Topic/Matter Intersection

Topic:"Distribution Planning" in M03508

Matter: CI# 38857 - P-128.10 - NSPI WO - L7004 Deteriorated Replacements - $2,467,028
2 passages 2 documents

Distribution Planning across all matters →

N-1Redacted Work Order 9/8/2010 1 passage
6 p. p. 1
6 Account Total ($) ment m Co X arms all cracked on right side replace 6-12 Aircraft # faded out replace ant activity in right pole (Low Conductor) left pole sounds ho9llow on one side str to be replaced in 2010 (Low Conductor) str to be r...

AI summary The text presents a table containing details about infrastructure maintenance, including account information, ground clearance measurements, inspection dates, and structural numbers. It outlines various maintenance actions required for different structures, such as replacing cracked arms, insulators, and addressing conductor issues.

N-2Redacted Responses to Information Requests 1 passage
1 Rows Processed p. p. 0
1 Rows Processed # of Units Unit cost Total L7004 02-72-5208 NUMBERS AIRCRAFT IDENTIFICATION # 8 WOOD POLE 4 18.25 .00 L7004 02-72-)209 NUMBERS AIRCRAFT IDENTIFICATION # 9 WOOD POLE 2 18.19 .00 L7004 50-08-2120 BOLT EYE BALL LINK GALVANIZE...

AI summary The text presents a table of items processed, including quantities, unit costs, and totals for various hardware components used in utility infrastructure, such as bolts, eye ball links, and lag bolts, with references to standards and specifications.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →