13.2 NSPI Payment Policy and Developer's Contribution
p. p. 16
13.2 NSPI Payment Policy and Developer's Contribution - 1) NSPI requires a customer contribution equal to the difference in cost between the cost of the underground secondary installation and the cost of overhead facilities normally provid...
AI summary NSPI requires developers to contribute the difference in cost between underground secondary installations and overhead facilities. Costs are calculated based on design, with allowances credited based on the number of services planned. Changes in design are subject to negotiation.