Yates Annapolis Report - Site Decommissioning Estimate Summary Appendix E Strum Report - Estimation of Wetland Alteration Permitting Costs Appendix F Boreas Report - Hydro Asset Costing Document 14 5 REDACTED (CONFIDENTIAL INFORMATION REMO...
AI summary Nova Scotia Power (NS Power) is required to maintain 40% renewable generation by 2020 under Nova Scotia’s Renewable Energy Standards (RES), achieved partly through hydro power producing approximately 1 terawatt-hour annually. The Hydro Asset Study provides inputs for the next Integrated Resource Plan (IRP) and Depreciation Study, detailing the status of 17 hydro systems with 31 powerhouses and 50 generating units.
1 The Hydro Study outlines the assumptions and methodology used to determine these 2 values. The assumptions outline inclusions and exclusions pursued for the Hydro Study. 3 4 The Hydro Study, which includes Appendices A - F, provides the...
AI summary The Hydro Study details NS Power's methodology for calculating sustaining and decommissioning costs of hydro systems, including forecasted expenses and their inclusion in an Integrated Resource Plan (IRP). Costs outlined do not account for replacement energy or system-wide value, which will be addressed in the IRP process.
A copy of 24 the report prepared by Strum is attached as Appendix E (Strum Report). The Strum 25 Report corroborates the costs of wetland permitting, delineation, and monitoring 26 alterations. A summary of Strum’s qualifications can be fo...
AI summary The document references a Strum Report corroborating costs related to wetland permitting, delineation, and monitoring. It also cites the NSPI 2010 Depreciation Study (P-891/M03655) as a supporting reference. The text is partially redacted, with details about a Hydro Asset Study omitted.
-$500.00 Allowance General Parts -$1,000.00 Allowance Insulated Wire and Cables No. 1 -$1,000.00 Allowance Insulated Wire and Cables No. 2 -$1,000.00 Allowance ENGINEERING & PROJECT MANAGEMENT Engineering & Project Management $87,126.00 Si...
AI summary The text presents a cost breakdown for a site decommissioning estimate, including allowances for various materials and engineering management costs, with a subtotal of $890,993.60. Notes mention that HST is additional and that some infrastructure will be removed by others.
ƐƵďƐƚƌƵĐƚƵƌĞ͘^ƚŽĐŬƉŝůĞĚĞďƌŝƐĨŽƌĚŝƐƉŽƐĂů͘ x ZĞŵŽǀĞ ďƵƌŝĞĚ ƐĞƌǀŝĐĞƐ ŝŶĐůƵĚŝŶŐ ƚŚĞ ŽŶͲƐŝƚĞ ƐĞǁĂŐĞ ĚŝƐƉŽƐĂů ƐLJƐƚĞŵ͕ ƐĂŶŝƚĂƌLJ ƉƵŵƉƐ ĂŶĚ ƉŝƉŝŶŐ͕ ĂŶLJ ĨƌĞƐŚǁĂƚĞƌƉŝƉŝŶŐĂŶĚĞƋƵŝƉŵĞŶƚ͘ ϲϯ REDACTED (CONFIDENTIAL I...
AI summary The text discusses the management of asset retirement obligations and the impact of various financial and operational factors on the utility sector, including cost recovery and depreciation amortization. It also touches on the importance of regulatory oversight in ensuring compliance and transparency.
Demolition Estimate Criteria This study is intended to provide a reasonable approximation of expected costs for conceptual demolition plans, including consideration for site security (public safety) during demolition works; worker safety;...
AI summary This document outlines the criteria for estimating demolition costs, emphasizing safety, environmental protection, and compliance with regulatory standards. It references AACE International Class 5 estimates and CCME guidelines, noting the expected accuracy range and factors influencing estimate accuracy.
NOVA SCOTIA POWER INC. ‐ HYDRO PRODUCTION ANNAPOLIS TIDAL POWER GENERATION STATION POWERHOUSE DEMOLITION STUDY 4. Contractor General Mobilization, Removals and installation of temporary facilities as required. 5. Demolition of Interpretive...
AI summary The document outlines the steps involved in the demolition of the Annapolis Tidal Power Generation Station, including general mobilization, removal of structures, site remediation, and long-term security planning. It also mentions that demolition cost estimates include overhead and engineering costs.