Preamble
p. p. 187
Annual avoided costs of energy and capacity were provided by NS Power, from the 2014 IRP using the Base level of DSM. Avoided costs of transmission and distribution were provided by NS Power in 2018. Total cost-effectiveness tests are calc...
AI summary The document outlines annual avoided costs of energy and capacity from NS Power's 2014 IRP and 2018 transmission and distribution costs. It describes cost-effectiveness tests using metrics like TRC, PAC, and WACC to evaluate energy efficiency programs and their financial impacts.