Topic:"Distribution Planning" in M03626

Matter: CI# 38943 - P-128.10 - NSPI WO - LIN1 Boiler Refurbishment - $1,653,592
2 passages 1 document

Distribution Planning across all matters →

N-1Redacted Work Order 2 passages
Introduction p. p. 13
Introduction During the May/June, 2010 shutdown, the boiler was inspected internally to determine the condition and assessment. Sections of the boiler were repaired to ensure the Unit's- integrity could be maintained.

AI summary During the May/June 2010 shutdown, the boiler was internally inspected to assess its condition, and repairs were made to ensure the unit's integrity.

Alstom under the Supervision of carried out the Non-Destructive Testing. Alstom p. p. 13
Alstom under the Supervision of carried out the Non-Destructive Testing. Alstom under the Supervision of carried out the repairs. carried out functions as the Safety Officer. carried out quality Assurance functions. Lower Furnace

AI summary The document discusses the involvement of Alstom in carrying out Non-Destructive Testing and repairs under the supervision of an unnamed entity. It also notes the roles of individuals as Safety Officers and those carrying out quality assurance functions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →