1 Request IR-1:
p. p. 12
NON-CONFIDENTIAL 1 Request IR-1: 7 • 405 shields replaced on SH-1 Upper and Lower Omegas. 8 • New shield clips installed with improved weld positioning. 9 • 10 percent of welds inspected via Liquid Penetrant Inspection (LPI). 10 • Internal...
AI summary The document outlines various maintenance and refurbishment activities conducted on boiler systems, including shield replacements, weld inspections, tube replacements, and pressure testing, as part of ongoing maintenance efforts in 2023 and 2024.