Topic/Matter Intersection

Topic:"Distribution Planning" in M03669

Matter: E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012A request by Efficiency Nova Scotia for approval of a $43.7 million Demand Side Management plan for the 2012 operating year.  (Also see Matter Nos. M04538 and M04539)
14 passages 4 documents

Distribution Planning across all matters →

E-22010 DSM Evaluation Reports - Final Report - February 28, 2011 2/28/2011 8 passages
Section 1534
Table 3-4: Percent Flow versus Percent Full Load Power Percent Full Load Power (%) Inlet Guide Discharge Percent Flow (%) No Control Vanes Damper VFD 100 100 109 111 105 95 100 100 109 86 90 100 93 107 73 85 100 86 106 64 80 100 82 104 57...

AI summary The table presents data on the relationship between percent flow and percent full load power for different control methods, including inlet guide vanes, discharge dampers, and variable frequency drives (VFD). It shows how each method affects power consumption at varying flow percentages.

Section 1780
s shut off for 1,512 hours during the winter. Free cooling operation is a weather variable and will shut off the condensing unit when outside air temperatures drop below the temperature in the cooler. 5.0 On-Site Methodology The evaporator...

AI summary The document outlines the on-site methodology used to assess cooler systems in Truro and Dartmouth stores. It describes observations of equipment, data collection, and interviews with store managers regarding new installations and baseline operations. Managers reported no issues with the new equipment but had limited knowledge of baseline operations.

Section 1781
t but were not completely sure. They had no knowledge of baseline condensate heater operation. They have seen the outside air dampers open to provide free cooling but are not sure how often they work. 6.0 On-site Observations and Findings...

AI summary The on-site observations found that nameplate data matched tracking values for evaporator fans, condensing units, and door heaters. Cooler temperatures were satisfied during the visit, so outside air supply fans and compressors were not operating. Anti-condensate heaters were not on, and evaporator fans were off in most locations, with no indication of override or future shutdown issues.

Section 1889
Table 5: Summary of verified and M&V fixture counts for inspected intersections 12" Bi- 12" 12" PED 12" 12" 12" 8" 8" PED modal Yellow Green Count- Red Yellow Green Yellow Green Walk Arrow Arrow Arrow down Verified Counts Intersection 1 9...

AI summary The text presents a table summarizing verified and M&V fixture counts for various intersections, including details on traffic signals and pedestrian features. It provides quantitative data on the number of fixtures across different categories at each intersection.

Section 1894
In the M&V analysis, it was assumed that circular traffic signals were green for roughly 50% of the time in any direction and left turn arrows were green for 30% of the time. In order to illustrate why this is a problem, consider the persp...

AI summary The M&V analysis overestimated the time traffic signals were green and underestimated the time they were red at intersections with protected left turns. New operating fractions were devised to address these issues, distinguishing between protected and permissive intersections.

Section 1895
5% of the time; drivers traveling in the other two directions are moving the other 49.5% of the time. During the remaining 1% of a given cycle, all lights are red. Within the 49.5% of the time that drivers traveling in either direction A o...

AI summary The text discusses the distribution of traffic light cycles, with 50% of the time allocated to one direction of traffic, 49.5% to the opposite direction, and 1% where all lights are red. The lighting cycle is further divided into three combinations during the 49.5% period when traffic moves in directions A or B.

Section 1899
NMR Evaluation of 2010 C&I Custom Program Page A86 Table 6: Summary of evaluation analysis operating factors Protected Left Permissive Left Signal Type Operating Factor Operating Factor Green Traffic Signal 31.000% 47.500% Yellow Traffic S...

AI summary The text presents a table summarizing the evaluation analysis of operating factors for different traffic signal types and pedestrian indicators, including percentages for protected left and permissive left scenarios.

Section 2045
Table 3-22: Business Type 2008 2009 2010 Sample size 50 50 65 Service 14% 24% 31%ϐ Retail – other than mall 18 18 17 Office 10 12 9 Food service/Grocery 2 8 8 ϐ Warehouse and storage 14 5 ϐ Health care – inpatient 5 Curling Rink / Bowling...

AI summary The text presents a table showing the distribution of business types across different years, with varying percentages and counts for each category. It includes data from 2008 to 2010, highlighting changes in the number of businesses in sectors such as service, retail, office, and manufacturing.

E-6ENSC (EAC) IR-1 to IR-43 (Revised April 6, 2011) 3/29/2011 3 passages
8.7 Treatment Group Near 20th Percentile Cutoff p. pp. 77-78
8.7 Treatment Group Near 20th Percentile Cutoff

AI summary This section discusses the treatment group near the 20th percentile cutoff, accompanied by a figure labeled 'Figure 2' from page 78. The content appears to be related to statistical or analytical treatment of data, likely in the context of a regulatory proceeding.

Section 207 p. pp. 140-143
++ Proprietary segment groups created by Positive Energy based on house characteristics \ significance at the 90% level \ \ significance at the 95% level \ \ \ significance at the 99% level

AI summary The text includes proprietary segment groups created by Positive Energy based on house characteristics, along with statistical significance indicators and references to figures on pages 142 and 143.

Market-driven measures p. p. 238
Market-driven measures - planned equipment replacement - new construction - renovation - expansion - equipment replacement on burn-out

AI summary The text outlines various market-driven measures including planned equipment replacement, new construction, renovation, expansion, and equipment replacement due to burn-out.

E-7ENSC (Multeese) IR-1 to IR-31 3/29/2011 2 passages
Section 309 p. p. 83
500,000 tonnes /y \ 1/.97 = 515,464 ADMT/d of pulp on average A constant paper production basis to compare the before and after situation. Based on preliminary discussions with NPPH, the following approximation for pulp production per TMP...

AI summary The text discusses pulp production calculations, specifically 500,000 tonnes per year adjusted to 515,464 ADMT/d of pulp on average. It mentions preliminary discussions with NPPH regarding pulp production per TMP line.

Mainline refiner demand and consumption: p. p. 83
Mainline refiner demand and consumption: Before the After the After the Reduction project project project (3 lines (3 lines (Lines 1 & 3 running) running) running) Mainline Refiner 144.1 155.4 112.5 Demand (MW) Average load 131.9 123.4 8.5...

AI summary The table shows changes in mainline refiner demand and consumption before and after a project, with reductions noted in both demand and consumption. The second section discusses line 3 optimization, focusing on freeness increase, production increase, and specific energy reduction.

E-19Proof of Advertising 4/18/2011 1 passage
Bernanke strikes Halifax Water planning pilot project to generate electricity p. p. 6
l of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the contr...

AI summary Halifax Water is planning a pilot project to generate electricity by installing turbines in pressure reducing valve chambers. The project aims to capture energy from water flowing downhill, with the Chain Control site identified as having significant potential to generate power for 80 homes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →