Matter: Nova Scotia Power Inc. - CI C0053295 - L5004 Kearney Lake Structure Replacement - $6,836,784 (ATO)
2 passages 1 document

Cost Recovery across all matters →

N-1CI C0053295 - L5004 Kearney Lake Structure Replacement - Application 2 passages
RECOVERY p. p. 25
RECOVERY For soil samples, the recovery is recorded as the length of the soil sample recovered. For rock core, recovery is defined as the total cumulative length of all core recovered in the core barrel divided by the length drilled and is...

AI summary The text defines recovery for soil samples and rock core, specifying that recovery for soil is the length of the sample recovered, while for rock core, it is the percentage of cumulative core length recovered relative to the length drilled.

RECOVERY p. p. 43
RECOVERY For soil samples, the recovery is recorded as the length of the soil sample recovered. For rock core, recovery is defined as the total cumulative length of all core recovered in the core barrel divided by the length drilled and is...

AI summary The document defines recovery for soil samples and rock core as the length of material recovered relative to the length drilled, with rock core recovery expressed as a percentage per run.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →