Matter: CI# 38724 - P-128.10 - NSPI WO - TRE 5 Superheater, Reheater and Boiler Upgrades - $796,383
3 passages 1 document

Distribution Planning across all matters →

N-1Redacted Work Order 3 passages
TRE5 - Superheater, Reheater, and Boiler Upgrades p. p. 9
TRE5 - Superheater, Reheater, and Boiler Upgrades 2010 Complete E Boiler Upgrade • • • • - • - -

AI summary The text presents a table titled 'TRE5 - Superheater, Reheater, and Boiler Upgrades' with a row labeled '2010' and several columns, but no further details or explanations are provided in the content.

During the June, 2006 shutdown, the boiler was inspected internally to determine the condition and assessment. Sections of the boiler were repaired to ensure the Unit's integrity could be maintained. p. p. 12
During the June, 2006 shutdown, the boiler was inspected internally to determine the condition and assessment. Sections of the boiler were repaired to ensure the Unit's integrity could be maintained. Alst om ur der the Supervision of Mr. c...

AI summary During the June 2006 shutdown, internal inspection of the boiler was conducted to assess its condition, and repairs were carried out to maintain the unit's integrity. Alstom, under the supervision of Mr., carried out repairs, and other personnel performed NDT and quality assurance tasks.

Preamble p. p. 12
The South Waterwall was inspected from Blev. 60' - 104' as well as at the IR's. There was no mechanical work required. Results of this Section are found in Tab # 2 and 3. The East Waterwall was surveyed from 2' below the IR's, centerline o...

AI summary The document outlines inspections and repairs conducted on the South, East, and West Waterwalls, including radiography results and repairs made due to existing weld overlays. Tabs 2 through 7 of the attached NDE report contain detailed results.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →