N-1-aAppendix F - Load Forecast Report (Large File - 16 MB) 2 passages
16 Total Coincident Firm Peak
16 Total Coincident Firm Peak 17 18 Total Coincident Firm Peak is the demand at the time ofNSPI's system peak that is attributable 19 to all firm classes (e.g.: residential, small general, etc), but excluding the non-firm customer 20 class...

AI summary The text defines and distinguishes between 'Total Coincident Firm Peak' and 'Total Non-coincident Firm Peak' for Nova Scotia Power Inc. (NSPI). While non-coincident peak refers to the highest demand for combined firm classes regardless of timing, NSPI typically uses the coincident firm peak as a representative proxy for planning purposes. This is because coincident peak data is more readily available monthly, whereas non-coincident peak requires complex hourly load shape analysis. Statistics suggest these peaks are often similar during winter due to cold-weather demand drivers.

1 Industrial Model Input Variables and Contributions
1 Industrial Model Input Variables and Contributions 2 3 Year RQTOS RQTOS contrib GWh MIGRATE MIGRATE contrib GWh SM_Indt·11 SM_Indt·11 contrib GWh SM_Ind\ GWh GWh Actual Growth % 1994 17,535 163.2 1 -28.7 517.8 385.3 519.7 528.3 2.0 1995...

AI summary The document presents a historical analysis of industrial model input variables and their contributions to the Net System Requirement (NSR) in Gigawatt-hours (GWh) from 1994 to 2015. Key variables discussed include Real Quarters to Sales (RQTOS), MIGRATE, and Small and Medium Industrial (SM_Ind) metrics. The data tracks the growth and contribution of these factors to the total GWh, providing a basis for the 2006 Nova Scotia Power Inc. (NSPI) energy requirement forecast.

N-2-aRIRs 40 to 69 - NSUARB to NSPI - REDACTED (Large File - 34 MB) 1 passage
Response IR-47: (cont'd)
Response IR-47: (cont'd) Coincident Losses (MW) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Residential 156.7 130.9 92.0 75.1 71.8 42.0 45.0 37.7 55.1 77.4 102.4 165.3 ETS 3.1 2.5 1.6 1.5 0.8 0.6 0.6 0.3 0.8 0.9 1.6 2.9 Small General 8...

AI summary The document provides a detailed breakdown of monthly coincident losses (in MW) across various electricity customer classes, including Residential, ETS, Small General, Demand, Lg. General, Unmetered, Small, Industrial (Medium and Lg. Ind. Firm), Interrupt., Mersey, GRLF, Municipal, and ELIIR. It explains the methodology for calculating the monthly system peak, which is the sum of peak coincident class sales (derived from monthly sales and coincident load factor) and coincident hourly losses.

N-41RIR 1 Dr. Alan Rosenberg to NSUARB -REDACTED (Large File - 10 MB) 1 passage
NOVA SCOTIA POWER INC. ALLOCATION OF RATE BASE FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
NOVA SCOTIA POWER INC. ALLOCATION OF RATE BASE FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (B) LARGE INDUS...

AI summary This document presents the allocation of Nova Scotia Power Inc.'s rate base for the year ending December 31, 2007, across various categories and classifications, including transmission, energy, and distribution plant, as well as other financial components.

57968Amended Board Order (and attached Schedules A to C) 1 passage
7.2.6 Review of Plans and Specifications
7.2.6 Review of Plans and Specifications The Inspection Authority may, prior to issuing a permit, request the submission of plans and specifications for any proposed electrical installation. Plans shall be submitted for all commercial, ind...

AI summary The Inspection Authority has the authority to request plans and specifications for electrical installations before issuing permits, specifically for commercial, industrial, and institutional installations exceeding 250 volts or 250 amperes.

57968Amended Board Order (and attached Schedules A to C) 1 passage
7.2.6 Review of Plans and Specifications
7.2.6 Review of Plans and Specifications The Inspection Authority may, prior to issuing a permit, request the submission of plans and specifications for any proposed electrical installation. Plans shall be submitted for all commercial, ind...

AI summary The Inspection Authority has the authority to request plans and specifications for electrical installations before issuing permits, specifically for commercial, industrial, and institutional installations exceeding 250 volts or 250 amperes.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 3 passages
CLASSIFICATION OF OPERATING EXPENSES
CLASSIFICATION OF OPERATING EXPENSES (4) (3) ENERGY CUSTOMER EXPENSES EXPENSES (2) DEMAND EXPENSES (1) TOTAL COMPANY DISTRIBUTION FUNCTION $0 $0 $1,156 $1 ,156 ( 1) SUBSTATIONS 0 10,671 19,817 30,488 ( 2) OVERHEAD LINES 0 293 543 836 ( 3)...

AI summary The document presents a detailed breakdown of operating expenses categorized under Energy Customer Expenses, Demand Expenses, and Total Company, including distribution and retail functions, depreciation, and non-operating revenue. It includes line items such as substation costs, overhead lines, and corporate taxes, as well as depreciation and other financial metrics.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - ( 1) The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its custom...

AI summary The Company reserves the right to establish separate service agreements when necessary for the benefit of the Company and its customers. Customers are required to ensure their load does not compromise the integrity of the power supply system. Specific conditions related to reliability, voltage, and transformer losses are outlined.

7.2.6 Review of Plans and Specifications
7.2.6 Review of Plans and Specifications The Inspection Authority may, prior to issuing a permit, request the submission of plans and specifications for any proposed electrical installation. Plans shall be submitted for all commercial, ind...

AI summary The Inspection Authority has the authority to request plans and specifications for electrical installations before issuing a permit, specifically for commercial, industrial, and institutional installations exceeding 250 volts or 250 amperes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →