Matter: Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
3 passages 2 documents

Cost To Customer across all matters →

B-1-(i)Appendix 1 - HSV-2024-043-CA01 Condition assessment - Factorydale 2 passages
6.2.3 Option C – Full Decommissioning p. p. 112
6.2.3 Option C – Full Decommissioning As it was explained in a previous section (6.1.2) we use the help of an advanced language model to research on several databases for costs of decommission. The majority of the data was referred to, in...

AI summary Option C involves full decommissioning, which was researched using an advanced language model. The costs are similar across Canada, with decommissioning only providing maintenance cost savings and no income generation.

OBJECTIVES p. p. 146
OBJECTIVES Material Volume of Dam, V_dam m3 Material Removal Cost, C_removal CAD Environmental Remediation Cost, C_env CAD Engineering and Project Management Cost, CAD C_eng Contingency Cost, C_cont CAD Total Cost, C_total CAD INPUTS AND A...

AI summary The document outlines the calculation of costs associated with dam decommissioning, including material removal, environmental remediation, engineering and project management, and contingency costs. Inputs and assumptions are provided, along with references to data sources and standards.

B-3TOB (NSEB) RIR 1 to 42 - Redacted 1 passage
Interrogatory: p. p. 2
Interrogatory: Question(s): On page 3 of the Application, in the table with project costs: - (a) Provide an updated table that includes the total cost and a line item for the net tax that BEC will have to pay. - (b) Provide a cost estimate...

AI summary The interrogatory requests detailed cost breakdowns and explanations for various project costs associated with BEC's application, including tax, installation, spares, contingency, interest during construction, funding, audits, and environmental reports.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →