Matter: Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
5 passages 5 documents

Depreciation Amortization across all matters →

N-3NSPI (CA) RIR-1 to 18 - Redacted 1 passage
3 # Indicators Condition Choices p. p. 26
CI 50518 CA IR-5 Attachment 19 Page 174 of 423 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 3 # Indicators Condition Choices Data Definitions/Explanations Protection and off road vehicles appear to effectively exclude or divert visitors and...

AI summary The text outlines various indicators and condition choices related to environmental protection, consumptive uses, domestic wells, and calcareous fen within a specific area. It includes data on wildlife disturbance, sustainable consumptive uses, proximity of domestic wells, and calcareous fen identification.

N-8Midgard Evidence - Redacted 1 passage
5.1.1 NS Power Submission p. pp. 29-30
5.1.1 NS Power Submission - The Project involves the refurbishment of the Ruth Falls Main Dam's water-retaining structures, with five - alternatives reviewed during the conceptual design phase: [45](#page-29-1) - 1. Option 1: Replace the e...

AI summary NS Power submitted a proposal for the refurbishment of the Ruth Falls Main Dam, presenting five design alternatives. Option 4 was selected due to its cost-effectiveness. NS Power argues that re-evaluation of the options was unnecessary because all would be similarly impacted by delays in the Fisheries Act Authorization and environmental permitting.

N-9Amended Evidence - Midgard - Redacted 1 passage
p. pp. 4-5
Table 3: Nova Scotia CPI Trend19 Table 4: Canada IPPI Trend20 Table 5: Ruth Falls Archaeological Costs24 Table 6: Comparison of Recent Project Archaeological Costs25 Table 7: Ruth Falls Main Dam Refurbishment Variance Summary28 Table 8: 20...

AI summary The document presents a series of tables detailing various cost-related data, including archaeological costs, labour costs, materials costs, administrative overhead, and other expenses associated with projects such as the Ruth Falls Main Dam Refurbishment and the 2019 ACE and ATO applications.

98138Board Decision 1 passage
[45] The Industrial Group stated that p. p. 4
asonable given the expected scope of archaeological work at the time. The Company submitted that the costs outlined in the ATO application reflect an updated approach, incorporating revised estimates. [58] In considering the Industrial Gro...

AI summary NS Power addressed concerns raised by the Industrial Group and SBA regarding the ATO application, stating that it has provided the required information to DFO and is proceeding with FAA consultations. It also committed to updating decommissioning and archaeological cost studies and will provide updates upon FAA approval.

101837Contingency Report #2 - Redacted 1 passage
REDACTED Ruth Falls Main Dam Refurbishment Contingency Report 2 Appendix A Page 1 of 1 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 0
REDACTED Ruth Falls Main Dam Refurbishment Contingency Report 2 Appendix A Page 1 of 1 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Account NSEB Approved Amount Spend-to-Date Contingency/ Unbudgeted Spend-to-Date Comments $8,074.00 $8,074.0...

AI summary The document outlines a contingency report for the Ruth Falls Main Dam Refurbishment, detailing approved amounts, actual spending, and unbudgeted expenditures. Key items include additional costs for water supply arrangements, meals, Mi'kmaq engagement, and administrative overheads. The report highlights discrepancies in cost allocations and the need for contingency funds.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →