Topic/Matter Intersection

Topic:"Distribution Planning" in M03324

Matter: E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria
15 passages 4 documents

Distribution Planning across all matters →

N-7Notice of Filing of NERC's 2010 Business Plan and Budget and the 2010 Business Plans and Budgets of Regional Entities and the Proposed Assessments to Fund Budgets 6/29/2010 1 passage
Section 39 p. p. 0
26 The total allocation to MRO consists of $2,065,574 allocated to the U.S. and $407,943 allocated to Canadian provinces.

AI summary The text provides a breakdown of the total allocation to MRO, with specific amounts allocated to the U.S. and Canadian provinces.

N-9Northeast Power Coordinating Council, Inc. Criteria Filing 6/30/2010 4 passages
TABLE 1 INTERVALS FOR PROTECTION ASSEMBLY TESTING p. p. 110
TABLE 1 INTERVALS FOR PROTECTION ASSEMBLY TESTING Non-Self Monitored Microprocessor-Based Microprocessor-Based Protection Assembly Protection Assembly Protection Assembly Note (1) Note (2) Note (3) All Protection Groups 4 years 6 years 8 y...

AI summary Table 1 outlines intervals for protection assembly testing, distinguishing between non-self monitored and microprocessor-based protection assemblies with varying testing intervals of 4, 6, and 8 years respectively.

TABLE 2 INTERVALS FOR DC CIRCUIT TEST TRIPPING p. p. 110
TABLE 2 INTERVALS FOR DC CIRCUIT TEST TRIPPING Non-Monitored Monitored Note (1) DC Circuit Tripping 4 years 6 years Note (1): Trip coil and DC circuit continuity is continuously monitored to an Operator.

AI summary Table 2 outlines the intervals for DC circuit test tripping, distinguishing between non-monitored and monitored conditions. The monitored condition includes continuous monitoring of trip coil and DC circuit continuity by an operator, with intervals set at 6 years compared to 4 years for non-monitored conditions.

7.0 Maintenance Considerations p. p. 158
7.0 Maintenance Considerations - 7.1 Additional periodic maintenance is recommended on the following protection equipment: - . On continuously monitored analog teleprotection channels, verify signal adequacy every twelve months. - . On non...

AI summary The document outlines maintenance recommendations for protection equipment, including teleprotection systems, batteries, chargers, and circuit breakers. It emphasizes the importance of evaluating specific circumstances for additional maintenance and designing Special Protection Systems to facilitate testing and mitigate risks.

Table 1 - Standard Test Procedures for key facilities and associated critical components required for system restoration p. p. 187
Table 1 - Standard Test Procedures for key facilities and associated critical components required for system restoration Table 1 - Standard Test Procedures for key facilities and associated critical components required for system restorati...

AI summary The document presents Table 1, which outlines standard test procedures for key facilities and their critical components necessary for system restoration. It includes columns for test number, critical component, test, test frequency, and criteria for successful test.

N-10Reliability Standards of the North American Electric Reliability Corporation 7/5/2010 6 passages
2.Violation Severity Levels: p. p. 60
R 3 S O fo T he Ls he P lan ing t re a re r n , Co d ina Ar bu fro 1 % to t or r ea m u p , f bu les ha 2 5 % he to t t t s n, o se , S O Ls inc is i h he te t w t t a re on s n Co S O P lan ing d ina 's L to n or r M ho do log ( R ) t 3 e...

AI summary The text discusses the planning and coordination of transmission and distribution systems, referencing System Operating Limits (SOLs) and Interconnection Reliability Operating Limits (IROLS). It mentions percentages related to planning and coordination, possibly indicating compliance or performance metrics.

Example 4 – Transaction not curtailed, next-hour Energy Profile is lower p. pp. 164-165
Example 4 – Transaction not curtailed, next-hour Energy Profile is lower Energy Profile: Current hour 40 MW Actual flow following curtailment: Current hour 40 MW (no curtailment) Energy Profile: Next hour 20 MW

AI summary This example illustrates a scenario where a transaction is not curtailed, and the next-hour energy profile is lower than the current hour. The current hour's energy profile is 40 MW, and the next hour's energy profile is 20 MW, with no curtailment occurring during the current hour.

Version History p. p. 171
Version History Version Date Action Change Tracking 0 April 1, 2005 Effective Date New 0a October 23, 2008 Added Appendix 1 – Interpretation of TPL 002-0 Requirements R1.3.2 and R1.3.12 and TPL-003-0 Requirements R1.3.2 and R1.3.12 for Ame...

AI summary The text provides a version history of a document, including dates, actions, and changes made to the document. It also includes a table outlining different categories of contingencies, system limits, and impacts, such as loss of demand, curtailed firm transfers, and cascading outages.

2.Violation Severity Levels p. pp. 55-117
br>ha ho d in t t t n se u se lan ing f o ion fo he t t p n o p er a s r d ie d im io d fo tu t s e p er r m or e ha f a l l A T C Pa hs t 1 0 % t n o o r , F low 2 A T C Pa h te t g a s o r or F low ( h ic he is ), te te g a ve r g re a r...

AI summary The text outlines different violation severity levels, referencing percentages and categories such as 'Low 1', 'Low 2', and 'Low 3', along with terms like 'ATC Path', 'Transmission Service', and 'AF Cingion'. The content appears to be structured around categorizing violations and their associated impacts, though the specific context or regulatory framework is not clearly defined.

Matrix of Violation Risk Factors for Approval p. p. 131
Matrix of Violation Risk Factors for Approval Standard Number Requirement Text of Requirement Violation factors that could impact the relationship of vegetation to the Transmission Owner's transmission lines.

AI summary The text presents a matrix outlining factors that could impact the relationship between vegetation and transmission lines, focusing on potential violation risk factors for approval.

Matrix of Violation Severity Levels for Approval p. p. 131
Matrix of Violation Severity Levels for Approval Standard Number Requirement Number Text of Requirement Lower VSL Moderate VSL High VSL Severe VSL FAC-001-0 R2. The Transmission Owner's facility connection requirements shall address, but a...

AI summary The document presents a matrix outlining violation severity levels (VSL) for facility connection requirements under standard FAC-001-0, R2. It categorizes the number of unaddressed sub-components (R2.1.1 to R2.1.16) into lower, moderate, high, and severe VSL levels.

07810Quarterly Application for Approval of Reliability Standards of the North American Electric Reliability Corporation - September 2, 2011 9/6/2011 4 passages
2.Violation Severity Levels p. pp. 55-89
to ter t ca r y s a p re de in d he du le ter m e sc he iss io Op T Tr to an sm n er a r bm i d he ie d io t te t to t su re e re s ra n v w la f irm io f n ha t p n or c on a n o o c ng e ha 0 d le ha l 6 t t m or e n an ss n or eq ua 9 0...

AI summary The text appears to be a fragmented or corrupted section of a document discussing violation severity levels in the context of the Bulk Electric System (BES), Reliability Coordinator (RC), Transmission Operator (TO), and Reliability Coordinator (RRO). The content is not clearly legible or coherent.

1 See 18 CFR 37.6(b)(1) p. p. 165
1 See 18 CFR 37.6(b)(1) Continent-wide Term Acronym BOT Approved Date FERC Approved Date Definition Cascading Outages [Archive] 11/1/2006 Withdrawn 2/12/2008 FERC Remanded 12/27/2007 The uncontrolled successive loss of Bulk Electric System...

AI summary The document defines key terms related to cascading outages and clock hours in the context of the Bulk Electric System. Cascading outages refer to uncontrolled successive losses of facilities triggered by an incident, while clock hours are 60-minute periods ending at :00, used for surveys and reports.

Matrix of Violation Risk Factors for Information p. p. 28
Matrix of Violation Risk Factors for Information S d d Nu b ta n a r m e r Re ire t q m e n u Nu b m e r Te f Re ire t o t q m e n x u V io la io R is k t n Fa to c r MOD-001-1a R4.3. Each Transmission Operator associated with the Transmis...

AI summary The document presents a matrix outlining violation risk factors for information, focusing on MOD-001-1a under R4.3, which involves transmission operators associated with the Transmission Service Provider's area. The status is marked as 'Pending'.

& lt;sup>4 The voltage schedule is a target voltage to be maintained within a tolerance band during a specified period. p. p. 28
& lt;sup>4 The voltage schedule is a target voltage to be maintained within a tolerance band during a specified period. Standard Number Requirement Number Text of Requirement Lower VSL Moderate VSL High VSL Severe VSL VAR-001-2 R9. Each Tr...

AI summary The text defines a voltage schedule as a target voltage to be maintained within a tolerance band during a specified period. It outlines requirements for Transmission Operators to maintain reactive resources under first Contingency conditions, with varying levels of compliance based on the percentage of reactive resources maintained.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →