N-13Reply Evidence - NSPI 1 passage
Section 22 p. pp. 13-14
ribed in Section 7.0 of the Application, the existing RtR tariffs The Board's Interim Order in the 2026 DCRR proceeding (M12521) approved the continuation of the 2025 DCRR "until further order of the Board in this matter, or as part of NS...

AI summary The document references the Board's Interim Order in the 2026 DCRR proceeding (M12521), which approved the continuation of the 2025 DCRR until further order of the Board or as part of NS Power's ongoing general rate application. REI acknowledges that the AAR process is not the proper venue for revising tariff structures.

101197Board Order 1 passage
SPECIAL CONDITIONS p. pp. 14-15
SPECIAL CONDITIONS (1) The Port Authority owns and is responsible for the maintenance and operation of all electrical equipment required for the supply of port electricity to docked ships other than the meters and - metering transformers s...

AI summary The Port Authority and NSPI have defined roles and responsibilities regarding electrical equipment, metering, and operational procedures for port electricity supply. Special conditions include metering responsibilities, staff availability, scheduling, metering costs, transformer losses, and power factor requirements.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →