A. Introduction
p. p. 40
A. Introduction 1. Title: Frequency and Voltage Ride-through Requirements for Inverter-based Resources 2. Number: PRC-029-1 3. Purpose: To ensure that IBRs Ride-through to support the Bulk Power System (BPS) during and after defined freque...
AI summary This document outlines the purpose and applicability of Frequency and Voltage Ride-through Requirements for Inverter-based Resources (IBRs) under PRC-029-1, aimed at ensuring IBRs support the Bulk Power System during and after frequency and voltage excursions.