ITEM 5: AVOIDED COSTS OF DSM
p. pp. 16-17
ITEM 5: AVOIDED COSTS OF DSM NS Power will update avoided costs of DSM based on the evergreen IRP in collaboration with the DSMAG, targeting completion before the end of 2023.
AI summary NS Power plans to update avoided costs of Demand Side Management (DSM) using the evergreen Integrated Resource Plan (IRP) in collaboration with the DSMAG, aiming for completion by late 2023.