Matter: Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper
6 passages 5 documents

Cybersecurity across all matters →

N-6NSPI (IG) RIR 1 to 31 - Redacted 1 passage
FOR MARCH 2027 p. p. 181
FOR MARCH 2027 (1) MWH (2) ENERGY LINE (3) ENERGY (4) CLASS NON- COINCIDENT (5) SYSTEM COINCIDENT (6) SYSTEM COINCIDENT (7) DEMAND LINE (8) SYSTEM (9) SYSTEM COIN. PEAK COINCIDENT (12) SHORE POWER (13) GEN.REPL./LOAD FOLL. (14) ELIADC (15)...

AI summary The table presents data for March 2027, including energy line items, system coincident demand, and export sales. It shows various categories such as Shore Power, GEN.REPL./LOAD FOLL., ELIADC, and others, with corresponding values and percentages. The data includes sub-totals and total figures for energy and demand lines.

N-8NSPI (PHP) RIR 1 to 6 1 passage
NSPI Responses to Port Hawkesbury Paper Information Requests
NSPI Responses to Port Hawkesbury Paper Information Requests 1 Request IR-1: 2 3 Reference: Application, page 5, lines 15-17. 4 5 "In accordance with the Company's Cost of Service Study (COSS), demand 6 7 related costs are proposed to be a...

AI summary NSPI responds to information requests related to the allocation of demand-related costs to the ELID Tariff class based on PHP assigned demand at the time of three coincident peaks (3CP), and the unavailability of data on hourly Net Load breakdown by customer class due to a cyber incident.

N-22RIRs filed from M12768 - NSPI (BW) RIR 1 to 10 - (Filed as N-2 in Matter M12768) - Redacted 2 passages
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to BW Information Requests
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to BW Information Requests Request IR-3: 2 3 Please refer to PDF page 3, "Operation Summary." 4 5 (a) Did the cyber event have any...

AI summary The document discusses the impact of a cyber event on the scheduling of Peak Hour Pricing (PHP) by Nova Scotia Power Inc. (NSPI), including the use of PLEXOS to create optimized hourly load schedules in the absence of PortOps. It also references the suspension of the Open Access Transmission Tariff (OATT) Standards of Conduct.

NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 For the NSPSO, data relevant to the administration or reporting of the ELIADC Tariff was 2 minimally impacted by the cyber incident. The web-based application used to maintain 3 System Operator logs was unavailable in th...

AI summary The NSPSO's administration of the ELIADC Tariff was minimally affected by a cyber incident. The web-based application for maintaining System Operator logs was unavailable initially, leading to the use of manual logs to capture system events such as loss of generating units and real-time PHP re-dispatch.

N-23RIRs filed from M12768 - NSPI (IG) RIR 1 to 15 - (Filed as N-3 in Matter M12768) - Redacted 1 passage
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to IG Information Requests p. pp. 1-13
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to IG Information Requests 1 Request IR-2: 6 In your explanation, specify when this began and when it concluded. 7 (b) Please deta...

AI summary NSPI responded to information requests regarding the ELIADC Tariff 2025 Annual Report, detailing actions taken following a cyber incident in April 2025. NS Power E&RM used historical data from PortOps and PLEXOS to create optimized load schedules for PHP and collaborated with the NSPSO to adjust operational strategies.

N-24RIRs filed from M12768 - NSPI (SBA) RIR 1 to 4 - (Filed as N-4 in Matter M12768) 1 passage
1 Request IR-1: p. p. 4
1 Request IR-1: 16 17 18 19 20 21 22 23 Despite challenges resulting from NS Power's cyber incident, the Nova Scotia Power System Operator (NSPSO), NS Power Energy Marketing team, and PHP adapted and worked collaboratively for the benefit...

AI summary The text discusses challenges caused by a cyber incident at NS Power, specifically under the ELIADC protocol, and inquires whether these challenges remain in 2026. It also asks for confirmation on the fuel prices used in the CBL forecast. The response should reference specific matter and exhibit numbers.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →