Topic/Matter Intersection

Topic:"Demand Side Management Advisory Group" in M12186

Matter: EfficiencyOne - 2024 DSM Annual Progress Report and 2024 DSM Evaluation Reports
3 passages 1 document

Demand Side Management Advisory Group across all matters →

E-22024 DSM Programs Evaluation Reports 3 passages
Table 14: Implementation Status of Past Recommendation for BNI DR p. p. 14
Table 14: Implementation Status of Past Recommendation for BNI DR # Recommendation Status Comments 2023 – BNI DR – R1 Use an additive same-day adjustment factor to establish the baseline load instead of a scalar same day adjustment factor....

AI summary Table 14 outlines the implementation status of past recommendations for the BNI DR program. Key actions include updating methodologies for baseline load calculations, establishing enrolled capacity based on test events, and identifying participants best suited for different event times. Some recommendations are complete, while others are in progress.

Table 1: 2024 BNI DR Corrected Tracked Available DR Capacity p. pp. 45-46
Table 1: 2024 BNI DR Corrected Tracked Available DR Capacity Program Component Result Value Tracked by E1 Corrected Tracked Value Relative Difference Value Unit Value Unit Value New Available DR Capacity 5.553 MW 5.702 MW 3% Total Availabl...

AI summary Table 1 presents the 2024 BNI DR corrected tracked available DR capacity with values before and after correction, showing a 3% increase in new available capacity and a 2% increase in total available capacity. Appendix VII provides an example calculation for available DR capacity.

This appendix summarizes all the recommendations made by the Evaluator as part of the 2024 evaluation of BNI DR. p. p. 54
This appendix summarizes all the recommendations made by the Evaluator as part of the 2024 evaluation of BNI DR. Section Recommendations Executive Summary 2024 BNI DR Recommendation 1: Update the BNI DR Baseline Considerations document to...

AI summary This appendix outlines two key recommendations from the 2024 evaluation of the BNI DR program. The first recommendation focuses on updating the BNI DR Baseline Considerations document to address issues related to building operating hours, lookback windows, and event exclusions due to missing AMI data. The second recommendation suggests continuing to use project reviews to evaluate available DR capacities in future evaluations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →