N-1Application - Redacted 18 passages
16 Figure 6: BUTU Tariff Charges p. p. 23
16 Figure 6: BUTU Tariff Charges 2026 2027 Variance Customer Charge ($/customer/month) 414.63 427.07 12.44 Energy Charge (cents per kWh) 9.129 8.683 (0.446) Demand Charge ($/kW) 11.822 14.341 2.519 17

AI summary The document presents a comparison of Bulk Time-of-Use (BUTU) tariff charges between the years 2026 and 2027. The data shows a projected increase in monthly customer charges of $12.44, a decrease in energy charges by 0.446 cents per kWh, and a significant increase in demand charges of $2.519 per kW. These figures illustrate the projected rate structure adjustments for the BUTU tariff over a two-year period.

GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 4 of 5 p. p. 37
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 4 of 5 (6) Customers must install metering equipment to monitor the output of the customer's generation. The equipment and installation must be approved by the Company and the costs wil...

AI summary The text specifies that customers who participate in generation activities must install approved metering equipment to monitor their output. It explicitly states that the Company must approve the equipment and its installation, and that all associated costs for the metering and installation are the responsibility of the customer.

SPECIAL CONDITIONS p. p. 37
SPECIAL CONDITIONS (1) Projections of the anticipated hourly energy price (week ahead and day ahead) will be provided to the customer according to the following schedule:

AI summary The document introduces a section on 'Special Conditions' regarding the provision of electricity pricing information. It specifically outlines that the utility is required to provide customers with projections for anticipated hourly energy prices on both a week-ahead and day-ahead basis, following a specified schedule.

SHORE POWER TARIFF Page 2 of 5 p. p. 37
SHORE POWER TARIFF Page 2 of 5 A credit equal to 32 cents per peak kilovolt-ampere of monthly peak demand will be applied where the transformer is owned by the customer and the customer is served at a transmission voltage level.

AI summary The text specifies a tariff component for shore power, detailing a credit mechanism for customers. A credit of 32 cents per peak kilovolt-ampere of monthly peak demand is applicable under specific conditions: the customer must own the transformer and be served at a transmission voltage level.

Penalty for Non-Compliance p. p. 37
Penalty for Non-Compliance All energy served after the 10-minute deadline has expired will be billed at $5.00 per kWh. In addition a fixed charge of $2,000.00 will be applied. The penalty charge is applicable above and beyond the Port Auth...

AI summary The document specifies the financial penalties for non-compliance regarding energy service deadlines. Any energy served after the 10-minute deadline will incur a variable rate of $5.00 per kWh plus a fixed charge of $2,000.00. These penalty charges are explicitly stated to be in addition to the Port Authority's standard monthly billing.

CUSTOMER CHARGE p. p. 37
CUSTOMER CHARGE The monthly customer charge under this tariff is calculated according to the following formula: Monthly customer charge = \frac{\text{forecast annual administration costs}}{\text{forecast number of customers subscribed \ 12...

AI summary The document specifies the calculation methodology for the monthly customer charge under the current tariff. The charge is determined by dividing the forecast annual administration costs by the forecast number of subscribed customers multiplied by 12. Based on these calculations, the resulting monthly customer charge is set at $427.07.

MINIMUM MONTHLY CHARGE p. p. 37
MINIMUM MONTHLY CHARGE The minimum monthly charge will be the customer charge plus the demand charge.

AI summary The document defines the structure of the minimum monthly charge for customers, specifying that it is composed of the sum of the customer charge and the demand charge.

MINIMUM MONTHLY CHARGE p. p. 37
MINIMUM MONTHLY CHARGE The minimum monthly charge shall be the administration charge.

AI summary The document specifies the regulatory rule for the minimum monthly charge, stating that it shall be equivalent to the administration charge.

The Energy Charge is made up of the following components: p. p. 37
The Energy Charge is made up of the following components: Energy Charge Components cents per kWh Fixed Cost Adder from Energy Balancing Service Tariff 2.253 Annually Adjusted Energy Savings Credit 0.000 Annual Energy Cost Adjustment 3.812...

AI summary The document outlines the components of the Energy Charge, which totals 6.065 cents per kWh. This charge consists of a Fixed Cost Adder from the Energy Balancing Service Tariff (2.253 cents) and an Annual Energy Cost Adjustment (3.812 cents). The Energy Charge applies to the monthly displaced energy of Licensed Retail Suppliers (LRS) on Nova Scotia Power's generation system, calculated as the total monthly LRS load including distribution losses, minus the top-up quantity determined under the Energy Balancing Service Tariff.

The Demand Charge is made up of two components: p. p. 37
The Demand Charge is made up of two components: Demand Charge Components dollars per kW Demand Charge from Standby Service Tariff $6.200 Annually Adjusted Demand Savings Credit $0.000 Total $6.200 The Demand Charge is applicable to the LRS...

AI summary The text defines the components and calculation methodology for the Demand Charge. It consists of a Demand Charge from the Standby Service Tariff and an Annually Adjusted Demand Savings Credit, totaling $6.200 per kW. The charge applies to a Licensed Retail Supplier's (LRS) monthly displaced demand on Nova Scotia Power's system, which is calculated as the difference between the Winter Peak Firm Demand and the Monthly Standby Contract Demand as specified in the Standby Service Tariff.

MINIMUM MONTHLY CHARGE p. p. 37
MINIMUM MONTHLY CHARGE The minimum monthly charge will be the Administration Charge.

AI summary The document specifies that the minimum monthly charge for the regulated service will be defined as the Administration Charge.

GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 4 of 5 p. p. 37
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 4 of 5 (6) Customers must install metering equipment to monitor the output of the customer's generation. The equipment and installation must be approved by the Company and the costs wil...

AI summary The text specifies a requirement for customers who participate in the Generation Replacement and Load Following Tariff to install metering equipment. This equipment is necessary to monitor the output of the customer's generation. The Company retains the authority to approve the specific equipment and its installation, while the financial responsibility for these costs lies solely with the customer.

ENERGY CHARGE p. p. 37
ENERGY CHARGE NSPI's actual hourly marginal energy costs, plus the following fixed cost adders for on-peak and offpeak usage: On-peak (7:00 am – 11:00 pm, non-holiday weekdays): 5.274 6.156¢/kWh Off-peak (11:00 pm – 7:00am, non-holiday wee...

AI summary The text outlines the structure of the ENERGY CHARGE, which is composed of NSPI's actual hourly marginal energy costs combined with fixed cost adders for on-peak and off-peak periods. On-peak adders are set between 5.274¢ and 6.156¢/kWh, while off-peak adders range from 0.713¢ to 0.918¢/kWh. Weekend and holiday rates align with off-peak pricing. Additionally, a credit of 32 cents per peak kilovolt-ampere is provided to customers who own their transformers. These adders are subject to annual submission and approval by the Nova Scotia Energy Board.

SPECIAL CONDITIONS p. p. 37
SPECIAL CONDITIONS (1) Projections of the anticipated hourly energy price (week ahead and day ahead) will be provided to the customer according to the following schedule:

AI summary This section introduces the special conditions regarding the provision of hourly energy price projections (both week-ahead and day-ahead) to customers. It establishes that these projections will be provided according to a specific schedule, though the specific details of that schedule are not contained within this particular excerpt.

SPECIAL CONDITIONS p. p. 37
SPECIAL CONDITIONS (1) Projections of the anticipated hourly energy price (week ahead and day ahead) will be provided to the customer according to the following schedule:

AI summary The document introduces a section on special conditions regarding the provision of hourly energy price projections. It specifies that Nova Scotia Power Inc. (NSPI) is required to provide both week-ahead and day-ahead hourly energy price projections to customers, following a defined schedule.

ENERGY CHARGE p. p. 37
ENERGY CHARGE Energy charges will vary by voltage level of the point of delivery and will be made up of two components. - (1) Annually adjusted fuel cost component which shall be the Company's forecast average annual marginal energy cost a...

AI summary The document outlines the structure of energy charges, which vary based on the voltage level of the point of delivery. These charges consist of two components, the first of which is an annually adjusted fuel cost component. This component is based on the Company's forecast average annual marginal energy cost approved under the GR&LF tariff, further adjusted for line losses at the specific voltage level.

Penalty for Non-Compliance p. p. 37
Penalty for Non-Compliance All energy served after the 10-minute deadline has expired will be billed at $5.00 per kWh. In addition a fixed charge of $2,000.00 will be applied. The penalty charge is applicable above and beyond the Port Auth...

AI summary The document outlines the specific financial penalties imposed for non-compliance regarding energy service deadlines. Any energy served after the 10-minute deadline will incur a variable rate of $5.00 per kWh, plus a fixed charge of $2,000.00. These penalty charges are stipulated to be in addition to the Port Authority's standard monthly billing.

MINIMUM MONTHLY CHARGE p. p. 37
MINIMUM MONTHLY CHARGE The minimum monthly charge will be the administration charge.

AI summary The document specifies that the minimum monthly charge for customers will be set equal to the administration charge.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →