PARTIALLY CONFIDENTIAL (Attachment Only)
p. p. 4
PARTIALLY CONFIDENTIAL (Attachment Only) Cost Element Phase 1 – L5017/L5046 tap ($ cost) Phase 1 – L5017/L5046 tap (estimate comments) Phase 2 – 83V-504 switch ($ cost) Phase 2 – 83V-504 switch (estimate comments) T-line Material 155,799 P...
AI summary The document presents a cost breakdown for two phases of a project involving T-line materials, substation materials, and various other expenses. The costs are partially confidential and referenced in several attachments, with some estimates based on initial scopes and ongoing design work by CBCL.