Topic/Matter Intersection

Topic:"Demand Side Management Resource Plan" in M12619

Matter: Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
3 passages 2 documents

Demand Side Management Resource Plan across all matters →

N-1Application - Redacted 2 passages
Section 209
uts of the condition score for these projects will be provided in subsequent ACE 10 Plans for five years following the in-service date of the project. 11 12 The Board’s Decision pertaining to the 2023 Performance standards provided the fol...

AI summary The Board has directed NS Power to prepare a comprehensive five-year reliability plan to track service improvements and progress against performance goals, to be filed by December 31, 2024. This follows the 2023 Performance Standards Report and relates to the 2026 ACE Plan.

Section 1363
1 Extension Period). As such, E1’s prior five-year DSM Plan development was temporarily paused 2 while E1 prepared and filed its 2026 DSM Plan Extension Application, which remains an open 3 Matter before the Board. 43 E1’s 2026 DSM Plan ta...

AI summary E1's 2026 DSM Plan extension targets 528.7 GWh energy savings and 16.3 MW DR capacity with $236.8M investment. NS Power collaborates with DSMAG on cost-effectiveness frameworks and electrification strategies, focusing on affordability and peak load reduction through hybrid electrification scenarios.

102222Closing Submissions - NSPI 1 passage
4.0 REPORTING ON TREE CONTACTS p. pp. 15-16
rse and non-adverse weather conditions, by increasing the separation between tree lines and power lines. As confirmed in response to CA IR-24(d), the 40% estimate continues to be validated through the experience and assessment of NS Power'...

AI summary NS Power discusses its methodology for estimating tree contact risks, validated by subject matter experts and field reviews. It acknowledges the 40% estimate remains reasonable and will continue to refine it as the vegetation management program evolves. The document references the 2026 ACE Plan Hearing Transcript and related exhibits.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →