B-1Proposed Tariffs - Amended March 2, 2011 2/28/2011 1 passage
Table A - In-Service projects $ 33,462 (Actual) Table B - Proposed Projects with PPAs $ 70,209 (Estimated) Table C - Proposed Projects without PPAs $ 107,464 (Estimated)
Table A - In-Service projects $ 33,462 (Actual) Table B - Proposed Projects with PPAs $ 70,209 (Estimated) Table C - Proposed Projects without PPAs $ 107,464 (Estimated) Ta b le A In- Se ice rv p - j ts ro ec Len gth of line Con ting at ne...

AI summary The document presents three tables detailing the costs of various projects related to distribution and infrastructure. Table A lists in-service projects with an actual cost of $33,462, while Tables B and C outline proposed projects with and without PPAs, respectively, with estimated costs of $70,209 and $107,464.

B-3-(ii)Antigonish 8 MW - Biomass Cogeneration Plant - Feasibility Study Final Report - Revised - March 15, 2011 I 3/17/2011 1 passage
Table 3 Monthly Steam Production p. p. 16
Table 3 Monthly Steam Production MONTHLY STEAM PRODUCTION LB X 106 14.250 January February 14.881 March 15.679 April 11.287 May 8.272 June 4.596 July 1.982 August 2.478 September 3.913 October 8.905 November 11.750 December 14.609 Average...

AI summary Table 3 presents monthly steam production data in pounds (x10^6) for each month of the year, with an average hourly production of 12,943 pph. Figure 7 refers to peak steam loading, though no details are provided.

B-11Evidence of Alliance of Nova Scotia Sawmillers 3/22/2011 2 passages
(condensing / extracting facility) p. pp. 78-87
(condensing / extracting facility) PRELIMINARY DESIGN BASIS ESI PROJECT NUMBER -688002 Revision C Description Marwood Revised By JSP Checked by TJB Revision Date 3/7/11 LOCATION Nova Scotia ELEVATION Plant 200 ENVIRONMENTAL Governing Code...

AI summary The text provides preliminary design basis information for a facility in Nova Scotia, including project details, environmental conditions, fuel data, and availability parameters. Key data includes seismic zone, wind pressure, temperature ranges, and biomass fuel analysis.

Executive Summary Page II-1 p. p. 99
Executive Summary Page II-1 PRELIMINARY DESIGN BASIS Chlorine % 0.02 Heating Value Btu/lb 100 8600.0 BARK - COMPOSITE ANALYSIS moisture content (design) 50.0 % Density (conveying) 15.0 lb/ft3 - wet Density (storage) 20.0 lb/ft3 - wet Densi...

AI summary The document provides a preliminary design basis for a project involving chlorine content, heating value, and various density and ash system parameters. It includes details on ash production, fly ash percentages, mechanical collector removal rates, and disposal methods, focusing on design specifications and operational metrics.

B-15Outline of Significant Differences Between the Synapse Model and ANSS Model 3/31/2011 1 passage
Scenarios in $2012
Scenarios in $2012 Scenarios in $2012 Value for Steam-Only Shared Value Steam Gross Value for CHP Net Value for CHP 11 BURNER FIRING SYSTEMS $85,000 $0 $85,000 12 FANS $84,441 $45,600 $130,041 13 EMISSIONS CONTROL SYSTEMS $578,000 $180,000...

AI summary The document presents a table outlining various scenarios in 2012 with different values for steam-only, shared value steam, gross value for CHP, and net value for CHP across multiple systems and components.

B-20Undertaking U-10 - Recommended ANSS Rate for Biomass CHP 4/6/2011 1 passage
Nova Scotia COMFIT Model
Nova Scotia COMFIT Model O tin Ye pe ra g ar Ca le nd Y ar ea r 0 20 10 1 20 11 2 20 12 3 20 13 4 20 14 Ta De iat io pr ec n x Ca len da r Y r D cia tio r C las sif ica ea ep re n pe 30 % D ble D lin ing ou ec tio (% ) n 30 .00 % 21 .00 %...

AI summary The document presents a table showing the Nova Scotia COMFIT Model with various percentages and financial figures over several years, indicating changes in different categories such as 30% and 50% double declining balancing, 20-year and 40-year straight line, and other categories. Financial allocations are also listed for these categories.

07604Compliance Filing 8/2/2011 1 passage
Page 2 Large Wind 8-2-11 no tax
Page 2 Large Wind 8-2-11 no tax Nov a S ia C OM FIT Mo del cot Ca sh Flo w W ork she Bot et: tom Syn e C aps lian om p ce Lar Win ge d n o ta x Occurrence 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6

AI summary The table on page 2 of the document, titled 'Large Wind 8-2-11 no tax,' appears to outline financial or project-related data, though the exact context and meaning of the columns and rows are not clearly explained in the provided text.

U-8 - Synapse Model Using Neal Livingston's Assumptions - Pynn Letter and Payback in 10 years06756 4/14/2011 1 passage
Nova Scotia COMFIT Model Large Wind (Over 50 kW) Synapse U-8
Fed eral (19, ) 995 28,4 16 (47, ) 674 (86, ) 581 (106 ) ,972 (118 ) ,188 (124 ) ,906 (129 ) ,470 (133 ) ,062 (136 ) ,280 (139 ) ,028 (138 ) ,903 (138 ) ,700 (138 ) ,454 (138 ) ,185 (137 ) ,902 (137 ) ,608 (137 ) ,306 (136 ) ,997 (136 ) ,6...

AI summary The text contains a series of numerical values, likely representing data points or measurements related to the Nova Scotia COMFIT Model for Large Wind (Over 50 kW) Synapse U-8. The values are presented in a table format with a heading indicating the context of the data.

U-10 - Recommended ANSS Rate for Biomass CHP06694 4/6/2011 2 passages
Nova Scotia COMFIT Model
Nova Scotia COMFIT Model O tin Ye pe ra g ar Ca le nd Y ar ea r 0 20 10 1 20 11 2 20 12 3 20 13 4 20 14 An al De iat ion nu pr ec 17 ,03 9, 12 5 83 0, 40 5 83 0, 40 5 83 0, 40 5 83 0, 40 5 M ajo r M ai nt en an ce Ti ing f S nd ing m o pe...

AI summary The text presents a table related to the Nova Scotia COMFIT Model, showing data on anomalies, maintenance timing, and expense details for different years, including percentages and monetary values.

Scenarios in $2012
Scenarios in $2012 r S On Va lue fo ly tea m- Sh e S d V alu tea are m Gr CH s V alu e f P os or CH Ne t V alu e f P or S I T E W O R K 1 $ 3 0, 8 6 1 $ 0 $ 3 0, 8 6 1 $ 0 $ 0 $ 3 0, 8 6 1 2 C O N C R E T E A N D F O U N D A T I O N S $ 4...

AI summary The text presents a table of scenarios from 2012 with various financial values and categories, including items such as 'Site Work 1', 'Concreted and Foundational', 'GS S3 PLUMBING & ITEEWER', 'MASONRY', and 'SOS, GG, C.5 TELE, PLAT FRM RATINET'. The table includes values for different categories and subcategories.

U-14 - Success Rate of the RFP Projects (NSPI) - Mr. Chernick Identified Which Failed and Which Were Completed by NSPI06742 4/13/2011 1 passage
Table 1: Projects Reported Publically
Table 1: Projects Reported Publically D lo ev e p er Pr j Lo io t t o ec ca n R F P d R ou n V l ta o g e M W S ta tu s N S P I I S D Fo t re ca s bn ic in in d Pu Po W Fa In t o rm c bn ic Pu o 2 0 0 2 T 3 0. 6 Se ic In rv e C Br Po / to...

AI summary Table 1 presents a list of publicly reported projects, including details such as project names, locations, years, voltage levels, capacities, statuses, and associated entities. The table appears to be part of a regulatory proceeding document.

11962COMFIT Directive Attachment 3/21/2013 1 passage
Active COMFI T Related Distribution P ojects - Ja n
Active COMFI T Related Distribution P ojects - Ja nuary 2 9, 2013 1 1 80 81 307 295 8/2/2011 8/8/2011 Kings Digby 63V-313 12V-302 63V 12V Kingston Lequille Wind Tidal 4 1.95 - - - SIS Agrmnt Complete SIS Agrmnt Complete 82 310 8/8/2011 Cap...

AI summary The table lists various projects related to distribution and renewable energy in Nova Scotia, including locations, dates, and statuses such as 'SIS Agrmnt Complete'. It includes details on wind and tidal energy projects, along with associated numbers and locations.

20110404-1Hearing Transcript — 4/4/2011 (Synapse) 1 passage
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. VOGEL : I'll try and be brief.
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS MR. VOGEL : I'll try and be brief. 1 NSUARB-BRD-E-R.10 Page 285 THE CHAIR: No, I didn't mean to hurry 17 MR. VOGEL: Could differential 18 conditions in distribution zone capacity and availabi...

AI summary The discussion involves Mr. Vogel asking whether differential conditions in distribution zone capacity affect the success of the COMFIT policy. Mr. Keith responds that the question is outside the scope of their ratemaking directive. Mr. Vogel also references a Board decision denying NSPI a 20 megawatt cap on distribution zones and asks if this impacts the perceived risk and financing of COMFIT projects.

20110405-1Hearing Transcript — 4/5/2011 (Synapse Panel, ANSS Panel) 2 passages
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS You know, I'm a fisherman. You want
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS You know, I'm a fisherman. You want 1 NSUARB-BRD-E-R.10 Page 301 to find good bait, you want to cast it out there and get 2 people to nibble on it and then that sort of thing. 3 And I guess d...

AI summary The discussion revolves around the lack of analysis regarding available capacity in the distribution system and its potential impact on setting a COMFIT, which is likened to a capacity factor. The speaker suggests that this could be a limiting factor in the process.

- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS of our group, and that's it. So I mean, if those guys
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS of our group, and that's it. So I mean, if those guys 1 if the other guys below can find those economies in that 2 scale, then, you know, more power to them from that 3 perspective. But that'...

AI summary The discussion focuses on the evaluation of potential economies of scale in projects, with a reference to a specific rate of $339 per megawatt hour and the feasibility of developing CHP projects at that rate. The conversation also touches on distribution interconnection limitations, such as a six megawatt range.

20110406-1Hearing Transcript — 4/6/2011 (ANSS Panel, St. Francis Xavier Univ, Consumer Adv. Panel) 1 passage
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS that to my knowledge, at least, all the previous wind
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS that to my knowledge, at least, all the previous wind 1 NSUARB-BRD-E-R.10 Page 861 project CEDIFs haven't returned haven't made dividends 7 project, but you have to I haven't researched the l...

AI summary The text discusses a discussion around municipal investments in energy projects, specifically CEDIFs, and the potential for property tax relief and donations. Concerns are raised about the legal limitations on municipal investments and the applicability of mechanisms used in the United States to Nova Scotia.

20110407-1Hearing Transcript — 4/7/2011 (Consumer Adv. Panel, Cdn. Wind Energy Panel, EAC - T. Couture) 1 passage
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS be clear. Six percent is debt, 11 percent is equity on
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS be clear. Six percent is debt, 11 percent is equity on 1 small wind, large wind and hydro; on biomass and tidal, 2 distinction is not between in-stream and developmental. I 3 believe they all...

AI summary The discussion centers on the distinction between in-stream and developmental renewable energy projects, specifically small wind, large wind, hydro, biomass, and tidal. The COMFIT (Community Feed-in Tariff) is described as being limited to distribution-level projects, while developmental projects can be larger and connect to the transmission system. The conversation also touches on capacity factors and data sources for energy output forecasts.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →