Matter: P-194 - Nova Scotia Power Inc. (NSPI) - 2022 Load Forecast Report
4 passages 4 documents

Dcrr across all matters →

N-12022 Load Forecast Report - Redacted 1 passage
Section 11
1 Figure 29: PV Impact to Energy (cumulative) .............................................................................. 47 2 Figure 30: Potential Peak Impacts from Batteries ...............................................................

AI summary This document lists figures from a regulatory proceeding, covering topics such as PV energy impact, battery potential, end-use intensities, electricity price forecasts, and demand-side management (DSM) savings. The figures include historical and projected data on residential, commercial, and industrial energy use, electrification trends, and sales components.

N-8Evidence of John Wilson, CA 1 passage
Section 39
John D. Wilson • Resource Insight, Incorporated Page 5 EXPERT TESTIMONY 2008 South Carolina PSC Docket No. 2007-358-E, surrebuttal testimony on behalf of Environmental Defense, the South Carolina Coastal Conservation League, Southern Allia...

AI summary Expert testimony discusses energy efficiency cost recovery mechanisms, including shareholder incentives and lost revenue adjustments, across multiple regulatory dockets. Testimonies also address the adequacy of energy efficiency considerations in integrated resource plans by utility companies.

87729Board Decision Letter 1 passage
Section 7
ing storm closures at peak periods. Lastly, Mr. Wilson requested that NS Power complete the line loss determination model and report on its progress on a quarterly basis until the project is complete. The SBA raised concerns about the accu...

AI summary Mr. Wilson requested NS Power to finalize the line loss model with quarterly updates. The SBA questioned the EV and space heating forecast accuracy, urging data integration and incentive evaluation. EOne recommended updating heat pump models, exploring electric thermal storage, and assessing DR capacity frameworks to address growing peak load.

86619E1 (NSPI) IR-1 to IR-12 1 passage
Section 16
ion Requests to Nova Scotia Power Inc. (NS Power) In the Matter of Nova Scotia Power Incorporated’s 2022 Load Forecast Report – M10569 NON-CONFIDENTIAL 1 (a) As part of its 2023-2025 DSM Plan, E1 has included EV managed charging in its 2 d...

AI summary The document contains requests to NS Power regarding its 2022 Load Forecast Report, focusing on demand response programs (including EV managed charging and Critical Peak Pricing), capacity savings double-counting, and electrification measures. E1 questions NS Power's integration of updated demand response programs and decarbonization comparisons in the forecast.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →