be increased accordingly, while billing remains based on the contract demand.
SCHEDULE CS CURTAILABLE SERVICE (Continued) - III. DETERMINATION OF PAYMENT WHERE THE CUSTOMER IS SERVED IN ACCORDANCE WITH SCHEDULE 5, SCHEDULE 6, SCHEDULE 6TS, SCHEDULE GS-2 , SCHEDULE GS-2T, SCHEDULE GS-3 OR SCHEDULE GS-4 (Continued) -...
AI summary The text outlines the payment structures and billing penalties associated with 'Curtailable Service' under various rate schedules. It specifies payment rates per kW of Curtailable Load for different seasons (Winter and Summer) and establishes reimbursement requirements for demand increases. Furthermore, it defines the methodology for billing customers for failure to curtail, applying specific multipliers to demand in excess of Summer and Winter Firm Demands. It also details payment calculations for Schedule 8, which are independent of curtailment compliance.
SCHEDULE CS CURT AILABLE SERVICE (Continued) V. DETERMINATION OF PAYMENT WHERE THE CUSTOMER IS SERVED IN ACCORDANCE WITH SCHEDULE 8 (Continued) . divided by 3500, times the difference between the Contract Supplementary-Standby Demand and t...
AI summary This section of Schedule CS outlines the payment structures and billing procedures for customers served under Schedule 8. It specifies payment formulas based on the difference between Contract Supplementary-Standby Demand and Summer or Winter Firm Demand, adjusted by specific multipliers. It also details reimbursement requirements for overpayments if demands are increased during a season and establishes the methodology for determining the highest average kW measured during failure to curtail, excluding periods of approved scheduled maintenance.
FUEL CHARGE RIDER-B The charge for service under Virginia Electric and Power Company's Filed Rate Schedules 1, lP, IS, IT, lW, 5, 5C, 5P, 6, GS-1, GS-2, GS-2T, GS-3, GS-4, 6TS, 7, 8, 10, 25, 27, 28 and 29, as well as applicable energy char...
AI summary The document outlines the implementation of Fuel Charge Rider-B for Virginia Electric and Power Company. This rider establishes an increase of 0.135 cents per kilowatt-hour across various filed rate schedules and special contracts. Its specific purpose is to recover the actual fuel deferral balance as of December 31, 2003, in accordance with a previous settlement. The rider is designed to operate concurrently with Fuel Charge Rider-A and is scheduled to remain in effect until the balance is recovered or until June 30, 2007.
Aggregation of · Customer Baseline Load: A Customer having two or more operating plants may elect to have a single aggregated CBL determined for all or any combination of its operating plants in accordance with the CBL Determination Guidel...
AI summary The document outlines the rules for aggregating Customer Baseline Loads (CBL) for customers with multiple operating plants under B.C. Hydro. It specifies that while energy charges can be based on an aggregated CBL, demand charges remain separate for each plant. It also defines energy quantity calculations under the Retail Access Program Agreement, including adjustments for energy loss. Additionally, it covers interim CBL determinations, proration rules upon service termination, and notes that rates are exclusive of certain taxes.
Curtailable Power Credit: $3.00 per kW per month for the curtailable portion of the demand for curtailments up to 10 hours/day. Effective April 1, 1999, new or additional Curtailable Power Credits are no longer available. Start-up Rate: La...
AI summary The document specifies the 'Curtailable Power Credit' rate, which is set at $3.00 per kW per month for the curtailable portion of demand for curtailments up to 10 hours per day. It also notes a regulatory change effective April 1, 1999, stating that new or additional Curtailable Power Credits are no longer available.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB)
43 passages
TARIFF I.P. (Industrial Power) (Cont'd from Sheet No. 13.2) The Company shall not be obligated to supply demands in excess of that contracted for. Where service is supplied under the provisions of this paragraph, the billing demand each mo...
AI summary The text specifies the terms for Industrial Power (IP) service, stating that the Company is not required to supply demand exceeding contracted amounts. For instances where service is provided beyond the contract, billing is based on the highest demand recorded across the current and previous two billing periods, subject to established minimum charges. Additionally, it notes that customers with cogeneration or small power production facilities may utilize specific alternative tariffs or enter into special agreements.
AEP/CSW NET MERGER SAVINGS REDUCTION RIDER The net merger savings reduction rider factors identified below will reduce bills to customers pursuant to the Indiana Utility Regulatory Commission's April 26, 1999, Order in Cause No. 41210, rel...
AI summary The document describes the application of the net merger savings reduction rider, which reduces customer bills following the merger of American Electric Power, Inc. and Central and South West Corporation. Pursuant to an Indiana Utility Regulatory Commission Order, these savings are allocated to rate classes based on total revenues (excluding fuel cost adjustments) and applied via a per-kilowatt-hour factor. The factors are updated annually and reconciled for actual versus projected usage, remaining in effect until the base rates of Indiana Michigan Power Company are modified.
TERMS AND CONDITIONS OF SERVICE (Cont=d from Sheet No. 3.18) - B. The adjustment factor as computed above shall be further modified to allow the recovery of gross receipts taxes and other similar revenue based tax charges occasioned by the...
AI summary The text outlines the terms and conditions for fuel cost adjustments, specifically detailing how adjustment factors are modified to recover gross receipts taxes and reconcile differences between billed and experienced incremental fuel costs. It notes that certain provisions are suspended due to a 2005 Settlement Agreement (Cause No. 42045-S1). During this suspension, I&M is required to file semi-annual applications for fixed fuel adjustment charges, supported by testimony ensuring costs are not offset by operating expense decreases and that returns do not exceed authorized levels.
ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57 1/97 urs Use per month: $0.02230 per k\ F 40.02200 psi Ki wo.ozz to pet kyvii DATE OF ISSUE April 23, 1999 day year DATE EFF...
AI summary This document is a formal rate schedule (Form No. 13) issued by the Kansas City Power & Light Company under the authority of the Indiana Utility Regulatory Commission. It specifies the rates for Large Power Schedule I services at substation and transmission voltages. The schedule outlines customer charges, facilities charges, demand charges, and energy charges differentiated by season (Summer vs. Winter) and usage tiers for both industrial and municipal customers.
FILED AUG 01 1999 April 23, 1999 DATE EFFECTIVE August 1, 1999 For transmission voltage customers metered at substate the metered demand and energy shall be increased by 1.63% (metered at primary voltage), or 3.70% (metered compensation me...
AI summary The document outlines specific tariff adjustments for customers receiving service at transmission voltages, including percentage increases for metered demand and energy based on substation voltage. It also establishes the applicability of the Tax Adjustment Schedule (TA) to all customer billings under this specific schedule. The terms are subject to the Rules and Regulations filed with the State Regulatory Commission.
APPLICABLE. To Tariffs R.S., R.S.-L.M.-T.O.D. R.S.-T.O.D., S.G.S., M.G.S., M.G.S.-T.O.D., L.G.S., Q.P., C.I.P.-T.O.D., C.S.-I.R.P., M.W.,.O.L., and S.L. 1. The fuel clause shall provide for periodic adjustment per kwh of sales equal to the...
AI summary The document outlines the methodology for calculating the fuel cost adjustment factor within the utility's tariff. It specifies a formula to adjust for the difference in fossil fuel costs per kWh between base and current periods. Key components of the fuel cost (F) calculation include costs from owned/leased plants, energy purchased on an economic dispatch basis, and costs associated with forced outages (defined as nonscheduled losses exceeding six hours). It also specifies inventory costing methods and rules for including costs from Acts of God or other external disruptions.
TARIFF F.A.C. (Cont'd) (Fuel Adjustment Clause) - 5. Sales (S) shall be all kwh's sold, excluding intersystem sales. Where, for any reason billed system sales cannot be coordinated with the fuel costs for the billing period, sales may be e...
AI summary This regulatory text outlines the requirements and procedures for a utility's Fuel Adjustment Clause (F.A.C.). It defines the scope of 'Sales' for fuel cost calculations, specifies that fuel costs must include the invoice price minus discounts, and requires the utility to submit all fuel purchase contracts for Commission review. The regulation establishes a framework for monthly filings, public hearings every six months to review past adjustments, and a comprehensive biennial review to identify and disallow improper expenses or procurement practices.
RATE CALCULATION. - I. Pursuant to the finn! order of the Kentucky Public Service Commission in Case No. 2004-00420 and the Settlement and Stipulation Agreement dated October 20, 21l04 as filed and approved by the CoJnmission.-Kentucky Pow...
AI summary The document outlines the rate calculation and recovery mechanism for Kentucky Power Company regarding the 18-year extension of the Rockport Unit Power Agreement (UPSA). It specifies that Kentucky Power is authorized to recover supplemental annual payments (ranging from $5.1 million to $6.2 million) via surcharges applied to retail ratepayers. These revenues are allocated between CIP-TOD and 'All Other' tariff customers based on their proportion of total annual retail revenue and are collected on a KWH basis. Base rates will continue to include underlying UPSA costs.
The bill amount computed at the charges specified above shall be increased or decreased in accordance with the following: Fuel Adjustment Clause Sheet No. 70 Demand-Side Management Surcharge Sheet No. 71 Environmental Cost Recovery Surchar...
AI summary The document specifies the various surcharges and riders that adjust the final bill amount computed from specified charges. These include the Fuel Adjustment Clause, Demand-Side Management Surcharge, Environmental Cost Recovery Surcharge, Merger Surcredit Rider, Value Delivery Surcredit Rider, Franchise Fee Rider, and School Tax. This notice, issued on June 8, 2005, cancels the original sheet issued in July 2004.
MINIMUM ANNUAL CHARGE Service under this schedule is subject to an annual minimum of $54.96 per kilowatt for primary and $52.68 per kilowatt for transmission on-peak delivery for each yearly period based on the greater of (a), (b), (c), (d...
AI summary The document outlines the Minimum Annual Charge for primary and transmission on-peak delivery services. The annual minimum is determined by the greatest of five criteria, including the highest monthly on-peak maximum load, contract capacity, sixty percent of specified facility capacity, fixed annual amounts ($27,800 for primary; $263,400 for transmission), or adjustments for abnormal investments. Customers must make monthly payments of at least 1/12 of the annual minimum, with excess payments applied as credits.
AVAILABILITY OF SERVICE This schedule is a mandatory rider to all electric rate schedules. (1) The charge per KWH delivered under the rate schedules to which this fuel clause is applicable shall be increased or decreased during each month...
AI summary This document outlines a mandatory fuel clause rider for electric rate schedules, establishing the formula for monthly adjustments to the charge per KWH. The adjustment factor is based on the ratio of fossil fuel expenses (F) to KWH sales (S) between a base and current period. It specifies how to calculate fuel costs, including inclusions for forced generation or transmission outages, exclusions for economic dispatch purchases, and provisions for fuel costs recovered through inter-system sales.
FAC Fuel Adjustment Clause - (4) Sales (S) shall be all KWH's sold, excluding inter-system sales. Where, for any reason, billed system sales cannot be coordinated with fuel costs for the billing period, sales may be equated to the sum of (...
AI summary This document outlines the technical specifications and methodology for the Fuel Adjustment Clause (FAC). It defines 'Sales' as all KWH sold excluding inter-system sales, with specific protocols for when billed sales cannot be coordinated with fuel costs. It specifies that the cost of fossil fuel includes only the invoice price minus discounts, including transportation to the unloading point. The document also establishes the base period (ending September 2004), the base fuel factor (1.810 cents per KWH), and the current period calculation, effective July 2005.
Curtailable Service Rider 2 for such power, based on existing market conditions, at the time of the curtailment request. Customer must state agreement to the purchase of power, if that is Customer's intention, and the block of power to be...
AI summary The text outlines the operational rules for the Curtailable Service Rider 2 (CSR2), specifically focusing on the 'buy-thru' option. Customers may choose to purchase a specified block of power to avoid load curtailment, provided they have three years of compliance history under CSR2. The text specifies that customers are responsible for the cost of purchased power regardless of consumption. Additionally, it establishes a credit mechanism for months where the Company does not request load curtailment based on the difference between billed and contracted demand.
RATE Customer will receive a credit against the applicable power schedule for curtailable 10JV, as determined in the preceding paragraph, times the applicable credit. Customers will be charged for the portion of each requested curtailment...
AI summary The document specifies the mechanism for providing customer credits for curtailable 10JV. Customers are eligible for a credit against their power schedule based on the amount of curtailable 10JV determined in the preceding section, multiplied by the applicable credit rate. Conversely, if a requested curtailment is not fully met, the customer will be charged for the remaining portion at the applicable charge.
2006 Montly Billing Adjustments Beginning of Fuel Adjustment Factors KU Retail Monthly STOD Cost Recovery Applicable DSM ($Per Kwh) Environmental Cost Recovery Surcharge Applicable to Merger Surcredit Value Delivery Surcredit Effective Bil...
AI summary The document presents a table of monthly billing adjustments for the 2006 period, specifically focusing on various rate components for Industrial Power (I.P.). It details monthly values for fuel adjustment factors, cost recovery applicable to Rate LP, DSM (Demand Side Management) costs, and environmental cost recovery surcharges. Additionally, it tracks Merger Surcredits and Value Delivery Surcredits as percentages of the total bill across different billing cycles from January to December 2006.
FUEL CLAUSE When the unit cost of fuel in the charges for power purchased from Appalachian Power Company under Federal Energy Regulatory Commission rate schedule No. 23 is above or below a base unit price of 15.8563 mills per KWH, adjusted...
AI summary The document outlines the fuel clause mechanism for power purchased from Appalachian Power Company under Federal Energy Regulatory Commission rate schedule No. 23. It establishes a base unit price of 15.8563 mills per KWH, adjusted for losses. The clause dictates that the customer's bill will be increased or decreased based on the difference between the actual unit cost of fuel and this base price, using the most recent available calendar month's data.
METERED VOLTAGE The rates set forth in this tariff are based upon the delivery and measurement of energy at the same voltage, thus measurement will be made at or compensated to the delivery voltage. At the sole discretion of the Company, s...
AI summary The document outlines the tariff rules for metered voltage, stating that energy rates are based on delivery and measurement at the same voltage. It establishes that the Company has the discretion to compensate for voltage differences using loss-compensating equipment, formulas, or specific multipliers. Specifically, it defines multipliers for measurements taken at the low-side of customer-owned transformers (1.01) and the high-side of Company-owned transformers (0.98) to adjust KWH and KW values for billing purposes.
The Purchased Power Adjustment fuder credit applicable to each tariff is set below: Tariff Permanent ($)/KWH RS .00140 SGS .00114 MGS .00115 EHG .00123 cs .00117 PS .00138 LGS .00109 lL - .00083 OL .01154 FUEL CLAUSE RJDER
AI summary The document specifies the Purchased Power Adjustment fund credit values applicable to various electricity tariffs. It provides a table listing the permanent dollar amount per kilowatt-hour (KWH) for different service categories, including Retail Service (RS), Generation Service (SGS, MGS, LGS), and others such as Local Power (lL) and OL tariff. The values range from a credit of -0.00083 $/KWH to a charge of 0.01154 $/KWH.
Kingsport Power is authorized under the terms of this rider to adjust customers' bills in each applicable tariff whenever the unit cost offuel in the charges for power purchased from Appalachian Power Company under Federal Energy Regulator...
AI summary The text outlines the authorization for Kingsport Power to implement a fuel cost adjustment rider. This mechanism allows the utility to adjust customer bills based on the unit cost of fuel from Appalachian Power Company. The adjustment is triggered when the actual fuel cost deviates from a base unit price of 15.8563 mills per KWH (adjusted for losses). The monthly bill will be increased or decreased by the difference between the actual cost and the base price, based on the most recent available calendar month data.
Curtailable Service Rider 2 purchase of power, if that is Customer's intention, and the block of power to be purchased shall be specified by Customer at the time Company makes the request for curtailment. Should Customer elect to purchase...
AI summary The text outlines the 'buy-thru' provision and credit mechanisms under the Curtailable Service Rider 2 (CSR2). Customers who opt to purchase power during a curtailment event are responsible for the full cost of the block of power, regardless of actual consumption. If the purchased power is insufficient to meet the curtailment request, the deficiency is treated as non-compliance. This option is only available to customers with a three-year history of compliance under CSR2. Additionally, customers receive credits in months where no curtailment is requested based on the difference between billing demand and contracted firm or curtailable demand.
RATE Customer will receive a credit against the applicable power schedule for curtailable 'rWV, as determined in the preceding paragraph, times the applicable credit. Customers will be charged for the portion of each requested curtailment...
AI summary The text outlines the financial structure of the Curtailable Service Rider 2 (CSR2), detailing how customers receive credits for curtailable load and are charged for unmet curtailment requests. It specifies the Demand Credit and Non-Compliance Charge rates, which differ between primary and transmission components. Additionally, it establishes a penalty for non-compliance, noting that failure to curtail when requested may lead to the termination of service.
AVAILABILITY OF SERVICE This schedule is a mandatory rider to all electric rate schedules. (1) The monthly amount computed under each of the rate schedules to which this fuel clause is applicable shall be increased or decreased at a rate p...
AI summary The text defines the 'Availability of Service' rider, a mandatory fuel clause for electric rate schedules. It establishes a formula for adjusting monthly amounts based on a fuel cost adjustment factor. The formula accounts for fossil and nuclear fuel costs, including costs from forced outages, while excluding capacity charges and specific economic dispatch purchases. It specifies that fuel costs must be based on weighted average inventory costing and defines 'forced outages' as nonscheduled losses exceeding six hours.
RATE The monthly billing amount under each of the schedules to which this mechanism is applicable, including the fuel clause, shall be increased or decreased by a percentage factor calculated in accordance with the following formula. CESF...
AI summary The text outlines the calculation methodology for the Monthly Environmental Surcharge Factor (MESF). It establishes that the monthly billing amount for applicable schedules will be adjusted by a percentage factor. The formula determines the MESF by subtracting the Base Environmental Surcharge Factor (BESF) from the Current Environmental Surcharge Factor (CESF), where the CESF is calculated as the ratio of the jurisdictional total of approved environmental compliance plan revenue requirements to the total revenue for the current expense month.
DEFINITIONS - 1) For all Plans, E(m) = [(RB/12) (ROR + (ROR DR) (TR / (1 TR))] + OE - a) Where RB is the Total Environmental Compliance Rate Base. - b) Where ROR is the Rate of Return on Environmental Compliance Rate Base, designated as th...
AI summary This document provides formal definitions for calculating the Environmental Compliance Rate Base [E(m)] and related revenue components for an electric utility. It outlines the mathematical formulas for determining the revenue requirement based on the Rate of Return (ROR), Debt Rate (DR), Composite Income Tax Rate (TR), and Operating Expenses (OE). It also defines the methodology for jurisdictional allocation of environmental costs and the calculation of average monthly revenue [R(m)] for the purpose of environmental surcharge billing.
SURCREDIT The monthly billing amount computed under each of the rate schedules to which this surcredit is applicable shall be adjusted by the Merger Surcredit Factor, which shall be calculated in accordance with the following formula: Merg...
AI summary The document defines the calculation method for the 'Merger Surcredit Factor,' which is used to adjust monthly billing amounts for specific rate schedules. The factor is determined by the sum of two components: MS and BA. This surcredit appears to be a mechanism to provide billing adjustments related to a merger event.
(MS) is the Merger Surcredit which is based on the total Company savings that are to be distributed to Company's customers in each 12-month period beginning July 1, 1998. Savings to be Merger Surcredit Distributed (MS) Year 1 $ 6,183,320 1...
AI summary The text defines the Merger Surcredit (MS), which represents the total savings from a merger to be distributed to customers over 12-month periods starting July 1, 1998. It provides a 10-year schedule of the savings amounts and the corresponding Merger Surcredit percentages, which increase over time before stabilizing. The actual application of these factors is subject to the Final Order in PSC Case No. 2002-00430.
TERMS OF DISTRIBUTION - 1. The total distribution to Company's customers will, in no case, be less than the sum of the amounts shown above. - 2. On or before the 21st of the first month of each distribution year following Year 1, the Compa...
AI summary This section outlines the terms of distribution for a Merger Surcredit. It mandates that the total distribution to customers cannot fall below specified amounts. The Company is required to file a status report with the Commission by the 21st of the first month of each distribution year following Year 1, including a Balancing Adjustment calculation. The Surcredit is applied to electric service bills before taxes. Additionally, the Company must submit a plan by the midpoint of Year 10 regarding the Surcredit's future disposition.
RATE The monthly billing amount computed under each d the rate schedules to which this surcredit is applicable shall be adjusted by the Value Delivery Surcredit Factor, which shall be calculated in accordance with the following formula : V...
AI summary The text defines the calculation method for the Value Delivery Surcredit Factor, which is used to adjust monthly billing amounts for specific rate schedules. The factor is determined by a formula involving the Value Delivery Surcredit (VDS) and the Base Adjustment (BA).
(VDS) is the Value Delivery Surcredit which is based on the total Company net savings that are to be distributed to the Company's customers in each 12-month period. Net Savings To be Distributed Value Delivery Surcredit (VDS) Year 1, Dec 1...
AI summary The text defines the Value Delivery Surcredit (VDS), a mechanism where the Company's net savings are distributed to customers over 12-month periods. It provides a schedule of net savings and VDS percentages for the years 2001 through 2006. Additionally, it describes the Balancing Adjustment (BA), which reconciles over- or under-distributions of net savings from previous periods based on expected retail electric revenues, with a final adjustment applied in the second month following the VDS termination.
TERMS OF DISTRIBUTION (1) The total distribution to Company's customers will, in no case, be less than the sum of the amounts shown above for Year 1 through Year 5, plus one-twelfth of the amount shown for Succeeding Annual Periods for eac...
AI summary The document outlines the terms of distribution for a utility company, specifically defining the minimum total distribution to customers for a five-year period starting in 2006. It establishes a formula for calculating distribution amounts during the period the Value Delivery Surcredit is effective, ensuring that the monthly amount is not less than the sum of the Year 1 through Year 5 amounts plus one-twelfth of the Succeeding Annual Periods amount. The document was issued by John R. McCall on March 31, 2006.
Value Delivery Surcredit Rider - (2) On or before the 21st of the first month of each distribution year following Year 1, the Company will file with the Commission a status report of the Surcredit. Such report shall include a statement sho...
AI summary The text outlines the administrative and billing procedures for the Value Delivery Surcredit (VDS). It requires the Company to file annual status reports comparing expected versus actual distributions and to implement a Balancing Adjustment (BA) to reconcile discrepancies. The Surcredit is applied to customer bills after electric service charges but before taxes and fees. The rider specifies that the Surcredit will terminate once the Company files for or receives an order regarding an adjustment of electric base rates.
LOUISVILLE GAS AND ELECTRIC COMPANY MONTHLY ELECTRIC ADJUSTMENTS MONTHLY GAS ADJUSTMENTS Fuel Adjustment Clause !Cents/Kwh) STOD Cost Recovery Applicable to Rate LC !Cents/Kwh) DSM RATES Rate RS Rate GS Rate & VFD & STOD {Cents Per Kwh) LC...
AI summary The document provides a historical monthly data table for Louisville Gas and Electric Company, detailing various electric and gas adjustments from late 2005 through mid-2006. Key metrics include the Fuel Adjustment Clause, STOD Cost Recovery, DSM Rates for various service categories, Environmental Cost Recovery Surcharges, Merger Surcredits, and Value Delivery Surcredits. The data tracks fluctuations in costs and surcharges for both electricity and gas supply across different retail and generation service rates.
CHARACTER: Alternating current: 60Hz; single or three phase, at transmission voltages offered by the Company, as further described in the Company's Electric Policies and Electric Rate Application. PRICES: Summer Winter Service Charge per m...
AI summary The document outlines the technical specifications and pricing structure for high-voltage alternating current (60Hz) electricity service. It details a multi-tiered rate structure including fixed service charges, peak and off-peak demand charges based on kW thresholds, reactive demand charges, and energy charges based on peak and off-peak hours. Additionally, it identifies specific adjustments for taxes, energy efficiency cost recovery, and capital additions trackers.
Large General Service, LNP/LNO , continued DEMAND: The kW as shown by or computed from the readings of the Company's demand meter for the 15-minute period of the customer's greatest use during the month, determined to the nearest kW, but n...
AI summary The text outlines the rate structure and billing provisions for Large General Service, LNP/LNO customers. It specifies how demand (kW) and reactive demand (kVAR) are measured and billed, including a power factor threshold of 89.44% for reactive demand charges. It defines seasonal periods, establishes a minimum bill calculation including various charges and credits (such as a transformer ownership credit), and details payment terms, including a 1.5 percent monthly late payment charge.
PRICES: Summer Winter Service Charge per meter $1,200.00 $1,200.00 Demand Charge shall be the greater of the peak demand charge or the off-peak demand charge. Peak Demand Charge: per kW for the first 600 kW of peak demand per kW for the ne...
AI summary This document outlines the specific electricity pricing structure for Summer and Winter seasons, including service charges, demand charges (peak and off-peak), and energy charges per kWh. It also details reactive demand charges, transformer ownership credits, and mentions various cost recovery adjustments including AEP, Energy Efficiency Cost Recovery, and CNS Capital Additions Tracker, all calculated on a per-kWh basis.
Large General Service, LXP/LXO , continued DEMAND: The kW as shown by or computed from the readings of the Company's demand meter for the 15-minute period of the customer's greatest use during the month, determined to the nearest kW, but n...
AI summary This section outlines the rate structure and billing components for the Large General Service, LXP/LXO. It defines how demand (kW) and reactive demand (kVAR) are measured and billed, including a power factor threshold of 89.44% for reactive demand charges. It also specifies seasonal periods, the calculation for the minimum bill, a transformer ownership credit of $0.30 per kW, tax adjustments, and late payment penalties of 1.5% per month.
TIME-OF-USE PERIODS: Peak Periods: All time occurring after 9:00a.m., but before 10:00 p.m. each weekday, Monday through Friday, excluding specified holidays. Off-Peak Periods: All hours not designated as on-peak hours. Specified Holidays:...
AI summary This text outlines the terms for Rider No. 2 to Electric General Service and Large General Service (Curtailment Service) in the South System. Customers qualifying for this rider must demonstrate the ability to curtail 100 kW to 250 kW of load during specified periods. The rider provides annual credits per kW of curtailable load based on contract length (3-year, 5-year, or year-to-year). It also establishes reimbursement terms if a customer's failure to curtail forces the Company to purchase capacity from the Mid-Continent Area Power Pool (MAPP).
Rider No. 2 to Electric General Service and Large General Service (Except Price Schedule LCL) -Curtailment Service (can't) Option B customers may request a change in the firm power level annually. In addition, on 24 hours' notice, customer...
AI summary This document outlines Rider No. 2 for Electric General Service and Large General Service regarding Curtailment Service. It details two options for customers: Option B allows for annual firm power level changes and 24-hour service cancellation (with forfeiture of summer credits), while Option A requires immediate notification for increases. The Company reviews expected loads annually and may adjust minimum firm power levels based on historical demand. It also includes provisions for standby generators, minimum billing, and tax adjustments.
DEFINITIONS: Curtailment Service: Electric service which includes a credit for those customers who agree, on notice from the Company, to reduce electric demand to a predetermined level (firm power level). Firm Power Level: The level to whi...
AI summary This section defines technical terms related to demand management, including Curtailment Service, Firm Power Level, Expected Load at Time of System Peak, and Curtailable Load. It also introduces the Alternate Energy Producer (AEP) Cost Recovery Clause, which allows for the recovery of unrecovered payments to AEPs in excess of marginal energy costs. The clause includes a specific recovery factor, an annual reconciliation process, and provisions for adjusting factors based on significant deviations in marginal costs or actual payments.
ALTERNATE ENERGY PRODUCER REVOLVING LOAN FUND COST RECOVERY: Costs are the unrecovered amount of payments to the AEP Revolving Loan Fund established in Iowa Code Section 476.46. These costs are currently reflected within the Energy Efficie...
AI summary This document clarifies the cost recovery mechanism for the Alternate Energy Producer (AEP) Revolving Loan Fund, established under Iowa Code Section 476.46. It specifies that these costs are currently integrated into the Energy Efficiency Cost Recovery clause rather than being recovered through a separate factor. The Energy Efficiency Cost Recovery clause covers unrecovered expenditures and carrying costs for ongoing programs, with annual portions allocated to major class categories and converted to a per kWh basis based on forecasted sales.
Energy Efficiency Cost Recovery Factors: East Sustame East System: Residential Commercial/ Small Gen'l Svc Industrial/ Large Gen'l Svc Lighting Total On-going MidAmerican Costs $0.00231//kWh $0.00159/kWh $0.00159/kWh $0.00012/kWh 1 North S...
AI summary The document provides a table of ongoing energy efficiency cost recovery factors for the East and North systems. It specifies costs per kilowatt-hour (kWh) for different customer categories, including Residential, Commercial/Small General Service, Industrial/Large General Service, and Lighting. The costs are consistent across both systems, with residential rates at $0.00231/kWh and lighting rates at $0.00012/kWh.
LCL, and ABS RECONCILIATION: A reconciliation will be filed annually. The energy efficiency costs recovered from customers during the prior period will be compared to those which were C C 1st Revised Sheet No. C-4.20 Canceling Sub Original...
AI summary The document outlines the transition and calculation methodology for the Cooper Nuclear Station (CNS) Capital Additions Tracker. It specifies that the tracker was eliminated for most electric rates effective September 30, 2004, while remaining active for residential and street lighting rates. For these specific classifications, factors were established to ensure revenue-neutral adjustments. The text provides specific kilowatt-hour (kWh) rates for various residential and street lighting categories effective November 30, 2006.
$0.00045/ kWh RBN, RWN, RTN North $0.00045/ kWh RSN, REN, RAN,RHN North $0.00032 I kWh SLN South $(0.00040)/ kWh RBS, RWS, RTS South $(0.00033)/ kWh RSS,RES, RAS, RHS South $(0.00036) I kWh SLS R R R The CNS capital additions charge for re...
AI summary The document outlines specific rate adjustments for CNS capital additions charges affecting residential and street lighting rates, effective November 30, 2006. For the East and North Systems, rates were increased to offset a reduction in the AEP Cost Recovery Clause rate. Conversely, for the South System, rates were decreased by proportionally distributing the dollar amount of the East and North System's reduction based on South System kWh sales.
N-46Rebuttal Evidence of NSPI - REDACTED (Large File - 31 MB)
13 passages
1.0 OVERVIEW 2 3 4 5 6 7 8 9 1 Nova Scotia Power's 2007 Rate Application is the third application in succession, and the fourth in five years. In 2007 NSPI and its customers will experience high and volatile fuel prices. The ability to rec...
AI summary Nova Scotia Power Inc. (NSPI) is requesting rate increases for 2007 due to rising fuel costs and the need to recover deferred expenses. The company argues that timely recovery of these costs is essential for financial stability and continued service delivery. The increase is largely attributed to higher fuel prices compared to previous years.
2007 Revenue Requirement 23 24 25 26 27 28 There are Intervenors recommending reductions to NSPI' s 2007 revenue requirement. This is understandable. No one likes costs to increase, including NSPI. The reality however, is that the fuel cos...
AI summary Intervenors recommend reducing NSPI's 2007 revenue requirement, but NSPI argues that increasing fuel costs necessitate rate increases. Dr. Stutz's recommendations are criticized for not meeting Bonbright's criteria, potentially impairing NSPI's ability to recover costs. The Public Utilities Act mandates cost recovery, and selective use of evidence to reduce revenue requirements would be unfair and legally problematic.
3 Several points should be made: 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 - Fuel prices have been extremely volatile. All parties to this proceeding acknowledge that volatility is likely to continue. In fact, Liberty sta...
AI summary The document discusses the volatility of fuel prices and the need for a fuel adjustment mechanism to recover prudently incurred fuel costs. It highlights that such mechanisms are widely used in North America and could reduce financial risks for NSPI. The current regulatory process is criticized as disruptive and expensive, with calls for higher standards in intervenor testimony. EVA recommends the Board issue a directive to design a fuel adjustment mechanism and establish a deferral account.
Timing of Forecast Liberty suggests NSPI has forecasted at the time of high prices and has been reluctant to provide information that could support adjustments. On the contrary, NSPI has provided all critical information related to the 200...
AI summary Liberty claims NSPI delayed providing information during high prices, but NSPI argues it provided all necessary data timely. Adjustments to fuel costs should be based on provided information, not arbitrary deferrals. NSPI's inability to predict market peaks is highlighted, and an adjustment to the January 8, 2006 fuel forecast is noted due to an additional gas margin identified.
2 3 4 5 6 7 8 In this section, NSPI presents the Rebuttal Evidence of Dr. Roger Morin in respect of return on equity (ROE). NSPI also responds to issues raised by consultants in regard to pension, depreciation, rate base and OM&G. The impo...
AI summary NSPI presents Dr. Roger Morin's rebuttal evidence regarding return on equity (ROE) and responds to issues raised by consultants on pension, depreciation, rate base, and OM&G. The section emphasizes the importance of maintaining the financial health of the utility by allowing an appropriate ROE and timely cost recovery.
3.2 Pension Expense 11 12 13 14 15 16 17 18 Mr. Gorman proposes a "normalization" of pension expense based on speculative future forecasts (pg. 15 of Gorman Evidence). By this he appears to mean an arbitrary reduction of this cost below th...
AI summary Mr. Gorman proposes normalizing pension expense using speculative future forecasts, which would reduce costs below actual recorded amounts without deferring unrecovered expenses. This approach is criticized as inappropriate because forecasting pension expenses is challenging due to factors like changing discount rates, which significantly impact calculated expenses.
3 4 5 6 7 8 9 The 2007 pension expense is now known with certainty, as the December 31 discount rate is now known. Normalizing or arbitrarily reducing 2007 pension expense based on future years estimated at today's assumptions is inaccurat...
AI summary The document discusses the 2007 pension expense for NSPI, noting that the discount rate has changed from 5.5% to 5.25%, increasing the pension expense from $33 million to $36 million. NSPI argues that this increase is a known and certain cost and should be reflected in the revenue requirement, rather than being adjusted based on speculative future estimates.
3.8 Foreign Exchange 21 22 23 24 25 26 NSPI hedges foreign exchange (FX) like other commodities, on a portfolio basis. This approach has remained unchanged from previous rate applications. Additionally this approach is consistent, standard...
AI summary NSPI uses a portfolio-based approach to hedge foreign exchange, which is consistent with industry practice and provides stability. An intervenor suggested reducing the revenue requirement by $14 million, but this was based on outdated information and ignored NSPI's 80% hedging rate. NSPI's approach is deemed appropriate and reasonable, with no legitimate evidence supporting a reduction.
Evidence, at page 21 , lines 5-6 66 SEB Consultant IR Response - NSPI IR-11, filed January 12, 2007 recover the costs needed to provide that service is a material violation of the regulatory compact. 3 4 2 1 If Dr. Stutz is sincerely conce...
AI summary The text discusses NSPI's request to defer increased fuel costs due to changes in load factors and customer baseline loadshapes, arguing that it is reasonable to recover these costs on a deferred basis. The text also notes that the ELI 2P-RTP rate contributed to higher fuel costs and that NSPI should not be financially penalized for delaying its rate increase application.
4.3 Outstanding Approvals and Deferrals 25 26 27 28 29 30 31 32 In Section 11 of its Application, NSPI has identified several regulatory items that were outstanding as of the time of filing of the Application. This evidence highlights for...
AI summary NSPI has identified several outstanding regulatory items in its application, which require cost recovery through revenue requirements. Consultants have criticized NSPI for attempting to evade regulatory constraints by including placeholders for ongoing matters. NSPI argues that only known and measurable costs should be incorporated into the revenue requirement.
Decrementa1 Rebates 2 3 4 5 6 1 There was considerable discussion during the BLUR-replacement proceeding (P-883) regarding the difference between the value of credits that would be paid to SEB for a load decrement priced at marginal cost (...
AI summary During the BLUR-replacement proceeding (P-883), there was discussion about adjusting the value of credits paid to SEB for load decrements. SEB's consultant suggested a 94 percent adjustment factor based on historical data, while Dr. Stutz proposed a lower factor of approximately 77 percent. SEB proposed a three-tiered adjustment mechanism to address NSPI's concerns about marginal cost credits exceeding fuel cost savings.
Incremental Charges 9 10 11 12 13 14 8 When questioned by NSDOE (during P-883) for clarification of how an adjustment factor would be applied to the marginal costs when SEB's load is above the CBL77 (i.e. incremental load), Dr. Stutz appea...
AI summary The text discusses the Board's decision not to adjust marginal costs for incremental load, despite significant differences between marginal cost and avoided cost for decremental load. NSPI argues that an adjustment factor should be applied to incremental load pricing to ensure costs are properly reflected. This decision is linked to the tariff credit and debit mechanism, which NSPI believes may overcredit SEB.
costs allocated to the Unmetered class by approximately $120,000, and reduces the calculated C-3 weighting factor to 1.05 as 80 Direct Evidence of Alan Rosenberg, Dec. 20, 2006, page 31 , lines 12-15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16...
AI summary HRM expresses concerns regarding the Unmetered class rate calculations, specifically the C-3 weighting factor and the allocation of costs. NSPI proposes adjusting the weighting factor to 1.0, while HRM suggests a lower value. The UARB has approved the cost of service methodology, but the SEB consultant recommends changes.
N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB)
24 passages
Commercial Paper RATING UPDATE Nova Scotia Power Inc. (NSPI or the Company) continues to perform relatively well and is expected to benefit from the generally positive regulatory decision by the Nova Scotia Utility and Review Board (UARB),...
AI summary Nova Scotia Power Inc. (NSPI) maintains a positive credit outlook following a favorable 2006 rate decision by the Nova Scotia Utility and Review Board. While 2005 metrics were pressured by high fuel costs, 2006 saw recovery due to lower expenses and a favorable natural gas contract settlement. The UARB approved substantial recovery of 2006 projected fuel costs, despite some 'imprudently incurred' costs being disallowed. NSPI's rating is supported by stable cash flows, a regulated capital structure, and favorable load growth, though the lack of a fuel adjustment mechanism remains a key risk.
Strengths - Regulated operations contribute to earnings and cash flow stability - Cash flow from operations are expected to remain sufficient to fund capital expenditures and dividends - Geographic isolation and limited interconnections ar...
AI summary The text highlights the financial and operational strengths of the regulated utility. It notes that regulated operations provide stable earnings and cash flow, which are sufficient to support capital expenditures and dividend payments. Furthermore, the company benefits from geographic isolation and limited interconnections, creating barriers to entry for competitors. Additionally, the transition to cleaner burning coal is expected to provide a short-term reduction in emissions.
Challenges - Lack of a FAM/regulatory lag impacts earnings - Earnings sensitive to weather and fuel costs - High-cost generator/low population density of franchise - Future competitive pressures from gas distribution network under developm...
AI summary The document outlines several operational and financial challenges facing the utility. Key issues include the impact of regulatory lag on earnings due to the fuel adjustment mechanism, and high sensitivity to weather and fuel costs. The utility faces structural challenges such as high-cost generation and low population density within its franchise. Furthermore, it identifies competitive threats from a developing gas distribution network by Heritage Gas Limited and environmental risks associated with coal-based generation and oil exposure.
EGULATION SPI is regulated by the UARB under a cost-of-service methodology. - Large industrial customers (approximately 15% of sales volumes) are subject to annually adjusted rates, which are adjusted based on an approved formula. - Export...
AI summary The text outlines the regulatory framework for Nova Scotia Power Inc. (NSPI), which is governed by the UARB under a cost-of-service methodology. It highlights a 2006 rate ruling where the UARB approved an 8.6% rate increase and signaled a shift toward full-cost recovery for fuel costs, ending prior 'imprudence' disallowances. The UARB recognized NSPI's improved fuel procurement strategies and noted that while a fuel adjustment mechanism (FAM) is not yet approved, it remains a logical next step once the procurement strategy is finalized.
Strengths - (1) Regulated operations provide a high degree of earnings and cash flow stability. Regulation also ensures the balance sheet remains stable, which currently reflects a 37.5% deemed equity. NSPI provides 97% of the generation,...
AI summary The text outlines the strengths of Nova Scotia Power Inc. (NSPI), highlighting its stable earnings, cash flow, and dominant market position in Nova Scotia's electricity generation, transmission, and distribution. It notes that while rates are high, geographic isolation and limited interconnection act as barriers to competition. Additionally, it discusses NSPI's transition to international low-sulphur coal imports to reduce emissions, noting that the UARB has deemed these fuel expenses prudent and recoverable.
Challenges - (I) In the absence of a FAM, the Company must apply to the regulator for recovery of fuel costs. Regulatory lag can have a material impact on earnings and cash flow, since rate decisions cannot be implemented retroactively. -...
AI summary Nova Scotia Power Inc. (NSPI) outlines several operational and financial challenges, including the need for a fuel adjustment mechanism (FAM) to mitigate regulatory lag and commodity price volatility. The Company highlights its high-cost generation profile and the competitive threat posed by natural gas, noting that infrastructure costs and residential load profiles may limit market share loss. Additionally, NSPI discusses the financial burden of environmental compliance for its coal-based generation and its ongoing discussions with the UARB regarding cost-recoverable emissions reduction strategies.
Outlook - As a stable, regulated business in a relatively mature market, NSPI's earnings are expected to remain relatively stable over the medium term, absent significant volatility in fuel prices. - The Company will benefit from further e...
AI summary Nova Scotia Power Inc. (NSPI) expects stable earnings over the medium term, supported by provincial economic growth and a recent 8.6% rate increase designed to recover higher fuel costs. While the Company aims to earn within its allowed ROE, global commodity price volatility remains a key challenge. The text notes that full fuel-cost recovery will eventually boost earnings, as current figures reflect the Company's absorption of these costs. It also mentions specific financial items including a past coal contract write-off and deferred taxes.
relates to the one-time write-off of $13.4 million paid to the Cape Breton Development Corporation in 2001 to tenninate a coal supply contract. For YE2005, represents $15.3 million in deferred taxes that were incurred between Jan. I, 2005...
AI summary The text discusses several specific financial items regarding Nova Scotia Power Inc. (NSPI). It addresses a one-time $13.4 million write-off related to a 2001 coal supply contract termination with the Cape Breton Development Corporation. It also notes $15.3 million in deferred taxes from early 2005 pending UARB approval for rate recovery. Finally, it details the accounting for approximately $1.1 billion in defeasance securities, where excess costs over debt face value are deferred and amortized.
Strengths: • Monopoly service franchise for essential service • Limited direct competition in generation • Cost-of-service regulation that mitigates most operating risks
AI summary The document outlines the inherent strengths of the utility's position within the Nova Scotia regulatory framework. These strengths include a monopoly service franchise for an essential service, limited direct competition within the electricity generation sector, and a cost-of-service regulatory model that serves to mitigate the majority of the utility's operating risks.
Weaknesses: - Partial exposure to fuel price risk - Intermediate financial profile - Significant regulatory assets with delayed recovery prospects
AI summary The document identifies three primary financial and structural weaknesses regarding the entity's position. These include partial exposure to fuel price risk, an intermediate financial profile, and the presence of significant regulatory assets that face delayed prospects for recovery. These factors collectively suggest potential risks to the entity's financial stability and its ability to recoup costs efficiently within the regulatory framework.
Rationale The ratings on Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI; BBB/Stable/ ), are based on the consolidated business and financial risk profile of the parent, Emera, which is itself based on the consolidated rating m...
AI summary The text provides a credit rating rationale for Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI). The ratings are supported by stable regulated cash flows from monopoly utility operations in Nova Scotia and Maine. However, the rating is constrained by a moderate financial profile, exposure to higher-risk marketing activities, and a lack of a timely fuel cost recovery mechanism for NSPI. Concerns are also noted regarding potential leverage pressure from new pipeline investments and the volatility of fuel costs relative to regulated rates.
Regulation: regime presents some issues Cost-of-service regulation supports Emera's business risk profile. Nevertheless, the specific regulation that applies to NSPI is viewed as somewhat less favorable than other regulatory regimes. - The...
AI summary Nova Scotia Power Inc. (NSPI) argues that its current regulatory regime is less favorable than those governing its affiliate, Bayonne Hydroelectric Corporation (BHEC). NSPI highlights risks such as the lack of a fuel cost variance mitigation mechanism and the UARB's prioritization of rate stability over cash flow, citing a C$150 million tax recovery deferral. In contrast, BHEC benefits from supportive US regulations, including a higher ROE range, automatic tariff adjustments, and a 50-50 sharing mechanism for performance-based regulation.
NSP is predominantly a coal/pet coke burning utility and is currently exposed to significant fuel price risk. While solid fuel-fired generation makes up only 54% of NSP's total capacity of 2,283 MW, solid fuel-fired generation represents 7...
AI summary Nova Scotia Power Inc. (NSP) faces significant fuel price risk due to its heavy reliance on coal and pet coke for 73% of its energy production. Because NSP lacks a fuel cost pass-through mechanism, it is vulnerable to price volatility. The Nova Scotia Utility and Review Board (UARB) has historically been critical of NSP's procurement practices, leading to significant cost disallowances. These disallowances, combined with tax and depreciation factors, have weakened the cash flow metrics for both NSP and Emera.
Rating Rationale NSP's financial metrics, including ratios of FFO/Debt of approximately 12% and FFO/Interest of less than 3.0x, are weak for a Baa1-rated regulated electric utility at the high end of the low business risk category under Mo...
AI summary Moody's provides a rating rationale for Nova Scotia Power Inc. (NSP) and Emera (EMA). NSP is assigned a Baa1 rating, placing it at the high end of the low business risk category due to weak financial metrics (FFO/Debt of 12%, FFO/Interest < 3.0x) and a challenging regulatory relationship involving cost disallowances and uncertain recovery. EMA is rated Baa2, primarily driven by the credit strength of NSP and its subsidiary BHE, while also accounting for EMA's minor unregulated activities and the structural subordination of its debt.
t changes in working capital items © Copyright 2006, Moody's InvestOrs ServiC Tn . and/OrilslicensOrs including Moody's Assurance cOnlPB.nY, ~ (together, "MOODY'S"). All rights reserved .
AI summary The provided text is a brief heading and copyright notice regarding the selection of key ratios for global regulated electric utilities. It specifically mentions changes in working capital items as a sub-topic. The content appears to be a fragment from a Moody's InvestOrs report.
Nova Scotia Utility and Review Board Mailing address PO Box1692, Unit •M• Halifax. Nova Smtia B313S3 [email protected] Web www.nsuarb.ca Office 3rd Floor 1601 Lower Water Street Halifax, Nova Scotia B3J 3P6 902 424-4448 t 902 424-3919 f...
AI summary The Nova Scotia Utility and Review Board is reviewing Nova Scotia Power Industrial's (NSPI) request to recover $3.6 million for a Distribution System Vegetation Management program. While the Board acknowledges that vegetation encroachment is a primary cause of power outages and supports the program's necessity for reliability, it notes that NSPI failed to include this foreseeable expenditure in its 2007 test year revenue requirement filing. Consequently, approving the request now would result in a revenue requirement increase.
Confirmation of Revenue Request NSPI confirmed that the revenue request being applied for was the revenue requestfiledwith its evidence of October 10, 2006. It has not been amended and will not be amended by NSPI. The Board is certainly pr...
AI summary Nova Scotia Power Industrial (NSPI) confirmed that its revenue request remains unchanged from its October 10, 2006, filing. The Board indicated a willingness to approve the program provided that ongoing annual costs are included in future rate applications, a matter to be addressed in a subsequent hearing. Additionally, NSPI submitted responses to the Board's inquiries regarding the Liberty Consulting Group's report on distribution system vegetation management spending.
Customer Requested Work and Hazard Trees Cost Justification The NSPI filing dated September 29, 2006 included funding of approximately $1 million to address Customer Requested Work and Hazard Trees. Each of these elements is discussed belo...
AI summary The document introduces the cost justification for funding related to Customer Requested Work and Hazard Trees. It references a filing by Nova Scotia Power Industrial (NSPI) from September 29, 2006, which allocated approximately $1 million to address these two specific areas. The text serves as an introduction to the detailed discussions of these elements within the proceeding.
Average Credit Provided by ELI 2P-RTP Three-Tiered Credit Mechanism The average percentage (of marginal cost) that SEB is credited, based on the three tiered credit mechanism of the ELI 2P-RTP rate, exceeds 95%. This is in contrast with th...
AI summary The document discusses the average percentage of marginal costs credited to SEB under the ELI 2P-RTP three-tiered credit mechanism. It notes that the actual credit exceeds 95% because the majority of load reductions occur in the first tier, which provides a 100% marginal cost credit. This figure is contrasted against Dr. Stutz's testimony in the ELIIR-2 Hearing, where he suggested a 77% credit rate was more appropriate.
Tier StoraEnso Bowater MW in tier of annual % decrement MW in tier of annual % decrement energy energy Tier 1 (@100% ofMC1 ) 75MW 82 % 30MW 93 % Tier 2 (@80% or SECL) 30MW % 10 10MW 6 % Tier 3 (@60% or SEC) Balance 95 MW) 8 % Balance 2MW)...
AI summary The document provides a comparison of energy load and annual percentage decrements for two industrial entities, StoraEnso and Bowater, across three tiers. Based on 2005 data, the analysis calculates the load-weighted average percent of marginal cost, which is 95 percent for StoraEnso and 98 percent for Bowater. The data outlines specific megawatt (MW) capacities and corresponding energy decrement percentages for each tier.
The actual figures for December 2006 shown in the table below indicate that even higher percentages are credited at full marginal cost. Tier StoraEnso Bowater MW in tier of annual % MW in tier of annual % decrement decrement energy energy...
AI summary The text analyzes the actual energy consumption figures for December 2006 for the industrial customers StoraEnso and Bowater. It highlights that a high percentage of their energy usage is credited at the full marginal cost (Tier 1), specifically 92% for StoraEnso and 99.99% for Bowater. This data is used to evaluate the distribution of energy across different pricing tiers of the Energy Efficiency Improvement Program - Two-Part Rate - Three-Tiered (ELI2P-RTP) tariff.
UNMETERED SERVICE CLASS ANALYSIS OF ALLOCATED CUSTOMER-RELATED EXPENSES 2006 Compliance Filing Cust. Costs Cust. Costs Total - Incl. assigned to assigned to Corp. 0/H Corp. 0/H Unmetered Class Unmetered Class Total ($000) ($000) Rate ($000...
AI summary The document presents a table regarding the 2006 Compliance Filing, specifically analyzing the allocation of customer-related expenses for the Unmetered Service Class. It breaks down total customer costs, distinguishing between those assigned to the Unmetered Class and those assigned to the Corporate 0/H Rate, expressed in both absolute dollar amounts and percentages.
Factor Calculation = (Unmetered Billing Services Costs / Total Billing Services Costs) / (Total Unmetered Accounts / Total NSPI Accounts) = (($46,476 + $32,387) / $2,600,000) / (7,491 / 462,531) Weighting Factor
AI summary The text describes a mathematical formula used to calculate a weighting factor for billing services costs. The calculation involves dividing the ratio of unmetered billing services costs to total billing services costs by the ratio of total unmetered accounts to total NSPI accounts. This factor is used to determine the proportional cost allocation for unmetered billing services within the NSPI account structure.
(IN THOUSANDS OF DOLLARS) (1) TOTAL (2) TOTAL (3) UNIT COST (4) TOTAL (5) (6) (7) DMD.RELATED EXPENSES ENG.RELATED EXPENSES ENG.RELATED (C/kW.h) CUST.RELATED EXPENSES TOTAL OPER. EXPENSES TOTAL RATE REVENUE % REVENUE TO EXPENSES ( 1) DOMES...
AI summary The document presents a detailed financial table breaking down operating expenses and rate revenues across various customer classes, including domestic, small general, general, large general, small industrial, medium industrial, large industrial, extra large interruptible, municipal, and unmetered categories. It specifies DMD-related, engineering-related, and customer-related expenses, providing a unit cost per kWh. The table also highlights direct expenses, returns on direct expenses, and the percentage of revenue to expenses for each category.