Topic:"Cost To Customer" in M08059

Matter: Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
2 passages 2 documents

Cost To Customer across all matters →

70542Comments - IG 1 passage
Section 3
t will likely increase the number of interruptions and the cost to customers (including lost production). At some point the costs of these more frequent interruptions will drive a switch to firm load. The Industrial Group recommends that S...

AI summary The Industrial Group highlights risks of increased interruptions and costs to customers, recommending Synapse explore interruptible load for demand response. They stress the need for stakeholder input on assumptions and modeling, and sufficient time to address feedback before finalizing the report.

75687Addendum to Final Report - Generation Utilization and Optimization - DSM Avoided Costs 10-24-2018 1 passage
Section 8
493.89 417.07 368.94 304.32 279.56 258.56 322.72 305.85 271.26 265.30 250.78 251.97 239.53 262.26 242.83 227.87 209.53 96.78 Total - Energy basis 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 203...

AI summary The text presents numerical data on avoided energy costs, energy savings (Delta GWh), and cost per MWh (Capacity + Energy) from 2018 to 2042. The note clarifies that avoided costs include emissions costs from Nova Scotia's emission caps, with no additional T or D costs included.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →