Topic/Matter Intersection

Topic:"Distribution Planning" in M12451

Matter: Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
590 passages 37 documents

Distribution Planning across all matters →

N-52026-2027 GRA Appendix 1-6 - Redacted 1 passage
2026-2027 GRA Direct Evidence Appendix 6B (Redline) Page 16 of 35 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 201
2026-2027 GRA Direct Evidence Appendix 6B (Redline) Page 16 of 35 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - Standby Emergency Response Services and third party compliance program - Third Party Supervision of Unloading - Transportation...

AI summary The document outlines various costs associated with emergency response services, transportation, compliance programs, and infrastructure maintenance, including GHG emissions compliance, ash hauling, and wharf maintenance.

N-62026-2027 GRA Appendix 7A-E - Redacted 1 passage
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026-2027 GRA Direct Evidence Appendix 7B Page 1 of 2 p. p. 30
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2026-2027 GRA Direct Evidence Appendix 7B Page 1 of 2 2024 Compliance 2024 Compliance Restated Control Center 9,53 1 (1,954) (1,954 Energy Delivery Services 1, 527 2,8 372 3,14 7 3 77 6,14 2 14,0...

AI summary The table presents compliance data for 2024, including figures related to Energy Delivery Services, Reliability Implementation, Transmission & Distribution Contractor Management, and Customer Service. It includes various line items and totals for different departments and activities, with some entries showing negative values and others showing positive figures.

N-72026-2027 GRA Appendix 8A-G -Depreciation Study - Redacted 107 passages
Section 126
TRANSMISSION PLANT 350.10 LAND RIGHTS - EASEMENTS 80 - R5 0 100,622,597 26,905,421 73,717,175 1,315,316 1.31 56.0 353.00 STATION EQUIPMENT 45 - R2.5 (20) 586,908,962 253,049,476 451,241,279 17,698,610 3.02 25.5 354.00 TOWERS AND FIXTURES 6...

AI summary The text presents a table with various transmission plant items, including land rights, station equipment, towers, poles, overhead conductors, and underground conduit, along with associated costs and percentages. The data includes details such as account numbers, descriptions, and financial figures.

Section 127
357.00 UNDERGROUND CONDUIT 65 - S3 0 1,736,139 611,263 1,124,876 27,127 1.56 41.5 358.00 UNDERGROUND CONDUCTORS AND DEVICES 45 - S3 (10) 7,345,546 853,459 7,226,642 194,359 2.65 37.2 359.00 ROADS, TRAILS AND BRIDGES 60 - S3 0 344,183 110,1...

AI summary The text presents financial data related to underground conduit, underground conductors and devices, and roads, trails, and bridges, including costs and other metrics. It also includes a total for transmission plant and details about distribution plant, specifically land rights and related expenses.

Section 130
T - EV CHARGERS 15 - S3 0 987,094 158,436 828,658 71,330 7.23 11.6 363.20 ENERGY STORAGE EQUIPMENT - DISTRIBUTED SOLAR 25 - S3 0 1,123,202 64,625 1,058,577 48,536 4.32 21.8 363.30 ENERGY STORAGE EQUIPMENT - BATTERIES 10 - S3 0 1,261,438 20...

AI summary The text presents a table with various categories of energy-related equipment and infrastructure, including EV chargers, energy storage equipment, poles, towers, overhead conductors, underground conduit, and underground conductors. It lists quantities, costs, and other metrics for each category.

Section 132
22 - R2.5 (15) 19,074,061 12,890,305 9,044,865 839,953 4.40 10.8 373.10 STREET LIGHTING AND SIGNAL SYSTEMS - LED 20 - S2 (15) 38,107,176 15,677,772 28,145,481 3,257,809 8.55 8.6 TOTAL DISTRIBUTION PLANT 2,137,686,386 1,107,501,816 1,633,76...

AI summary The document presents financial and operational data related to distribution plant and street lighting and signal systems, including figures for costs, revenues, and other metrics. The data includes total distribution plant costs and specific line items such as LED street lighting and signal systems.

Section 605
29 2023 2,652,639.99 31,513 29,095 3,154,073 50.01 63,069 241,849,833.30 87,448,851 80,739,861 209,479,939 3,964,699 ANNAPOLIS TIDAL INTERIM SURVIVOR CURVE.. IOWA 100-L0.5 PROBABLE RETIREMENT YEAR.. 12-2066 NET SALVAGE PERCENT.. -79

AI summary The text contains numerical data and technical terms related to energy infrastructure, including figures for the year 2023, an interim survivor curve, and details about Annapolis Tidal, including a probable retirement year and net salvage percentage.

Section 823
Table 4-3: Sediment Management Classification by System and Associated Allowance for Sediment Management Cost Sediment % of Pansic Management Allowance for System Sediments Industry Cost Sediment Classification Management Annapolis Silty s...

AI summary The text presents a table categorizing sediment management by system and providing allowances for sediment management costs, with details on sediment types and industry classifications.

Section 859
benchmark up to 820 ft by Length by Length ANNAPOLIS Right Causeway NA access 65.6 1,150 23.6 NA 1,150 20.0 -42 1 unknown unknown NA NA NA 0.0 NA NA NA ANNAPOLIS Left Causeway NA access 58.1 1,706 24.7 NA 1,706 17.7 -33 1 unknown unknown N...

AI summary The text provides data related to infrastructure measurements, including details about causeways and tailponds in Annapolis, with metrics such as length, access points, and other unspecified parameters. The information appears to be part of a technical or engineering assessment.

Section 861
65,000.00 22,065,000.00 27,139,950.00 - 2,287,500 2,813,625.00 24,352,500 29,953,575.00 AVON Card Lake Main Dam Impervious Fill Storage 26 500 481 479.5 70 475 570 7.9 152.4 455 1 2,283,819 1,392,216 1,758,804 42,475 37 1,964,695 363,000 4...

AI summary The text contains numerical data related to various dam structures, including details such as storage capacity, dimensions, and associated costs. It includes information on the Card Lake Main Dam, Card Lake Wing Dam, and Zwicker Lake Dam, with figures related to their construction and maintenance.

Section 863
70,235 24 included above 363,000 446,490 1,031,485 Fill assume left in place and AVON Mockingigh/ Falls Lake Canal unknown Headpond 845 340.7 unknown unknown 845 unknown 341 1 1,545 included above included above Removed as per NSPI "Leave...

AI summary The text presents numerical data related to infrastructure projects, including details about dams, headponds, and associated costs. It references the 'Leave in Place' directive by NSPI and mentions revegetation efforts.

Section 864
8,971,474 4,375,208 4,029,521 7,920 73 included above 3,520,000 4,329,600 7,895,208 assume left in place and AVON MacDonald Pond Power Canal Impervious Fill Headpond 13.1 1,584 193 192 unknown 1,584 4.0 180 1 5,034 included above included...

AI summary The text contains numerical data and project details related to infrastructure, including information about the Avon MacDonald Pond Power Canal and Penstock Unit 1. It includes measurements, costs, and status notes such as 'Removed as per NSPI 'Leave in Place'.'

Section 869
Removed as per NSPI Removed as per NSPI Removed as per NSPI "Leave in Place" "Leave in Place" Removed as per NSPI "Leave in Place" Used BEAR RIVER Ridge Wing Dam 2 Concrete Headpond 10 800 415.5 413 800 3.0 243.8 406 1 "Leave in Place" Use...

AI summary The text appears to contain a table or data entry related to a structure named 'Ridge Wing Dam 2' with details such as material type, location, and dimensions. However, the majority of the content has been redacted or removed.

Section 881
benchmark up to 820 ft by Length by Length Trout River Pond Gaspereau Canal assume left in place and BLACK RIVER Impervious Soil Storage 20 20,200 622.5 622 20,200 6.1 603 1 included above included above Removed as per NSPI "Leave in Place...

AI summary The text outlines details related to a site, including the Trout River Pond Gaspereau Canal, Black River, and Dyke, with information on storage, soil type, and actions taken such as 'left in place' and 'revegetated' as per NSPI guidelines.

Section 882
revegetated Trout River Pond Mid-Pond Dyke & assume left in place and BLACK RIVER Impervious Soil Storage 8 100 620.5 620.5 100 2.4 30.5 613 1 included above included above Removed as per NSPI "Leave in Place" Spillway revegetated BLACK RI...

AI summary The text presents details related to environmental site assessments and infrastructure projects, including dyke and spillway data for Trout River Pond and Salmontail Lake Main Dam, with notes on revegetation and storage capacities.

Section 883
1,634,669 1,136,003 1,550,378 115,530 31 included above 363,000 446,490 1,499,003 assume left in place and BLACK RIVER Hatchard Lake Dam Impervious Soil Storage 8 470 767.5 767 470 2.4 143.3 760 1 included above included above Removed as p...

AI summary The text presents numerical data related to environmental and infrastructure projects, including details on dams, storage capacities, and associated costs. It references the 'Leave in Place' policy by NSPI and mentions revegetation activities.

Section 884
759,395 648,098 1,055,870 75,878 21 included above 363,000 446,490 1,011,098 BLACK RIVER Little River Lake Wing Dam Impervious Soil Headpond 13 700 620.7 620.7 700 4.0 213.4 608 1 570,243 486,668 847,110 75,878 18 included above included a...

AI summary The text presents numerical data related to various dams and their associated metrics, including capacity, storage, and other technical specifications. The data appears to be part of a larger dataset or report, possibly related to infrastructure planning or asset management.

Section 887
34,500 34,500 42,435 NA NA NA 34,500 assume left in place and BLACK RIVER Lunn Dam Impervious Soil Storage 3 168 576.1 576.1 168 0.9 51.2 573 1 NA NA NA Removed as per NSPI "Leave in Place" revegetated BLACK RIVER Dean Chapter Lake Impervi...

AI summary The text provides data on two sites, Black River Lunn Dam and Black River Dean Chapter Lake, including details on storage, soil type, and costs. The Lunn Dam site is marked as 'Removed as per NSPI 'Leave in Place',' while the Dean Chapter Lake site includes figures for costs, quantities, and other metrics.

Section 890
10,500 10,500 12,915 included above included above included above 10,500 assume left in place and BLACK RIVER White Rock Canal Impervious Soil Headpond 30 5,000 142 141.5 5,000 9.1 112 1 95040.4 111,197 23,760 included above included above...

AI summary The text presents numerical data related to infrastructure projects, including details on locations such as Black River and White Rock Canal, along with measurements and costs. It includes information on headponds, penstock units, and revegetation efforts. The data appears to be part of a technical or engineering report.

Section 893
13,454 440,409 included above included above included above 213,454 Freeboard Dyke DICKIE BROOK Tom's Lake Wing Dam #3 Impervious Till Headpond 10 226 307 307 unknown 226 3.0 68.9 297 1 337,263 92,929 182,619 included above included above...

AI summary The text presents numerical data and technical details related to various infrastructure components, such as dams and intake structures, including materials, capacities, and associated costs. The data includes figures related to headponds, storage, and other engineering metrics.

Section 897
ed above included above included above included above Removed as per NSPI "Leave in Place" (none) FALL RIVER Miller Lake Dam unknown Headpond 15.7 209 161.1 unknown 59 158.6 268 4.8 63.7 145 1 831,994 212,003 338,183 32,990 22 included abo...

AI summary The text includes data related to the Miller Lake Dam and Penstock Unit 1 in Fall River, with various numerical values and terms such as 'included above' and 'Removed as per NSPI 'Leave in Place'.' The information appears to be part of a technical or engineering report, possibly related to infrastructure or regulatory filings.

Section 904
Harmony we only did estimate for Partial HARMONY Harmony Main Dam Impervious Till Headpond 20 615 109.5 107 240.75 856 6.1 90 1 2,503,683 2,503,683 3,079,529 550,278 363,000 446,490 2,503,683 Decommissioning at Powerhouse, no mention on th...

AI summary The text includes data about Harmony Main Dam and McGowan Lake Wing Dam, including details about their structure, location, and associated costs. It also mentions decommissioning at Powerhouse and a lack of mention of the main dam in the 2016 report.

Section 905
460 3.2 99 1 983,153 983,153 1,209,279 included above 363,000 446,490 983,153 Intake remained in place in 2016 HARMONY McGowan Lake Intake Structure unknown Intake 14 107 110 unknown 107 4.3 96 1 304,920 304,920 375,052 included above incl...

AI summary The text contains numerical data related to an intake structure at McGowan Lake, including details such as costs, quantities, and decommissioning reports. It also mentions that the intake remained in place in 2016.

Section 912
1 include above include above include above included above 164,385 included above MERSEY Upper Lake Falls Main Dam Earth Headpond 52 454 285 285 454 15.8 233 1 include above include above include above included above 164,385 included above...

AI summary The text presents data on various structures, including dams and spillways, with details on materials, locations, and measurements. It includes information such as dimensions, capacities, and other technical specifications related to these infrastructure components.

Section 913
1 include above include above include above included above 164,385 included above MERSEY Upper Lake Falls Penstock Unit 1 N include above included above include above included above included above included above MERSEY Upper Lake Falls Pen...

AI summary The text presents a table containing data related to infrastructure, including details about penstock units and dams, with information such as material, location, and numerical values. The data appears to be part of a larger regulatory or technical report.

Section 918
1 include above included above include above included above 164,385 included above Big Falls Embankment No. 4 (Right MERSEY Earth Headpond 23 458 188 186 458 7.0 165 1 include above included above include above included above 164,385 inclu...

AI summary The text contains data related to infrastructure elements such as the Big Falls Embankment No. 4, Big Falls Bulkhead Dam, and Big Falls Spillway, with details on their locations, materials, and measurements.

Section 920
include above included above include above included above included above MERSEY Lower Great Brook Spillway Left unknown Headpond 4 291 125.92 unknown 291 582 1.2 122 1 9,485,970 9,485,970 11,667,743 included above 164,385 1,750,290 9,650,3...

AI summary The text includes a table with data related to a spillway and headpond, followed by a redacted section and a page reference from the 2026-2027 GRA Direct Evidence Appendix 8B. The content appears to be part of a regulatory proceeding, but specific details are confidential.

Section 925
benchmark up to 820 ft by Length by Length MERSEY Lower Great Brook Spillway Right unknown Headpond 4 119 125.1 unknown 119 238 1.2 121 1 include above included above include above included above 164,385 included above MERSEY Lower Great B...

AI summary The text presents a table with data related to various structures along the Lower Great Brook, including spillways, sluiceways, and dams, with details such as material, location, and measurements. The data includes information on length, headpond, and other technical specifications.

Section 926
106 include above included above include above included above 164,385 included above MERSEY Lower Great Brook Right Wing Dam Concrete Headpond 11 365 131 128 365 3.4 120 1 include above included above include above included above 164,385 i...

AI summary The text contains data related to infrastructure components, including a dam and penstock units at the Lower Great Brook site, with details such as material type, location, and capacity, though much of the data is marked as 'include above' or 'included above'.

Section 928
87 2 include above included above include above included above 164,385 included above MERSEY Deep Brook Canal Embankment Dam Impervious Fill Headpond 8 2,570 108 108 2,570 2.4 100 1 include above included above include above 6,940 included...

AI summary The text contains data about several dams, including their locations, materials, and dimensions. It includes details such as the names of the dams, the types of materials used, and various measurements. The data appears to be part of a larger report or table.

Section 930
1 19,537,400 19,537,400 24,031,002 included above 164,385 3,605,130 19,701,785 MERSEY Cowie Falls Spillway unknown Headpond 31 159 49 unknown 141 300 9.4 18 1 include above included above include above included above 164,385 included above...

AI summary The text presents numerical data and structural details related to various components of the Cowie Falls hydroelectric facility, including spillways, sluiceways, and dams, with information on materials, dimensions, and capacities.

Section 936
1 1,786,796 1,045,661 1,398,049 282,920 33 2,355,756 363,000 446,490 1,408,661 NICTAUX Earth/Rockfill Dykes Earthfill Storage 4 100 612 612 unknown 100 1.2 30.5 608 1 Leave in place included above included above included above Removed as p...

AI summary The text presents numerical data and descriptions related to infrastructure projects, including details on materials, storage capacities, and actions such as 'Leave in place' and 'Removed as per NSPI 'Leave in Place'.'

Section 947
1 215,761 88,387 192,572 49,380 11 included above 363,000 446,490 451,387 PARADISE Saunders Pond Dam Impervious Fill Headpond 12 1,800 621 620 212 616 2,012 3.7 548.6 609 2 485,817 1,066,155 1,925,757 45,100 17 included above 363,000 446,4...

AI summary The text contains numerical data and project details related to infrastructure, including dam and penstock information, with values such as costs, capacities, and materials used. It includes names like 'Paradise' and 'Saunders Pond Dam' and mentions materials like 'HDPE' and 'Steel'.

Section 951
1 299,847 299,847 368,811 included above included above included above 299,847 ROSEWAY Intake Structure unknown Headpond 14.8 25 65.9 unknown unknown 25 4.5 51 1 91,827 91,827 112,947 included above included above included above 91,827 ROS...

AI summary The text presents numerical data related to various components of the Roseway facility, including intake structures, powerhouse, and penstock units, with figures such as 91,827 and 255,744. The data includes entries for headpond, capacity, and other unspecified metrics.

Section 954
Impervious Fill assume left in place and SHEET HARBOUR Malay Falls left and right Canal Dykes Headpond 28 1,100 157 316.5 unknown 1,100 8.5 335.3 129 1 5,023 included above included above included above Removed as per NSPI "Leave in Place"...

AI summary The text provides details about infrastructure elements such as dykes, headponds, and penstock units at Sheet Harbour and Malay Falls, including measurements and notes on revegetation and 'Leave in Place' directives from NSPI.

Section 955
included above included above included above revegetated assume left in place and SHEET HARBOUR Malay Falls Penstock Unit 5 N included above included above included above revegetated assume left in place and SHEET HARBOUR Malay Falls Penst...

AI summary The text includes references to locations and infrastructure components such as 'Sheet Harbour' and 'Malay Falls Penstock Unit 5' and '6', with notes about revegetation and assumptions regarding placement.

Section 956
assume left in place and SHEET HARBOUR Malay Falls Penstock Unit 6 N included above included above included above revegetated SHEET HARBOUR Ruth Falls Main and wing dams Concrete Headpond 32.8 775 116 111 415 104 1,190 10.0 236.2 83 1 3,63...

AI summary The text provides technical data on infrastructure projects, including details on the Malay Falls Penstock Unit 6 and the Ruth Falls Main and wing dams, with information on materials, locations, and various metrics such as dimensions and costs.

Section 960
included above included above included above revegetated assume left in place and SHEET HARBOUR Ruth Falls Penstock Unit 3 N included above included above included above revegetated SHEET HARBOUR Marshall Falls Main Dam Concrete Storage 28...

AI summary The text includes details about infrastructure projects, such as the Sheet Harbour Ruth Falls Penstock Unit 3 and Marshall Falls Main Dam, including specifications like material, storage capacity, and other technical data. Some sections are marked as 'included above' and 'revegetated'.

Section 967
benchmark up to 820 ft by Length by Length SISSIBOO Fourth Lake Wing Dam 1 Earthfill Headpond 25 2,000 490 487.5 unknown 2,000 7.6 609.6 465 2 2,111,370 5,148,365 6,623,023 110,544 35 included above 3,520,000 4,329,600 6,067,856 SISSIBOO F...

AI summary The text presents data on three dams at the Siissiboo Fourth Lake Wing, including details such as the type of dam, location, dimensions, and associated costs. The data includes information on earthfill and impervious fill dams, their capacities, and various numerical metrics.

Section 969
assume left in place and SISSIBOO Fourth Lake Musquash Dam Earthfill Headpond 8 350 488 488 unknown 350 2.4 106.7 480 1 110,544 11 included above included above included above Removed as per NSPI "Leave in Place" revegetated assume left in...

AI summary The document text includes details about a dam and penstock unit, with notes on their status such as 'assume left in place and revegetated' and 'Removed as per NSPI "Leave in Place"'. It also includes various numerical and technical data related to the infrastructure.

Section 970
NA NA NA revegetated SISSIBOO Sissiboo Grand Lake Spillway (Rockfill) Timber Corewall Storage 9 380 380.4 384 unknown 380 2.7 115.8 371 1 273,131 126,540 261,085 included above included above included above 126,540 SISSIBOO Sissiboo Grand...

AI summary The text provides data on two spillway structures at Sissiboo Grand Lake, including details on their type, capacity, and associated costs. The information includes storage capacities, costs, and other numerical values related to the structures.

Section 980
bove 32,437 included above included above included above Noted to be left in place, St. MARGARETS Five Mile Lake Wing Dam No. 2 Timber Storage 4 165 445.3 445 165 1.2 441 1 included above included above 32,437 included above included above...

AI summary The document contains data about several dams in St. Margarets, including their locations, materials, storage capacities, and other technical details. The information appears to be part of a larger dataset or report, with notes indicating that certain items are to be left in place.

Section 982
1 2,887,000 2,887,000 3,551,010 22,217 included above 1,800,000 included above 4,687,000 St. MARGARETS Wrights Lake Wing Dam No. 1 unknown Storage 4 20 276.0 unknown 20 1.2 272 1 included above included above 22,217 included above included...

AI summary The text provides details about three storage dams (Wrights Lake Wing Dam No. 1, No. 2, and No. 3) located in St. Margarets, including their capacities, storage levels, and notes that they are to be left in place.

Section 985
St. MARGARETS Mill Lake Dam (Tidewater) Concrete Headpond 20 830 93.5 93.5 830 6.1 74 1 1,823,000 1,823,000 2,242,290 included above 1,100,000 included above 2,923,000 2007 Wootstave to St. MARGARETS Mill Lake Penstock Y 6.0 695.0 bottom i...

AI summary The text presents a table containing details about infrastructure components related to the Mill Lake Dam and Powerhouse in St. Margarets, including measurements, materials, and costs associated with various parts of the project.

Section 991
benchmark up to 820 ft by Length by Length 25,465,000 25,465,000 31,587,000 2,009,386 10,120,734 12,448,503 34,910,000 46,044,888 TUSKET Tusket Main Dam None (Earthfill) Headpond 32 226 30 29 226 9.8 -2 1 3,435,691 3,435,691 4,225,900 33,5...

AI summary The text provides benchmark data and details about the Tusket Main Dam and Tusket Powerhouse Dam, including dimensions, materials, and associated costs. It lists various figures related to the dams' construction and operations.

Section 1010
d intensive ground survey of a study area and may include subjective (targeted) shovel testing, before final recommendations can be made regarding archaeological potential within a defined study area. The archaeological potential models ha...

AI summary This text discusses the development and use of archaeological potential models for hydroelectric systems in Nova Scotia, emphasizing the importance of combining these models with detailed studies and reconnaissance. It also notes that the models from the 2018 Hydro Asset Study were not updated for the 2024 revisit.

Section 1011
evisit of archaeological costings. REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 Direct Evidence Appendix 8C Page 5 of 129 High Archaeological Potential refers to areas where biophysical characteristics (environmental, top...

AI summary The text defines 'High Archaeological Potential' and 'Low Archaeological Potential' based on environmental, topographic, and historic land use factors. It also mentions NSPI asset locations, indicating the relevance of archaeological considerations in the context of infrastructure planning.

Section 1031
tock, Avon 2 Penstock, MacDonald Dam, MacDonald Pond Dam, Falls Lake Dam, Zwicker Lake Dam, Card Lake Main Dam, Card Lake Wing Dam, South Canoe Dam, one pipeline and associated reservoirs. Detailed explanations and associated methodologies...

AI summary The text outlines the Avon Hydro System's infrastructure, including dams, reservoirs, and pipelines, and references a 2018 Hydro Asset Archaeology Study that informs costings for archaeological assessments. Table 3 summarizes the costs for various asset locations, including reconnaissance, shovel testing, excavation, and monitoring.

Section 1032
n 1 Plant and Penstock Avon 2 Pipeline and Penstock Macdonald Pond Drawdown Total System Cost Asset Location: Card Lake Main and Wing Dams Type: Small Dam; Earthfill The results of the 2018 Hydro Asset Archaeology Study indicate that area...

AI summary The text discusses the archaeological assessment requirements for several hydroelectric assets, including Card Lake Main and Wing Dams, Card Lake Reservoir, and Canoe Lake Dam. These locations are identified as having high potential for impacting archaeological resources, necessitating reconnaissance and monitoring prior to asset removal.

Section 1037
(Stewart & Sanders 2006:8). The recommended course of action is archaeological reconnaissance of the lakeshore. The shoreline of MacDonald Pond could not be reconstructed using available data sources. It is estimated that the archaeologica...

AI summary The text discusses the Bear River Hydro System, its location, and associated infrastructure. It outlines the need for an archaeological reconnaissance of MacDonald Pond's lakeshore due to the inability to reconstruct the shoreline using available data sources. The document also provides a brief overview of the Bear River Hydro System's components and the division of the study area into three distinct regions.

Section 1038
ibit archaeological potential. For the purposes of this assessment, the Bear River Hydro system has been divided into three distinct study areas: Gulch Flowage, Ridge Flowage, and Lake Mulgrave. Detailed explanations and associated methodo...

AI summary The document discusses archaeological assessments for the Bear River Hydro System, dividing it into three study areas and recommending reconnaissance, shovel testing, and excavation based on the 2018 Hydro Asset Archaeology Study. The Bear River Plant area is identified as having high archaeological potential.

Section 1052
thin the dam footprint. It is estimated that the archaeological assessment can be undertaken at a cost of plus applicable taxes. Asset Location: Lunn Dam Type: Freeboard Dam The results of the 2018 Hydro Asset Archaeology Study indicate th...

AI summary The text discusses archaeological assessments for several dam sites in Nova Scotia, including Lunn Dam, Dean Chapter Lake Dam, and Salmontail Lake Main Dam. Each site is identified as having high potential for impacting archaeological resources, with specific recommendations for investigation and estimated costs.

Section 1061
removal. It is estimated that the archaeological assessment can be undertaken at a cost of plus applicable taxes. Asset Location: Aylesford Lake Type: Dewatering The results of the 2018 Hydro Asset Archaeology Study indicate that Aylesford...

AI summary The text discusses archaeological assessments for Aylesford Lake and the Dickie Brook Hydro System, including estimated costs and locations. It highlights the potential for archaeological resources at Aylesford Lake and provides details about the Dickie Brook Hydro System's location and infrastructure.

Section 1065
3). It is estimated that the archaeological assessment can be undertaken at a cost of plus applicable taxes. Asset Location: Dickie Brook Pipeline Type: Pipeline The results of the 2018 Hydro Asset Archaeology Study indicate that area surr...

AI summary The document outlines the need for an archaeological assessment for the Dickie Brook Pipeline and provides details about the Fall River Hydro System, including its location, associated assets, and references to a 2018 Hydro Asset Archaeology Study that informs the recommended actions and costings for archaeological investigations.

Section 1073
establish stratigraphic context. No additional Precontact material was identified. The excavation yielded 13 wire nails, one iron spike and a small concentration of charcoal (de Boer et al. 2012b:10). As a result of the 2012 archaeological...

AI summary The text discusses archaeological findings near Harmony Lake, including the discovery of historical and precontact artifacts, and the potential for further archaeological resources if water levels are lowered. It also mentions the cost of an archaeological assessment and previous salvage projects, such as the 1983 McGowan Lake and Dean Lake Headpond project.

Section 1081
ded in the 2018 Hydro Asset Archaeology Program. The following recommendations and costings for the Mersey Hydro System are based on the results of that study and are summarized in Table 10. Table 10. Summary of costings for individual ass...

AI summary The text discusses the 2018 Hydro Asset Archaeology Program and its findings related to the Mersey Hydro System, including recommendations and costings for various asset locations. The Cowie Falls Wing Dams are highlighted as having a high potential for impacting archaeological resources, with ongoing work influencing final costings and requirements.

Section 1089
ch would increase estimated costs. REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 Direct Evidence Appendix 8C Page 62 of 129 Asset Location: Lower Great Brook Headpond Type: Dewatering The results of the 2018 Hydro Asset Ar...

AI summary The text discusses archaeological assessments for two hydroelectric assets in Nova Scotia: Lower Great Brook Headpond and Big Falls Main Dam. The Lower Great Brook Headpond has a high potential for archaeological resources, and a reconnaissance assessment is recommended. The Big Falls Main Dam is described in terms of its construction type and location.

Section 1113
ions were conducted for this area. The recommended course of action is archaeological reconnaissance of the lakeshore. The shoreline of Corbett Lake was reconstructed using historic air photos (1945). It is estimated that the archaeologica...

AI summary The text discusses the Sheet Harbour Hydro System, its location, and associated infrastructure, including dams and generating units. It references an archaeological study conducted in 2018 and outlines the need for archaeological reconnaissance along the lakeshore, with cost estimates provided.

Section 1165
dam footprint. It is estimated that the archaeological assessment can be undertaken at a cost of plus applicable taxes. Asset Location: Gisborne Plant Type: Plant/Powerhouse The results of the 2018 Hydro Asset Archaeology Study indicate th...

AI summary The document outlines the need for archaeological assessments at several hydroelectric assets in Nova Scotia, including the Gisborne Plant, D8-1-D8-7 and Wing Dams, and D9, D10. The assessments are recommended due to potential impacts on archaeological resources, with estimated costs provided for each location.

Section 1168
ounding the dam. It is estimated that the archaeological assessment can be undertaken at a cost of plus applicable taxes. Asset Location: D11-3 Dam Type: Small Dam; Rockfill The results of the 2018 Hydro Asset Archaeology Study indicate th...

AI summary The text discusses the need for archaeological assessments at two dam sites (D11-3 Dam and Surge Lake) due to their high potential for impacting archaeological resources. The recommended actions include reconnaissance and monitoring, with estimated costs provided.

Section 1210
scription Estimated Cost July 2024 Assumptions / Notes: Code 100's SITE REMEDIATION ISSUES: 12 SITE REMEDIATION ISSUES 11,989,017 13 SITE ACCESS REMOVALS 58,224 15 SITE SERVICES REMOVALS 191,212 200's BUILDINGS AND STRUCTURES: 21 POWERHOUS...

AI summary The text outlines estimated costs for various site remediation, building removal, and boiler-related activities, including site remediation, removal of site access, and decommissioning of auxiliary plants and structures.

Section 1293
ed with Production Plant) $ . 27 Oil/Gas Supply Structures - Remove to Grade Level $ . 300's BOILERS AND AUXILIARIES: 33 Boiler Plant - Removals $ . 34 Boiler Instruments and Control Removals . . $ 35 Fuel Handling Systems Removals $ 36 Bo...

AI summary The document outlines various removal and decommissioning activities related to production plants, boilers, turbines, and electrical systems, including items such as boiler plant removals, fuel handling systems, and environmental systems.

Section 1315
material will require excavation and placement in the LAMS. A total of 15,000 m3 has been estimated. Since the ash lagoon and coal pile runoff ponds are reportedly unlined, the accumulated coal and ash sediment will need to be excavated an...

AI summary The text discusses the need for excavating and relocating coal and ash sediment from unlined runoff ponds to the LAMS site. It estimates the volume of material to be moved and outlines the capping requirement for containment cells after deposition.

Section 1321
years (e.g., communication related to results of LTM following decommissioning and remediation). No sianificant chanae to 2020 estimate therefore aoolv inflation factor. Future Controls of Land Use 50,000 Assume land use remains industrial...

AI summary The text outlines future land use controls and site access removals, including assumptions about industrial land use under NSPI ownership, ongoing fence maintenance costs, and specific costs for access roads, railways, and wharves. It also mentions the inclusion of remediation costs and inflation factors in liability estimates.

Section 1329
242 Lagoon & Final Disposal Areas (includes Final Cell Impervious Cap, Top Soil and Seeding) inc in line 91 243 Open 26 AUXILIARY BUILDING REMOVAL 85,564 (NOT ASSOCIATED WITH PRODUCTION PLANT) 260 General 261 Utility Buildings 85,564 steel...

AI summary The text outlines various infrastructure and disposal-related items, including the removal of auxiliary buildings, oil and gas supply structures, and components related to boilers and auxiliaries. Specific costs and details for items like oil pipelines, storage tanks, and drainage systems are listed.

Section 1340
512 Metering 513 Transformers (May Contain PCB's) no PCB,s in transformers (all equip tested and tagged) 56 ELECTRICAL POWER SYSTEMS REMOVAL 169,508 560 General -Electrical (including Junction and Terminal Boxes) 91,133 includes all discon...

AI summary The document outlines the removal of electrical power systems and auxiliary systems and equipment, including transformers, medium and low voltage systems, lighting, grounding, cable tray, control and power cable systems, with specific costs listed for each category.

Section 1351
pond, treatment ponds in the CFB area, leachate collection tanks, Hayley's Pond, drainage ditch from CFB area to ocean).

AI summary The text describes various environmental features and infrastructure elements, including ponds, treatment ponds, leachate collection tanks, Hayley's Pond, and a drainage ditch connecting the CFB area to the ocean.

Section 1367
rom the Abercrombie Ash Management Site. Assumed area for an engineered cap is 176,000m2. Due to the lack of testing to date in the coaVpetcoke laydown area, the potential risk is unknown and it is assumed that a 0.3m cap of clean Class B...

AI summary The document discusses the management of the Abercrombie Ash Management Site, including the use of a 0.3m cap of clean Class B gravel in the coaVpetcoke laydown area due to unknown risks and the need for additional fill, grading, seeding, and siltation controls in areas affected by PHC and PHC-impacted soil.

Section 1375
36,285 200's BUILDINGS AND STRUCTURES: 21 POWERHOUSE AND AUXILIARY STRUCTURES REMOVALS 4,644,760 210 Auxiliary Structures 9,225 211 Powerhouse 3,189,669 212 Turbine/ Generator (including Foundations) 145,813 213 Stack (including CEM Struct...

AI summary The text outlines the costs associated with the removal of various structures and equipment at a power facility, including auxiliary structures, powerhouse, turbine/generator, stack, asbestos abatement, and miscellaneous foundations. It also mentions the removal of circulating water to 1 meter below grade.

Section 1380
nd Seeding) 243 Open removal and demolition of concrete slab 26 AUXILIARY BUILDING REMOVAL 189,524 (NOT ASSOCIATED WITH PRODUCTION PLANT) 260 General 261 Utility Buildings 182,267 steel structure and metal clad siding/ concrete foundations...

AI summary The text outlines costs associated with the removal and demolition of various structures, including auxiliary buildings, oil and gas supply structures, and boiler auxiliaries, with detailed line items for different components and their respective costs.

Section 1423
ing removals 226 Tidal work& Sed. & Erosion Contol 145,140 For Tidal work& Sediment & Erosion Contol 0 Stantec \\ca0213-ppfss01\work_group\1214\active\121418266\05_report_deliverable\draft_doc\Revised_Draft\Site5_2024 Estimate-Tufts Cove G...

AI summary The text provides a cost study related to tidal work, sediment, and erosion control at Tufts Cove Thermal Generating Station. It includes a reference to a document titled 'Site5_2024 Estimate-Tufts Cove Generating Station - R1.xlsx' and mentions a page number from a confidential appendix.

Section 1426
Assumed all consumed 24 ASH HANDLING PLANT DECOMMISSIONING 455,667 240 General 455,667 241 Disposal System 242 Lagoon & Final Disposal Areas (includes Final Cell Impervious Cap, Top Soil and Seeding) covered in site remediation section 243...

AI summary The text outlines costs associated with decommissioning an ash handling plant, removing auxiliary buildings, and adjusting oil and gas supply structures to grade level. Specific line items and costs are listed for various components of these projects.

Section 1427
79,950 27 OIL / GAS SUPPLY STRUCTURES - REMOVE TO GRADE LEVEL 564,914 270 General 271 Oil Pipelines 164,040 demolition of piping systems from dock to tanks 272 Oil Storage Tanks 440,000 Tank cleaning in Section 100 - tank scrap value -275,...

AI summary The text provides a breakdown of costs related to oil and gas supply structures, including pipeline demolition, tank cleaning, and containment berm removal, with specific figures and values listed for various components.

Section 1442
Assumptions/ Notes:2024 Code 58 ELECTRICAL CONTROL AND COMMUNICATION 43,710 580 General Electrical Controls 16,370 581 Communications 7,291 582 Supervisory and Telemetering System (SCADA) 583 Fire detection and Safety Systems (When not par...

AI summary The text outlines various electrical control and communication costs, including general electrical controls, communications, SCADA systems, fire detection, relaying, and time standards. It also lists costs related to water systems removal.

Section 1447
res and plan 900's SCHEDULES AND GENERAL DRAWINGS: 90 DRAWINGS 54,680 900 Final Site General Arrangement Drawing 54,680 0 Stantec \\ca0213-ppfss01\work_group\1214\active\121418266\05_report_deliverable\draft_doc\Revised_Draft\Site5_2024 Es...

AI summary The document includes a schedule and general drawings related to a power production site, specifically the Tuft’s Cove LM6000 with Waste Heat Recovery Steam Power Plant. It also mentions a remediation study update for NSPI Power Production Sites, including locations such as Burnside, Tusket, and Victoria Junction.

Section 1469
00 VJ 563 120 Volt Systems and Supplies 564 Continuous Power Systems 567 Cathodic Protection System 568 Generator Output System 57 AUXILIARY SYSTEMS AND EQUIPMENT REMOVALS (IF NOT COVERED ELSEWHERE) 570 General 571 Lighting included line 1...

AI summary The text outlines various electrical systems and equipment removals, including lighting, grounding, cable tray, control cable systems, and power cable systems. It also mentions the addition of a new fire detection and suppression system in 2020, which uses an inert gas suppressant instead of Halon.

Section 1487
- 15 SITE SERVICES REMOVALS 33 382 150 Site Services 153 Raw Water Suoolv 7 257 removal and canoino water lines increased comnlexitv since 2007. 154 Sewaae Svstems 7 257 removal and caooina sewer lines 155 Storm Water and Floor Drainaae Sv...

AI summary The document outlines the removal of various site services and structures, including raw water systems, sewage systems, storm water systems, retaining walls, and lighting in the yard area. It also mentions the removal of powerhouse and auxiliary structures, with costs and assumptions noted.

Section 1491
Code Julv 2024 23 COAL HANDLING PLANT • REMOVE TO 1 METER BELOW GRADE 230 Waste Water I Effluent Treatment System 231 Dumoer House Facilities /incl. Coal Unloadino Facilities and Primarv Convevorsl 232 Stockout Convevors Crushers Samoler e...

AI summary The document outlines various items related to coal handling, ash handling plant decommissioning, and auxiliary building removal. It includes details on waste water treatment systems, coal handling plant components, disposal systems, and structures associated with oil and gas supply.

Section 1503
ystem 568 Generator Outout Svstem 57 AUXILIARY SYSTEMS AND EQUIPMENT REMOVALS 2,460 IIF NOT COVERED ELSEWHERE! 570 General 2 460 HTC Natural aas oioina 571 Liahtina line158 572 Groundina (All Buildinas Tanks and Stacks) line211 573 Cable T...

AI summary The text lists various systems and equipment removals, including auxiliary systems, electrical controls, and water systems, along with associated costs and line items. These items are categorized under different sections such as generator output systems, electrical control and communication, and common services.

Section 1526
and Accessories 34 BOILER INSTRUMENTS AND CONTROL REMOVALS does not apply to this site 340 Unit Instruments and Controls - General 341 Plant DCS and Boiler Control System 343 Burner Automation System 344 Instrumentation 348 Steam Measureme...

AI summary The text outlines various systems and components related to boiler instruments, fuel handling, and steam and water systems, including their removal processes. Specific systems such as the DCS, burner automation, and coal handling are listed, along with notes about fuel disposal and shutdown planning.

Section 1532
513 Transformers (May Contain PCB's) 56 ELECTRICAL POWER SYSTEMS REMOVAL 25,000 560 General -Electrical (including Junction and Terminal Boxes) 561 Medium Voltage Systems (4 kV to 15 kV) 25000 562 Low Voltage Systems (480 V to 600 V) 563 1...

AI summary The text outlines various categories and associated costs related to the removal of electrical systems and equipment, including transformers, auxiliary systems, and control and communication systems.

Section 1533
2,460 582 Supervisory and Telemetering System (SCADA) 2,460 583 Fire detection and Safety Systems (When not part of DCS System 341) 584 Relaying, Metering, Control and Recording 585 Data Acquisition and Annunciator Systems (When not part o...

AI summary The text contains a list of system numbers and associated descriptions, including SCADA, fire detection systems, and data acquisition systems, as well as a mention of a cost study related to the Tusket Generating Station combustion turbine.

Section 1535
eating Systems (Steam Heating) 733 Water Treatment Plant Heating System (when separate from main Plant Building) 734 District Heating I Cooling System 75 COMPRESSED GAS SERVICES REMOVAL (EXCLUDING FUEL GAS) 750 General 751 Plant Service Ai...

AI summary The text lists various systems and equipment related to heating, compressed gas services, and plant operating equipment removals, including specific line items such as water treatment plant heating systems, nitrogen systems, and environmental monitoring equipment. It appears to be a technical estimate or cost breakdown for a generating site.

Section 1541
120 General Preoaration /Plannino Permits Co-ordination with Reaulators etc.\ 31 699 Meetinas corresoondence site clans. No sianificant chanae since 2020· therefore aoolv inflation factor. 121 Phase 1 -Site Information Assessment 9 225 Pha...

AI summary The text outlines various phases of a site assessment and remediation plan, including site information assessment, reconnaissance testing, detailed testing, and preparation of decommissioning and clean-up plans. It notes that methods from 2020 are being used with updated 2024 unit rates and that no significant changes have occurred since 2020, except for anticipated additional investigations.

Section 1559
tem (when separate from Turbine Contract) 42 CONDENSING PLANT AND CIRCULATING WATER SYSTEM REMOVALS does not apply to this site 420 General 421 Condensers and Auxiliaries 422 Circulating Water System (Screens, Pumps, Piping and Valves) 426...

AI summary The text outlines sections related to the removal of condensing plants and circulating water systems, including condensers, auxiliaries, and seawater treatment systems. It references a document from Stantec and mentions a redacted page from an appendix related to a 2026-2027 GRA Direct Evidence.

Section 1561
em 432 Bled Steam and Heater DrainsNents System 433 Low Pressure Feedwater System 434 Process Steam Piping 44 TURBO-GENERATOR CONTROLS REMOVAL 6000 Included in 2020: External lube oil coolers to reduce generator enclosure temperatures in s...

AI summary The text outlines various systems and components related to steam, feedwater, and electrical infrastructure, including turbine controls, distribution lines, and electrical power systems. Specific upgrades and removals are mentioned, such as external lube oil coolers and fuel control upgrades.

Section 1565
s (When not part of DCS System 341) 586 Time Standards 700's COMMON SERVICES 71 WATER SYSTEMS REMOVAL 710 General 711 Common I Domestic Water System 712 Auxiliary Circulating Water System (including Air Venting System) 714 Fire Fighting Sy...

AI summary The document outlines various systems related to water, ventilation, and heating that are part of common services, including specifics such as fire fighting systems, plumbing systems, and HVAC systems added in 2020 for control/admin buildings.

Section 1581
systems. No change since 2020; therefore, apply inflation factor. Excavation of Contamminated Soils and Sediments 70,000 It is assumed a small amount of PHC-impaded soil encountered during assessment work and/or decommissioning activities...

AI summary The text discusses the excavation of contaminated soils and sediments at a site, estimating the volume of material requiring removal and the capacity of existing containment cells at the BAMS site. The estimate has been updated to reflect on-site disposal at BAMS instead of off-site disposal.

Section 1582
apping. Estimate updated to reflect on-site disposal in BAMS as opposed to off-site disposal. Reclamation Measures 615,000 Due to the lack of testing to date in the coal pile area, the potential risk to receptors is unknown and it is assum...

AI summary The text discusses reclamation measures and in-program contaminant monitoring at the BAMS site. It outlines the estimated costs for capping the coal pile area with clean gravel, sampling existing wells, and monitoring surface water runoff during decommissioning activities. The estimates are based on updated 2024 unit rates and assumptions about potential risks.

Section 1588
,679 removals only (disconnections not inc.) 200's BUILDINGS AND STRUCTURES: 21 POWERHOUSE AND AUXILIARY STRUCTURES REMOVALS 615,000 210 Auxiliary Structures 211 Powertiouse 212 Turbine/ Generator (including Foundations) 213 Stack (includi...

AI summary The document outlines the costs and procedures for the removal of buildings and structures, including the Powerhouse, auxiliary structures, and asbestos abatement. It also details the removal of circulating water systems to a depth of one meter below grade, with specific line items for various components and associated costs.

Section 1589
224 Outfall Structures (and Restore Shore Line) 225 Recirculation System 226 Tidal work& Sad. & Erosion Contol ()stantec \\ca0213-ppfss01\work_group\1214\active\121418266\05_report_deliverable\draft_doc\Revised_Draft\Site10_2024 Estimate-P...

AI summary The document provides an estimate worksheet for site decommissioning as part of a financial depreciation cost study for the Marine Terminal Point Tupper location, dated July 15, 2024. It includes various project components such as outfall structures, recirculation systems, and tidal work for erosion control.

Section 1601
t Systems and Supplies 564 Continuous Power Systems 567 Cathodic Protection System 566 Generator Output System 57 AUXILIARY SYSlEMS AND EQUIPMENT REMOVALS (IF NOT COVERED ELSEWHERE) 570 General 571 Lighting 572 Grounding (All Buildings, Ta...

AI summary The text lists various systems and equipment related to electrical infrastructure, including power systems, auxiliary systems, and control and communication systems. It includes categories such as lighting, grounding, cable systems, and supervisory control systems.

Section 1611
122 Phase 2 - Development of Reconnaissance Testing Program 110,000 A portion of the previous assessment work induded a Phase 2 ESA; hoVw'Bver, the Phase 2 was not comprehensive and did not include all items prescribed in the NSE Phase 2 P...

AI summary The text outlines the need for a comprehensive Phase 2 Environmental Site Assessment (ESA) at a site, noting that previous Phase 2 work was not fully comprehensive. It estimates the number of monitoring wells, soil samples, and sediment samples required for testing around various areas of the site.

Section 1621
size of the site. Used same methodology as 2020 but 1Nith updated 2024 soil disposal rates. Reclamation Measures 799,500 Due to the lack of testing to date in the coal pile area and temporary coal laydown area, the potential risk to recept...

AI summary The text discusses reclamation measures for a site, including the use of a 0.3m cap of Class B gravel in areas with unknown risks due to lack of testing. It also mentions additional fill, grading, seeding, and siltation controls, and the application of an inflation factor based on 2020 data.

Section 1650
samples and 3 sediment samples from the v.etland area to the v.est of site v.tiere sheen 'NBS noted in previous assessments. Assume all samples ,.;11 be submitted for metals, BTEX/TPH, PAHs, voes and PCBs. Used same methodology as 2020 but...

AI summary The text mentions submitting samples and sediment samples from the V.Etland area to the V.Est of Site V.Tiere Sheen 'NBS, noting previous assessments. It also refers to using the same methodology as 2020 but with updated 2024 unit rates.

Section 1651
Used same methodology as 2020 but 'Mth updated 2024 unit rates. 123 Phase 3 - Detailed Testing Program 60,000 80,000 Detailed testing in the area including sampling of the existing MWs to complete the assessment of the site. Estimate an ad...

AI summary The text describes a detailed testing program for Phase 3, including sampling of existing monitoring wells (MWs), soil samples (SS), and other areas of concern identified during the Phase 2 assessment. It mentions the use of updated 2024 unit rates, similar to the methodology used in 2020.

Section 1654
See Right See Right Air monitoring not anticipated during remediation of TRMC since remedial activities are expected to be minimal. Construction of On-Site Containment Facilities See Right See Right Since no on-site containment facilities...

AI summary The text discusses the remediation of the TRMC site, noting that air monitoring is not anticipated due to minimal remedial activities. It also mentions the lack of on-site containment facilities and the transportation of impacted soil for disposal, with no associated construction costs.

Section 1666
t and Erosion Control 200's BUILDINGS AND STRUCTURES: 21 POWERHOUSE AND AUXILIARY STRUCTURES REMOVALS 720,000 885,600 210 Auxiliary Structures 211 Powarhouse 212 Turbine/ Generator (including Foundations) 213 Stack (including CEM Structure...

AI summary The text outlines costs associated with the removal of powerhouses, auxiliary structures, and related infrastructure, including asbestos abatement and water treatment facilities. Specific costs are listed for different components, with some items noting additional considerations or lack of full assessment.

Section 1670
273 Fuel Oil Drainage System (induding Drain Tank) 274 Gas Pipeline Layout and Supports 275 Dyke/ Containment Benn removal 300's BOILERS AND AUXILIARIES: N/A 33 BOILER PLANT. REMOVALS 330 General 331 Boiler 332 Draft Plant (including Air &...

AI summary The text outlines various infrastructure and equipment removals related to fuel oil drainage systems, gas pipelines, and boiler plants, including specific components such as draft plants, precipitators, and chemical cleaning systems.

Section 1672
LOCATION: SYDNEY TRANSPORTATION AND RAILCAR MAINTENANCE CENTRE DATE: DATE: 30-Jul-24 Account Estimated Cost: Estimated Cost: Item Description Assumptions / Notes: 2024 Code July2020 July2024 34 BOILER INSTRUMENTS AND CONTROL REMOVALS 340 U...

AI summary The document outlines various systems and components related to boiler instruments, fuel handling, steam and water systems, and ash and water treatment systems at the Sydney Transportation and Railcar Maintenance Centre, with associated cost estimates and item descriptions.

Section 1689
not expected. Estimate an additional 6 test pits, sampling of existing monitoring wells. No significant chanae since 2020; therefore, aoolv inflation factor. 124 Phase 4 - Preparation of Decommissioning and Clean-up Plans 6,150 Assumed to...

AI summary The text discusses the preparation and implementation of decommissioning and clean-up plans, including the removal of infrastructure like transformers and storage sheds, with no significant changes since 2020 and the application of an inflation factor. It also mentions worker safety and health monitoring.

Section 1692
Construction of On-Site Containment Facilities - Anv ootential soil excavation exoected to reauire off-site disoosal as site is on leased land. Handling of Wastewater and Surface Drainage 9,225 Johnson Brook located to the southwest, unnam...

AI summary The document discusses the construction of on-site containment facilities, handling of wastewater and surface drainage, control of fugitive atmospheric emissions, removal and disposal of materials and residues, and excavation of contaminated soils and sediments at a site. It notes that no significant changes have occurred since 2020 and mentions the use of an inflation factor for cost estimation.

Section 1706
569 Grounding system Assume remains in place 56 ELECTRICAL POWER SYSTEMS REMOVAL 560 General -Electrical (including Junction and Terminal Boxes) 561 Medium Voltage Systems (4 kV to 15 kV) 562 Low Voltage Systems (480 V to 600 V) 563 120 Vo...

AI summary The text outlines various electrical power systems removal tasks and associated costs, including grounding systems, medium and low voltage systems, and continuous power systems. It includes a subtotal of total direct labor and equipment costs, as well as a reference to a redacted document related to a 2026-2027 GRA Direct Evidence Appendix.

Section 1711
kl remain active until no longer reciuired by the demolition contractor. 12 SITE REMEDIATION ISSUES 279 825

AI summary The text discusses site remediation issues, with a focus on the active status of certain elements until no longer required by the demolition contractor.

Section 1725
l and other equipment 11,500 demolition all above grade steel and equipment/isolators 425 Demolition/removal substation equipment foundations (1m below grade) 66,000 $2.Sk/unit- demoltion to one (1) meter below finished grade - 430 Cranes...

AI summary The text outlines the costs associated with the demolition and removal of equipment, including cranes, transformers, and distribution lines, as part of a project involving site-specific infrastructure. Costs are itemized with detailed breakdowns for each activity and equipment type.

Section 1752
r includes transport off-site 908 Concrete Jersey Barriers 14,000 Approx 70 precast units across site.(resale @ $ 200 ea) ()stantec \\ca021�ppfss01\"work_group\1214\active\121418266\05_report_deliverable\draft_doc\Revised_Draft\Site16_2024...

AI summary The text provides a partial estimate for a site-related project, including items such as concrete barriers and associated costs. It references a location at Glen Morrison Quarry and includes a date of July 2024. The document appears to be a draft estimate for a final cost study.

Section 1798
.4 TOTAL TRANSMISSION PLANT 1,254,616,801 513,076,344 971,188,679 33,825,592 2.70 DISTRIBUTION PLANT LAND RIGHTS - EASEMENTS, SURVEYS AND CLEARING 65 - R5 0 118,136,716 15,711,852 102,424,864 1,860,352 1.57 55.1 STRUCTURES AND IMPROVEMENTS...

AI summary The text presents financial data related to total transmission and distribution plant costs, including land rights, structures, station equipment, and energy storage equipment, with various line items and percentages provided for the years 2026-2027. The data is part of a confidential appendix in a regulatory proceeding.

Section 1802
20 - S2 (10) 6,155,844 6,077,871 693,557 40,535 0.66 17.1 METERS - AMI 18 - S2 (10) 96,761,787 18,747,008 87,690,959 7,299,539 7.54 12.0 STREET LIGHTING AND SIGNAL SYSTEMS 22 - R2.5 (15) 19,074,061 12,890,306 9,044,865 839,992 4.40 10.8 ST...

AI summary The text presents financial data related to various utility services, including meters, street lighting, and signal systems, with details on costs, revenues, and other metrics. The data includes figures for different categories and their corresponding financial indicators.

Section 1803
L DISTRIBUTION PLANT 2,137,686,386 1,107,501,816 1,620,585,288 73,717,352 3.45

AI summary The text presents a line item from a financial report related to distribution plant values, showing figures for different years and a percentage, indicating financial data related to infrastructure.

N-92026-2027 GRA Appendix 12 A-C - Cost of Service Study Process - Redacted 306 passages
2026-2027 GRA Direct Evidence Appendix 12A(1) Page 1 of 46 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 28
2026-2027 GRA Direct Evidence Appendix 12A(1) Page 1 of 46 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Exhibit Reference Cells Modification values for PHP 5. Classify grid Input Tab Rows 39, 40, 566 Batteries CWIP separated scale storage b...

AI summary The document outlines modifications to exhibits in the 2026-2027 GRA Direct Evidence Appendix 12A(1), focusing on classifying grid-scale storage by ELCC and revising calculations to include batteries. It also involves adjustments to EHV/HV volumes and allocation factors for batteries.

CONFIDENTIAL p. p. 28
CONFIDENTIAL • 1 Exh 7 C30:E30 Adjust BUTU revenues with output of BCF file Enter missing allocation values Exh 8a Column K for PHP Batteries CWIP separated from 5. Classify grid scale Innut Tob Rows 39, 40, Transmission Plant CWIP & stora...

AI summary The text outlines various adjustments and classifications related to grid-scale storage, specifically focusing on the inclusion of batteries in transmission plant calculations and the revision of allocation factors. It includes references to exhibits and rows in spreadsheets that need updates, such as adding a 'Batteries' subfunction and revising HV/EHV calculations to account for batteries.

CONFIDENTIAL p. p. 43
CONFIDENTIAL Exhibit Reference Cells Modification BCF File – Data Inputs Rows 46, 77, 92, 100, 118, 127 Move volumes to ATL Input Data D217, D231:D239, D312:E322, D337:D345, D374:D377, D399:F399, D487:F487, D522, D534 Update values with ou...

AI summary The document details various modifications and updates to data inputs and exhibits, including moving volumes to ATL, updating values with outputs from the BCF file, and classifying grid-scale storage by ELCC. It also involves adding subfunctions for batteries and revising calculations to account for battery inclusion.

Description of the MSS p. p. 59
Description of the MSS - Distribution system costs are incurred to move electricity from generation and transmission facilities - to individual customers that are distributed geographically throughout the service territory of a - utility....

AI summary The document discusses the Minimum Size Method (MSS) for allocating distribution system costs between demand-related and customer-related components. It explains that distribution costs are influenced by both the number of customers and the peak load, and references the NARUC Manual for methodology. An example of the MSS application by Concentric is provided.

1 Prevalence in the Industry p. p. 61
1 Prevalence in the Industry - 2 Utilities throughout Canada and United States routinely use the MSS or the Zero-Intercept Study to - 3 classify a portion of the distribution assets as customer-related and demand-related. As described - 4...

AI summary The text discusses how utilities in Canada and the US use the Minimum Size Method (MSS) or the Zero-Intercept Study to classify distribution assets as customer-related or demand-related. Most utilities classify these assets between customer and demand, with half using the MSS, except for NS Power.

2026-2027 GRA Direct Evidence Appendix 12A(1) Page 36 of 46 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 63-64
2026-2027 GRA Direct Evidence Appendix 12A(1) Page 36 of 46 REDACTED (CONFIDENTIAL INFORMATION REMOVED) CONCENTRIC EVIDENCE: GRA COSS ELEMENTS 100% demand-related.[7](#page-64-0) This assertion, however, fails to recognize the fact that a...

AI summary The text argues that a portion of distribution system costs is not demand-related, as some infrastructure is required regardless of peak demand. The Minimum Size Method (MSS) is used to calculate non-variable distribution costs, which should not be allocated based on demand due to their fixed nature.

Figure 2: Relationship between Feeder Length and Customers by Geography p. p. 65
Figure 2: Relationship between Feeder Length and Customers by Geography Figure 2 illustrates that geographic dispersion of the customers and where they are located and not their peak demand drives the length of the feeder. As stated previo...

AI summary Figure 2 shows how geographic dispersion of customers affects feeder length. Professor Bonbright prefers classifying minimum-sized distribution costs as customer-related. The Ontario Energy Board (OEB) uses customer density to determine the customer component of distribution assets, with 60% classified as customer-related for densities under 30 customers per kM of lines. NS Power, with low customer density, would fall into this category.

Preamble p. pp. 68-126
- With respect to issues raised regarding MSS: - The cost associated with the Minimum System are customer-related and not demand-related; - The feeder length and pole counts, which drives a significant portion of the costs of the distribut...

AI summary The text discusses the Minimum Size Method (MSS) and its application in calculating distribution system costs, emphasizing that these costs are customer-related rather than demand-related and that the methodology is based on the NARUC Manual, which is still considered standard industry practice.

COSS CA DR-8 Attachment 1 Page 15 of 30 p. p. 74
COSS CA DR-8 Attachment 1 Page 15 of 30 Advisory LIIR T and C Tue 1-Mar-22 6:32 Alert GRLF and Shore Tue 1-Mar-22 6:33 Alert LIIR Tue 1-Mar-22 6:34 Advisory Cancellation LIIR T and C Tue 1-Mar-22 11:01 Alert Cancellation LIIR Tue 1-Mar-22...

AI summary The text contains a series of alerts, advisories, and interruptions related to LIIR, GRLF, and Shore systems, including cancellations and restoration notices, spanning from March 1 to March 14, 2022.

COSS CA DR-8 Attachment 1 Page 17 of 30 p. p. 74
COSS CA DR-8 Attachment 1 Page 17 of 30 Advisory Cancellation LIIR Tue 9-Aug-22 14:33 Advisory GRLF and Shore Tue 23-Aug-22 16:16 Advisory LIIR Tue 23-Aug-22 16:16 Advisory Cancellation GRLF and Shore Tue 23-Aug-22 18:11 Advisory Cancellat...

AI summary The text contains a list of advisories, alerts, and interruptions related to LIIR (Lighthouse Island Integrated Resource) and GRLF (Grand River Lowland Flood) from August 2022 to October 2022. These advisories include cancellations, alerts, and restoration notices, indicating ongoing operational and management activities related to these resources.

COSS CA DR-9 Attachment 1 Page 2 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 2 of 627 Start Time End Time ANL_MW 1/3/2019 22:00 1/3/2019 23:00 1500.7 1/3/2019 23:00 1/4/2019 0:00 1495.3 1/4/2019 0:00 1/4/2019 1:00 1461.1 1/4/2019 1:00 1/4/2019 2:00 1438.1 1/4/2019 2:00 1/4/2019 3:00 1...

AI summary The document provides a table of load data, showing the start and end times of intervals along with corresponding ANL_MW values, which likely represent measured or forecasted electricity demand over specific periods in January 2019.

COSS CA DR-9 Attachment 1 Page 3 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 3 of 627 Start Time End Time ANL_MW 1/6/2019 20:00 1/6/2019 21:00 1/6/2019 21:00 1/6/2019 22:00 1298.8 1200.6 1/6/2019 22:00 1/6/2019 23:00 1072.4 1/6/2019 23:00 1/7/2019 0:00 1013.8 1/7/2019 0:00 1/7/2019 1:...

AI summary This document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to electricity demand analysis. The data spans from January 6, 2019, to January 9, 2019, and provides detailed load measurements for specific time periods.

COSS CA DR-9 Attachment 1 Page 4 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 4 of 627 Start Time End Time ANL_MW 1/9/2019 18:00 1/9/2019 19:00 1/9/2019 19:00 1/9/2019 20:00 1208.9 1158.4 1/9/2019 20:00 1/9/2019 21:00 1119.0 1/9/2019 21:00 1/9/2019 22:00 1020.3 1/9/2019 22:00 1/9/2019...

AI summary This document contains a table with apparent net load in megawatts (ANL_MW) over specific time intervals from January 9 to January 12, 2019. It appears to be part of a regulatory proceeding related to energy usage and load management.

COSS CA DR-9 Attachment 1 Page 5 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 5 of 627 Start Time End Time ANL_MW 1/12/2019 16:00 1/12/2019 17:00 1/12/2019 17:00 1/12/2019 18:00 1569.1 1670.1 1/12/2019 18:00 1/12/2019 19:00 1641.2 1/12/2019 19:00 1/12/2019 20:00 1586.0 1/12/2019 20:00...

AI summary The document contains a table with timestamps and Apparent Net Load in Megawatts (ANL_MW) values, indicating fluctuations in electrical load over a period from January 12, 2019, to January 15, 2019. This data may be relevant for analyzing energy demand patterns and grid performance.

COSS CA DR-9 Attachment 1 Page 6 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 6 of 627 Start Time End Time ANL_MW 1/15/2019 14:00 1/15/2019 15:00 1/15/2019 15:00 1/15/2019 16:00 1388.3 1428.1 1/15/2019 16:00 1/15/2019 17:00 1525.4 1/15/2019 17:00 1/15/2019 18:00 1674.0 1/15/2019 18:00...

AI summary The document presents a table of apparent net load (ANL_MW) values over specific time intervals from January 15 to January 18, 2019. The data reflects variations in load demand across different hours, which may be relevant for energy planning and grid management.

COSS CA DR-9 Attachment 1 Page 7 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 7 of 627 Start Time End Time ANL_MW 1/18/2019 12:00 1/18/2019 13:00 1/18/2019 13:00 1/18/2019 14:00 1677.4 1603.5 1/18/2019 14:00 1/18/2019 15:00 1526.6 1/18/2019 15:00 1/18/2019 16:00 1486.9 1/18/2019 16:00...

AI summary The text presents a table with timestamps and values for Apparent Net Load in Megawatts (ANL_MW) over several days in January 2019. It includes a partially confidential appendix from a regulatory proceeding, indicating the data may be part of a larger analysis or evidence submission.

COSS CA DR-9 Attachment 1 Page 10 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 10 of 627 Start Time End Time ANL_MW 1/27/2019 6:00 1/27/2019 7:00 1/27/2019 7:00 1/27/2019 8:00 1398.9 1464.9 1/27/2019 8:00 1/27/2019 9:00 1541.8 1/27/2019 9:00 1/27/2019 10:00 1582.0 1/27/2019 10:00 1/27/2...

AI summary The document contains a table showing the start and end times of events along with corresponding ANL_MW values, likely related to energy usage or generation. It also includes a partially confidential appendix from a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 12 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 12 of 627 Start Time End Time ANL_MW 2/2/2019 2:00 2/2/2019 3:00 2/2/2019 3:00 2/2/2019 4:00 1342.8 1324.4 2/2/2019 4:00 2/2/2019 5:00 1366.3 2/2/2019 5:00 2/2/2019 6:00 1370.7 2/2/2019 6:00 2/2/2019 7:00 143...

AI summary The document presents a table of data showing the start and end times of events, along with corresponding ANL_MW values. The data spans from February 2, 2019, to February 5, 2019, and appears to be related to energy or operational metrics.

COSS CA DR-9 Attachment 1 Page 43 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 43 of 627 Start Time End Time ANL_MW 5/3/2019 13:00 5/3/2019 14:00 5/3/2019 14:00 5/3/2019 15:00 1041.0 1003.6 5/3/2019 15:00 5/3/2019 16:00 972.7 5/3/2019 16:00 5/3/2019 17:00 957.1 5/3/2019 17:00 5/3/2019 1...

AI summary The text presents a table containing time intervals and corresponding Apparent Energy Load in Megawatts (ANL_MW) values, likely representing energy usage data over a specific period. The data spans multiple days starting from May 3, 2019, and includes timestamps and load measurements.

COSS CA DR-9 Attachment 1 Page 44 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 44 of 627 Start Time End Time ANL_MW 5/6/2019 11:00 5/6/2019 12:00 5/6/2019 12:00 5/6/2019 13:00 1125.3 1070.8 5/6/2019 13:00 5/6/2019 14:00 1019.9 5/6/2019 14:00 5/6/2019 15:00 982.3 5/6/2019 15:00 5/6/2019...

AI summary The document contains a table listing apparent energy load in megawatts (ANL_MW) over specific time intervals on May 6th to May 9th, 2019. The data appears to be related to energy usage or load management, likely for regulatory analysis or planning purposes.

COSS CA DR-9 Attachment 1 Page 48 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 48 of 627 Start Time 5/18/2019 3:00 End Time 5/18/2019 4:00 ANL_MW 841.1 5/18/2019 4:00 5/18/2019 5:00 899.7 5/18/2019 5:00 5/18/2019 6:00 860.3 5/18/2019 6:00 5/18/2019 7:00 5/18/2019 7:00 5/18/2019 8:00 878...

AI summary This document presents a table of apparent energy load in megawatts (ANL_MW) recorded over multiple time intervals on May 18, 2019, through May 21, 2019. The data reflects energy usage fluctuations throughout the day and night, indicating patterns in electricity demand.

COSS CA DR-9 Attachment 1 Page 49 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 49 of 627 Start Time End Time ANL_MW 5/21/2019 1:00 5/21/2019 2:00 5/21/2019 2:00 5/21/2019 3:00 828.4 808.6 5/21/2019 3:00 5/21/2019 4:00 771.5 5/21/2019 4:00 5/21/2019 5:00 796.3 5/21/2019 5:00 5/21/2019 6:...

AI summary This document contains a table with time intervals and corresponding apparent energy load in megawatts (ANL_MW) for a specific period in May 2019. The data appears to be related to energy usage or load management, potentially for regulatory analysis or planning.

COSS CA DR-9 Attachment 1 Page 51 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 51 of 627 Start Time End Time ANL_MW 5/26/2019 21:00 5/26/2019 22:00 5/26/2019 22:00 5/26/2019 23:00 1012.9 959.8 5/26/2019 23:00 5/27/2019 0:00 877.5 5/27/2019 0:00 5/27/2019 1:00 859.4 5/27/2019 1:00 5/27/2...

AI summary This document presents a table of apparent energy load in megawatts (ANL_MW) over specific time intervals from May 26 to May 29, 2019. The data appears to be part of a regulatory proceeding and includes detailed load measurements across multiple time periods.

COSS CA DR-9 Attachment 1 Page 53 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 53 of 627 Start Time End Time ANL_MW 6/1/2019 17:00 6/1/2019 18:00 995.8 6/1/2019 18:00 6/1/2019 19:00 1014.7 6/1/2019 19:00 6/1/2019 20:00 1016.5 6/1/2019 20:00 6/1/2019 21:00 1040.3 6/1/2019 21:00 6/1/2019...

AI summary The document presents a table containing time-stamped data on apparent energy load (ANL_MW) for a specific period in June 2019. It shows the load values recorded at different hourly intervals, which may be used for analyzing energy consumption patterns or system performance.

COSS CA DR-9 Attachment 1 Page 54 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 54 of 627 Start Time End Time ANL_MW 6/4/2019 15:00 6/4/2019 16:00 872.2 6/4/2019 16:00 6/4/2019 17:00 6/4/2019 17:00 6/4/2019 18:00 891.9 885.4 6/4/2019 18:00 6/4/2019 19:00 844.0 6/4/2019 19:00 6/4/2019 20:...

AI summary The document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy demand data over a period in June 2019. This data is part of a regulatory proceeding, possibly related to electricity generation and grid management.

COSS CA DR-9 Attachment 1 Page 55 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 55 of 627 Start Time End Time ANL_MW 6/7/2019 13:00 6/7/2019 14:00 6/7/2019 14:00 6/7/2019 15:00 1037.0 991.9 6/7/2019 15:00 6/7/2019 16:00 962.7 6/7/2019 16:00 6/7/2019 17:00 948.2 6/7/2019 17:00 6/7/2019 18...

AI summary The document provides a table of Apparent Net Load in Megawatts (ANL_MW) over various time intervals from June 7 to June 10, 2019. The data shows fluctuations in load throughout the day, with peak loads occurring in the early morning and late evening hours.

COSS CA DR-9 Attachment 1 Page 56 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 56 of 627 Start Time End Time ANL_MW 6/10/2019 11:00 6/10/2019 12:00 6/10/2019 12:00 6/10/2019 13:00 1008.6 1008.4 6/10/2019 13:00 6/10/2019 14:00 988.5 6/10/2019 14:00 6/10/2019 15:00 949.6 6/10/2019 15:00 6...

AI summary This document provides a table of apparent net load (ANL_MW) data over a period of time in June 2019. It shows the start and end times for each interval and the corresponding ANL_MW values. The data appears to be related to energy load management or grid operations.

COSS CA DR-9 Attachment 1 Page 57 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 57 of 627 Start Time End Time ANL_MW 6/13/2019 9:00 6/13/2019 10:00 6/13/2019 10:00 6/13/2019 11:00 1025.4 1024.5 6/13/2019 11:00 6/13/2019 12:00 1016.3 6/13/2019 12:00 6/13/2019 13:00 978.5 6/13/2019 13:00 6...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over a series of time intervals on June 13-16, 2019. The data reflects changes in load demand across different hours, likely used for analysis in a regulatory proceeding related to electricity generation and distribution.

COSS CA DR-9 Attachment 1 Page 58 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 58 of 627 Start Time End Time ANL_MW 6/16/2019 7:00 6/16/2019 8:00 6/16/2019 8:00 6/16/2019 9:00 555.9 663.8 6/16/2019 9:00 6/16/2019 10:00 775.1 6/16/2019 10:00 6/16/2019 11:00 859.0 6/16/2019 11:00 6/16/201...

AI summary The text presents a table showing Apparent Net Load (ANL_MW) values over specific time intervals on June 16-19, 2019. These data points likely relate to electricity demand or generation analysis during that period.

COSS CA DR-9 Attachment 1 Page 59 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 59 of 627 Start Time End Time ANL_MW 6/19/2019 5:00 6/19/2019 6:00 6/19/2019 6:00 6/19/2019 7:00 827.0 945.3 6/19/2019 7:00 6/19/2019 8:00 1092.6 6/19/2019 8:00 6/19/2019 9:00 1165.8 6/19/2019 9:00 6/19/2019...

AI summary This document provides a table of apparent net load in megawatts (ANL_MW) over specific time intervals on June 19, 2019, through June 22, 2019. The data reflects fluctuations in energy demand across different hours, likely used for analysis in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 60 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 60 of 627 Start Time End Time ANL_MW 6/22/2019 3:00 6/22/2019 4:00 6/22/2019 4:00 6/22/2019 5:00 387.6 366.4 6/22/2019 5:00 6/22/2019 6:00 368.6 6/22/2019 6:00 6/22/2019 7:00 404.9 6/22/2019 7:00 6/22/2019 8:...

AI summary The text provides a table showing the apparent net load in megawatts (ANL_MW) over various time intervals on June 22, 2019, and June 23–24, 2019. The data appears to be part of a regulatory proceeding related to energy load management and planning.

COSS CA DR-9 Attachment 1 Page 61 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 61 of 627 Start Time End Time ANL_MW 6/25/2019 1:00 6/25/2019 2:00 854.2 6/25/2019 2:00 6/25/2019 3:00 6/25/2019 3:00 6/25/2019 4:00 834.1 827.8 6/25/2019 4:00 6/25/2019 5:00 824.6 6/25/2019 5:00 6/25/2019 6:...

AI summary This document contains a table with time-stamped data showing the Apparent Net Load in Megawatts (ANL_MW) over a period in June 2019. It appears to be part of a regulatory proceeding related to electricity load management and may be used for analyzing energy demand patterns.

COSS CA DR-9 Attachment 1 Page 62 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 62 of 627 Start Time End Time ANL_MW 6/27/2019 23:00 6/28/2019 0:00 6/28/2019 0:00 6/28/2019 1:00 829.9 789.6 6/28/2019 1:00 6/28/2019 2:00 748.9 6/28/2019 2:00 6/28/2019 3:00 745.9 6/28/2019 3:00 6/28/2019 4...

AI summary The document provides a table of apparent net load (ANL_MW) values over specific time intervals from June 27 to June 30, 2019. These data points likely represent energy demand measurements or related metrics, but the context of the proceeding is not explicitly discussed.

COSS CA DR-9 Attachment 1 Page 63 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 63 of 627 Start Time End Time ANL_MW 6/30/2019 21:00 6/30/2019 22:00 6/30/2019 22:00 6/30/2019 23:00 878.2 857.4 6/30/2019 23:00 7/1/2019 0:00 805.8 7/1/2019 0:00 7/1/2019 1:00 724.4 7/1/2019 1:00 7/1/2019 2:...

AI summary This document provides a table listing apparent net load in megawatts (ANL_MW) over specific time intervals from June 30, 2019, to July 3, 2019. It includes data on energy demand fluctuations during different hours of the day, which may be relevant to grid operations and energy management.

COSS CA DR-9 Attachment 1 Page 64 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 64 of 627 Start Time End Time ANL_MW 7/3/2019 19:00 7/3/2019 20:00 1036.0 7/3/2019 20:00 7/3/2019 21:00 7/3/2019 21:00 7/3/2019 22:00 1024.1 1000.7 7/3/2019 22:00 7/3/2019 23:00 955.2 7/3/2019 23:00 7/4/2019...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to energy load data over a specific period in July 2019. This data may be used for analysis in a regulatory proceeding, potentially concerning energy generation, grid management, or demand forecasting.

COSS CA DR-9 Attachment 1 Page 65 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 65 of 627 Start Time End Time ANL_MW 7/6/2019 17:00 7/6/2019 18:00 7/6/2019 18:00 7/6/2019 19:00 1010.7 999.6 7/6/2019 19:00 7/6/2019 20:00 971.2 7/6/2019 20:00 7/6/2019 21:00 948.4 7/6/2019 21:00 7/6/2019 22...

AI summary The text presents a table with timestamps and Apparent Net Load in Megawatts (ANL_MW) values, likely related to electricity demand or generation patterns over a specific period. The table spans multiple days in July 2019 and includes detailed time intervals and corresponding ANL_MW measurements.

COSS CA DR-9 Attachment 1 Page 66 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 66 of 627 Start Time End Time ANL_MW 7/9/2019 15:00 7/9/2019 16:00 7/9/2019 16:00 7/9/2019 17:00 944.6 1026.9 7/9/2019 17:00 7/9/2019 18:00 1052.8 7/9/2019 18:00 7/9/2019 19:00 1019.4 7/9/2019 19:00 7/9/2019...

AI summary This document contains a table of apparent net load in megawatts (ANL_MW) over various time intervals from July 9 to July 12, 2019. The data appears to be related to energy usage and is part of a regulatory proceeding, likely concerning electricity generation and distribution in Nova Scotia.

COSS CA DR-9 Attachment 1 Page 67 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 67 of 627 Start Time End Time ANL_MW 7/12/2019 13:00 7/12/2019 14:00 7/12/2019 14:00 7/12/2019 15:00 860.9 857.9 7/12/2019 15:00 7/12/2019 16:00 888.2 7/12/2019 16:00 7/12/2019 17:00 909.3 7/12/2019 17:00 7/1...

AI summary The text provides a table of apparent net load in megawatts (ANL_MW) over specific time intervals on July 12-15, 2019. This data likely relates to energy demand analysis or grid management in Nova Scotia.

COSS CA DR-9 Attachment 1 Page 68 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 68 of 627 Start Time End Time ANL_MW 7/15/2019 11:00 7/15/2019 12:00 7/15/2019 12:00 7/15/2019 13:00 1028.9 996.2 7/15/2019 13:00 7/15/2019 14:00 984.3 7/15/2019 14:00 7/15/2019 15:00 972.9 7/15/2019 15:00 7/...

AI summary This document contains a table of Apparent Net Load (ANL_MW) data over a period of time, spanning from July 15, 2019, to July 18, 2019, with measurements recorded every hour. The data appears to be part of a regulatory proceeding, possibly related to energy load management or grid operations.

COSS CA DR-9 Attachment 1 Page 69 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 69 of 627 Start Time End Time ANL_MW 7/18/2019 9:00 7/18/2019 10:00 7/18/2019 10:00 7/18/2019 11:00 1159.4 1175.2 7/18/2019 11:00 7/18/2019 12:00 1194.3 7/18/2019 12:00 7/18/2019 13:00 1206.5 7/18/2019 13:00...

AI summary The document contains a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to energy usage or generation data. It also references a partially confidential appendix from a regulatory proceeding, indicating the presence of sensitive information.

COSS CA DR-9 Attachment 1 Page 70 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 70 of 627 Start Time End Time ANL_MW 7/21/2019 7:00 7/21/2019 8:00 7/21/2019 8:00 7/21/2019 9:00 898.9 1048.2 7/21/2019 9:00 7/21/2019 10:00 1232.0 7/21/2019 10:00 7/21/2019 11:00 1278.4 7/21/2019 11:00 7/21/...

AI summary This document contains a table with time-stamped data showing Apparent Net Load in Megawatts (ANL_MW) for a period in July 2019. It appears to be related to energy usage or generation analysis, likely used for regulatory or operational purposes.

COSS CA DR-9 Attachment 1 Page 71 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 71 of 627 Start Time End Time ANL_MW 7/24/2019 5:00 7/24/2019 6:00 7/24/2019 6:00 7/24/2019 7:00 936.8 983.9 7/24/2019 7:00 7/24/2019 8:00 1087.7 7/24/2019 8:00 7/24/2019 9:00 1169.2 7/24/2019 9:00 7/24/2019...

AI summary This document presents a table of apparent net load (ANL_MW) values over time intervals on July 24-27, 2019. It appears to be related to energy usage monitoring or grid management, with data showing fluctuations in apparent net load throughout the day.

COSS CA DR-9 Attachment 1 Page 73 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 73 of 627 Start Time End Time ANL_MW 7/30/2019 1:00 7/30/2019 2:00 7/30/2019 2:00 7/30/2019 3:00 724.8 702.4 7/30/2019 3:00 7/30/2019 4:00 674.0 7/30/2019 4:00 7/30/2019 5:00 702.6 7/30/2019 5:00 7/30/2019 6:...

AI summary The document presents a table showing apparent net load in megawatts (ANL_MW) over various time intervals on July 30 and 31, 2019, and August 1, 2019. It appears to be part of a regulatory proceeding related to energy load data.

COSS CA DR-9 Attachment 1 Page 74 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 74 of 627 Start Time End Time ANL_MW 8/1/2019 23:00 8/2/2019 0:00 8/2/2019 0:00 8/2/2019 1:00 1014.2 941.0 8/2/2019 1:00 8/2/2019 2:00 872.3 8/2/2019 2:00 8/2/2019 3:00 870.5 8/2/2019 3:00 8/2/2019 4:00 878.3...

AI summary The text presents a table of apparent net load in megawatts (ANL_MW) over a series of time intervals from August 1, 2019, to August 4, 2019. It includes multiple entries with start and end times and corresponding ANL_MW values, indicating variations in energy demand over time.

COSS CA DR-9 Attachment 1 Page 75 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 75 of 627 Start Time End Time ANL_MW 8/4/2019 21:00 8/4/2019 22:00 1068.3 8/4/2019 22:00 8/4/2019 23:00 8/4/2019 23:00 8/5/2019 0:00 993.6 901.0 8/5/2019 0:00 8/5/2019 1:00 839.6 8/5/2019 1:00 8/5/2019 2:00 7...

AI summary The text presents a table containing time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values. It provides detailed data for a specific period in August 2019 and includes a reference to a partially confidential appendix from a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 76 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 76 of 627 Start Time End Time ANL_MW 8/7/2019 19:00 8/7/2019 20:00 8/7/2019 20:00 8/7/2019 21:00 1083.4 1039.8 8/7/2019 21:00 8/7/2019 22:00 1036.0 8/7/2019 22:00 8/7/2019 23:00 976.4 8/7/2019 23:00 8/8/2019...

AI summary The text presents a table of Apparent Net Load in Megawatts (ANL_MW) over various time intervals from August 7 to August 10, 2019. This data appears to be related to electricity demand or generation analysis, likely used for regulatory or planning purposes.

COSS CA DR-9 Attachment 1 Page 77 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 77 of 627 Start Time End Time ANL_MW 8/10/2019 17:00 8/10/2019 18:00 8/10/2019 18:00 8/10/2019 19:00 991.9 997.5 8/10/2019 19:00 8/10/2019 20:00 995.9 8/10/2019 20:00 8/10/2019 21:00 947.8 8/10/2019 21:00 8/1...

AI summary This document presents a table of Apparent Net Load (ANL_MW) values recorded between August 10, 2019, and August 13, 2019, showing fluctuations in load over specific time intervals. The data appears to be part of a regulatory proceeding related to energy demand and load management.

COSS CA DR-9 Attachment 1 Page 78 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 78 of 627 Start Time 8/13/2019 15:00 End Time 8/13/2019 16:00 ANL_MW 1017.1 8/13/2019 16:00 8/13/2019 17:00 1026.7 8/13/2019 17:00 8/13/2019 18:00 1048.3 8/13/2019 18:00 8/13/2019 19:00 1052.7 8/13/2019 19:00...

AI summary The document provides a table of Apparent Net Load in Megawatts (ANL_MW) over a series of time intervals from August 13, 2019, to August 16, 2019. The data shows fluctuations in load throughout the day, with peak values occurring during the early morning and late afternoon hours.

COSS CA DR-9 Attachment 1 Page 79 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 79 of 627 Start Time End Time ANL_MW 8/16/2019 13:00 8/16/2019 14:00 8/16/2019 14:00 8/16/2019 15:00 1092.5 1051.6 8/16/2019 15:00 8/16/2019 16:00 1029.3 8/16/2019 16:00 8/16/2019 17:00 1002.9 8/16/2019 17:00...

AI summary The text presents a table showing apparent net load in megawatts (ANL_MW) over various time intervals from August 16 to August 19, 2019. It appears to be part of a regulatory proceeding document, specifically related to evidence submission for a 2026-2027 GRA Direct Evidence Appendix.

COSS CA DR-9 Attachment 1 Page 80 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 80 of 627 Start Time End Time ANL_MW 8/19/2019 11:00 8/19/2019 12:00 8/19/2019 12:00 8/19/2019 13:00 1215.3 1147.8 8/19/2019 13:00 8/19/2019 14:00 1141.0 8/19/2019 14:00 8/19/2019 15:00 1090.8 8/19/2019 15:00...

AI summary This document contains a table listing apparent net load in megawatts (ANL_MW) over various time intervals from August 19 to August 22, 2019. The data appears to be related to electricity demand or generation analysis during that period.

COSS CA DR-9 Attachment 1 Page 83 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 83 of 627 Start Time 8/28/2019 5:00 End Time 8/28/2019 6:00 ANL_MW 606.1 8/28/2019 6:00 8/28/2019 7:00 680.7 8/28/2019 7:00 8/28/2019 8:00 818.2 8/28/2019 8:00 8/28/2019 9:00 969.1 8/28/2019 9:00 8/28/2019 10...

AI summary The document contains a table showing apparent net load (ANL_MW) values for various time intervals on August 28 to 31, 2019. These values represent the net electricity demand during specific hours, indicating fluctuations in energy usage over time.

COSS CA DR-9 Attachment 1 Page 84 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 84 of 627 Start Time 8/31/2019 3:00 End Time 8/31/2019 4:00 ANL_MW 711.1 8/31/2019 4:00 8/31/2019 5:00 739.6 8/31/2019 5:00 8/31/2019 6:00 756.6 8/31/2019 6:00 8/31/2019 7:00 816.4 8/31/2019 7:00 8/31/2019 8:...

AI summary This document contains a table showing the apparent net load in megawatts (ANL_MW) over a period of time, from August 31, 2019, to September 3, 2019, with data points recorded hourly. The data reflects fluctuations in energy demand throughout the day and night.

COSS CA DR-9 Attachment 1 Page 85 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 85 of 627 Start Time End Time ANL_MW 9/3/2019 1:00 9/3/2019 2:00 9/3/2019 2:00 9/3/2019 3:00 572.4 606.5 9/3/2019 3:00 9/3/2019 4:00 613.4 9/3/2019 4:00 9/3/2019 5:00 669.3 9/3/2019 5:00 9/3/2019 6:00 746.6 9...

AI summary The document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values for a specific period in September 2019. It appears to be related to energy load data, likely used for regulatory or planning purposes.

COSS CA DR-9 Attachment 1 Page 86 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 86 of 627 Start Time End Time ANL_MW 9/5/2019 23:00 9/6/2019 0:00 867.1 9/6/2019 0:00 9/6/2019 1:00 810.8 9/6/2019 1:00 9/6/2019 2:00 775.8 9/6/2019 2:00 9/6/2019 3:00 758.0 9/6/2019 3:00 9/6/2019 4:00 753.9...

AI summary The document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, showing fluctuations in electrical load over a 24-hour period on September 5-7, 2019. It provides detailed load data for analysis related to grid operations and energy management.

COSS CA DR-9 Attachment 1 Page 89 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 89 of 627 Start Time 9/14/2019 17:00 End Time 9/14/2019 18:00 ANL_MW 678.3 9/14/2019 18:00 9/14/2019 19:00 641.0 9/14/2019 19:00 9/14/2019 20:00 641.9 9/14/2019 20:00 9/14/2019 21:00 659.3 9/14/2019 21:00 9/1...

AI summary This document presents a table of apparent net load (ANL_MW) data recorded over multiple time intervals from September 14, 2019, to September 17, 2019. The data shows fluctuations in load throughout the day and night, with values ranging from a low of 489.1 ANL_MW to a high of 951.2 ANL_MW.

COSS CA DR-9 Attachment 1 Page 91 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 91 of 627 Start Time End Time ANL_MW 9/20/2019 13:00 9/20/2019 14:00 9/20/2019 14:00 9/20/2019 15:00 1030.5 1006.0 9/20/2019 15:00 9/20/2019 16:00 990.2 9/20/2019 16:00 9/20/2019 17:00 986.8 9/20/2019 17:00 9...

AI summary The table presents data on Apparent Net Load in Megawatts (ANL_MW) over a period of time, indicating fluctuations in load during specific hours on multiple days in September 2019. This data likely relates to electricity demand and supply patterns.

COSS CA DR-9 Attachment 1 Page 92 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 92 of 627 Start Time 9/23/2019 11:00 End Time 9/23/2019 12:00 ANL_MW 759.9 9/23/2019 12:00 9/23/2019 13:00 779.9 9/23/2019 13:00 9/23/2019 14:00 812.7 9/23/2019 14:00 9/23/2019 15:00 838.0 9/23/2019 15:00 9/2...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over a period of time from September 23 to September 26, 2019. The data shows fluctuations in the apparent net load during different time intervals, which may be relevant for analyzing electricity demand patterns and grid management.

COSS CA DR-9 Attachment 1 Page 93 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 93 of 627 Start Time End Time ANL_MW 9/26/2019 9:00 9/26/2019 10:00 9/26/2019 10:00 9/26/2019 11:00 1055.9 1028.6 9/26/2019 11:00 9/26/2019 12:00 1016.1 9/26/2019 12:00 9/26/2019 13:00 1015.2 9/26/2019 13:00...

AI summary The text presents a table of Apparent Net Load in Megawatts (ANL_MW) over multiple time intervals from September 26 to September 29, 2019, which could be relevant for analyzing electricity demand patterns or grid performance.

COSS CA DR-9 Attachment 1 Page 94 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 94 of 627 Start Time End Time ANL_MW 9/29/2019 7:00 9/29/2019 8:00 9/29/2019 8:00 9/29/2019 9:00 737.4 818.5 9/29/2019 9:00 9/29/2019 10:00 886.1 9/29/2019 10:00 9/29/2019 11:00 839.4 9/29/2019 11:00 9/29/201...

AI summary The document presents a table of apparent net load (ANL_MW) data over a period of time, showing fluctuations in load values from September 29, 2019, to October 2, 2019. This data likely represents energy demand or supply metrics relevant to a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 98 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 98 of 627 Start Time End Time ANL_MW 10/10/2019 23:00 10/11/2019 0:00 10/11/2019 0:00 10/11/2019 1:00 660.8 597.5 10/11/2019 1:00 10/11/2019 2:00 546.3 10/11/2019 2:00 10/11/2019 3:00 538.6 10/11/2019 3:00 10...

AI summary The text provides a table of apparent net load in megawatts (ANL_MW) over a period of time from October 10 to October 13, 2019. It includes start and end times for each interval and the corresponding ANL_MW values. The data appears to be part of a regulatory proceeding related to energy usage and load management.

COSS CA DR-9 Attachment 1 Page 99 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 99 of 627 Start Time 10/13/2019 21:00 End Time 10/13/2019 22:00 ANL_MW 892.0 10/13/2019 22:00 10/13/2019 23:00 844.9 10/13/2019 23:00 10/14/2019 0:00 797.6 10/14/2019 0:00 10/14/2019 1:00 10/14/2019 1:00 10/1...

AI summary The document presents a table of apparent net load in megawatts (ANL_MW) over a period from October 13, 2019, to October 16, 2019, showing fluctuations in load during different time intervals. It also references a partially confidential appendix from a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 100 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 100 of 627 Start Time End Time ANL_MW 10/16/2019 19:00 10/16/2019 20:00 10/16/2019 20:00 10/16/2019 21:00 1115.7 1048.2 10/16/2019 21:00 10/16/2019 22:00 934.4 10/16/2019 22:00 10/16/2019 23:00 785.8 10/16/20...

AI summary The text presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing electricity demand data over a period in October 2019. This data may be used for analysis related to grid management, generation planning, or regulatory proceedings.

COSS CA DR-9 Attachment 1 Page 101 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 101 of 627 Start Time End Time ANL_MW 10/19/2019 17:00 10/19/2019 18:00 10/19/2019 18:00 10/19/2019 19:00 876.9 904.4 10/19/2019 19:00 10/19/2019 20:00 902.1 10/19/2019 20:00 10/19/2019 21:00 858.5 10/19/2019...

AI summary The text provides a table showing apparent net load in megawatts (ANL_MW) over various time intervals from October 19 to October 22, 2019. It includes data points for different hours and dates, indicating fluctuations in energy demand during this period.

COSS CA DR-9 Attachment 1 Page 102 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 102 of 627 Start Time End Time ANL_MW 10/22/2019 15:00 10/22/2019 16:00 10/22/2019 16:00 10/22/2019 17:00 970.3 1028.7 10/22/2019 17:00 10/22/2019 18:00 1076.4 10/22/2019 18:00 10/22/2019 19:00 1082.7 10/22/2...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing electricity load data for a specific period in October 2019. This data may be used for analysis related to grid management, energy demand, or regulatory proceedings.

COSS CA DR-9 Attachment 1 Page 103 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 103 of 627 Start Time End Time ANL_MW 10/25/2019 13:00 10/25/2019 14:00 10/25/2019 14:00 10/25/2019 15:00 995.9 998.5 10/25/2019 15:00 10/25/2019 16:00 1015.4 10/25/2019 16:00 10/25/2019 17:00 1036.0 10/25/20...

AI summary This document presents a table of apparent net load (ANL_MW) values over specific time intervals from October 25 to October 28, 2019. The data reflects fluctuations in load during different hours, possibly related to energy demand or generation patterns.

COSS CA DR-9 Attachment 1 Page 104 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 104 of 627 Start Time End Time ANL_MW 10/28/2019 11:00 10/28/2019 12:00 10/28/2019 12:00 10/28/2019 13:00 1181.5 1155.7 10/28/2019 13:00 10/28/2019 14:00 1129.7 10/28/2019 14:00 10/28/2019 15:00 1101.1 10/28/...

AI summary The document presents a table containing time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to energy usage or generation patterns over a specific period from October 28 to October 31, 2019. This data may be used for analysis in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 105 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 105 of 627 Start Time End Time ANL_MW 10/31/2019 9:00 10/31/2019 10:00 10/31/2019 10:00 10/31/2019 11:00 889.5 864.9 10/31/2019 11:00 10/31/2019 12:00 857.5 10/31/2019 12:00 10/31/2019 13:00 819.4 10/31/2019...

AI summary The document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values. It appears to be part of a regulatory proceeding, possibly related to energy load management or system reliability.

COSS CA DR-9 Attachment 1 Page 106 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 106 of 627 Start Time End Time ANL_MW 11/3/2019 6:00 11/3/2019 7:00 11/3/2019 7:00 11/3/2019 8:00 974.8 1031.2 11/3/2019 8:00 11/3/2019 9:00 1087.3 11/3/2019 9:00 11/3/2019 10:00 1139.1 11/3/2019 10:00 11/3/2...

AI summary The text presents a table showing apparent net load (ANL_MW) values over time intervals on November 3 to November 6, 2019. It includes timestamps and corresponding ANL_MW values, which appear to be data points for energy load analysis.

COSS CA DR-9 Attachment 1 Page 107 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 107 of 627 Start Time End Time ANL_MW 11/6/2019 4:00 11/6/2019 5:00 11/6/2019 5:00 11/6/2019 6:00 591.0 683.9 11/6/2019 6:00 11/6/2019 7:00 751.1 11/6/2019 7:00 11/6/2019 8:00 890.0 11/6/2019 8:00 11/6/2019 9...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values. It appears to be technical data related to energy load management or grid operations, though no specific claims or arguments are made in the text.

COSS CA DR-9 Attachment 1 Page 109 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 109 of 627 Start Time End Time ANL_MW 11/12/2019 0:00 11/12/2019 1:00 11/12/2019 1:00 11/12/2019 2:00 967.3 830.3 11/12/2019 2:00 11/12/2019 3:00 749.1 11/12/2019 3:00 11/12/2019 4:00 699.7 11/12/2019 4:00 11...

AI summary This document provides a table of apparent net load in megawatts (ANL_MW) over a period from November 12, 2019, to November 14, 2019, showing fluctuations in load during different time intervals. The data appears to be part of a regulatory proceeding and may be used to assess energy demand patterns.

COSS CA DR-9 Attachment 1 Page 110 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 110 of 627 Start Time End Time ANL_MW 11/14/2019 22:00 11/14/2019 23:00 11/14/2019 23:00 11/15/2019 0:00 1083.3 976.1 11/15/2019 0:00 11/15/2019 1:00 948.6 11/15/2019 1:00 11/15/2019 2:00 895.7 11/15/2019 2:0...

AI summary The document presents a table of Apparent Net Load (ANL_MW) values over various time intervals from November 14 to November 17, 2019. These values are likely related to electricity demand or generation, and the data is part of a regulatory proceeding document, possibly for analysis in a rate or resource planning context.

COSS CA DR-9 Attachment 1 Page 111 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 111 of 627 Start Time End Time ANL_MW 11/17/2019 20:00 11/17/2019 21:00 11/17/2019 21:00 11/17/2019 22:00 1380.9 1301.1 11/17/2019 22:00 11/17/2019 23:00 1183.5 11/17/2019 23:00 11/18/2019 0:00 1098.8 11/18/2...

AI summary This document contains a table with timestamps and Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy load data over a specific period. The data is presented in a structured format with start and end times for each interval, and the corresponding ANL_MW values. This appears to be part of a regulatory proceeding related to energy load management or system reliability.

COSS CA DR-9 Attachment 1 Page 112 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 112 of 627 Start Time End Time ANL_MW 11/20/2019 18:00 11/20/2019 19:00 11/20/2019 19:00 11/20/2019 20:00 1146.7 1099.5 11/20/2019 20:00 11/20/2019 21:00 1077.9 11/20/2019 21:00 11/20/2019 22:00 1033.5 11/20/...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over various time intervals from November 20 to November 23, 2019. It provides detailed data on energy load fluctuations during specific hours, which could be used for analyzing electricity demand patterns.

COSS CA DR-9 Attachment 1 Page 113 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 113 of 627 Start Time End Time ANL_MW 11/23/2019 16:00 11/23/2019 17:00 11/23/2019 17:00 11/23/2019 18:00 1003.1 1111.2 11/23/2019 18:00 11/23/2019 19:00 1078.3 11/23/2019 19:00 11/23/2019 20:00 1068.4 11/23/...

AI summary This document contains a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from November 23, 2019, to November 26, 2019. The data reflects fluctuations in energy demand across different times of the day and night.

COSS CA DR-9 Attachment 1 Page 114 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 114 of 627 Start Time End Time ANL_MW 11/26/2019 14:00 11/26/2019 15:00 11/26/2019 15:00 11/26/2019 16:00 979.5 1046.4 11/26/2019 16:00 11/26/2019 17:00 1140.6 11/26/2019 17:00 11/26/2019 18:00 1209.8 11/26/2...

AI summary This document contains a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy load data for a specific period in late 2019. It also includes a partially confidential appendix from a regulatory proceeding, indicating the presence of sensitive information.

COSS CA DR-9 Attachment 1 Page 115 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 115 of 627 Start Time End Time ANL_MW 11/29/2019 12:00 11/29/2019 13:00 11/29/2019 13:00 11/29/2019 14:00 1071.1 1076.3 11/29/2019 14:00 11/29/2019 15:00 1082.0 11/29/2019 15:00 11/29/2019 16:00 1127.0 11/29/...

AI summary The document presents a table showing apparent net load in megawatts (ANL_MW) over specific time intervals from November 29, 2019, to December 2, 2019. It appears to be part of a regulatory proceeding involving energy load data analysis.

COSS CA DR-9 Attachment 1 Page 116 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 116 of 627 Start Time End Time ANL_MW 12/2/2019 10:00 12/2/2019 11:00 12/2/2019 11:00 12/2/2019 12:00 1492.5 1487.7 12/2/2019 12:00 12/2/2019 13:00 1458.0 12/2/2019 13:00 12/2/2019 14:00 1395.3 12/2/2019 14:0...

AI summary This document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to energy demand analysis. The data spans multiple days in December 2019 and is part of a regulatory proceeding document, though the specific context or purpose of the analysis is not explicitly stated.

COSS CA DR-9 Attachment 1 Page 117 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 117 of 627 Start Time End Time ANL_MW 12/5/2019 8:00 12/5/2019 9:00 12/5/2019 9:00 12/5/2019 10:00 1490.4 1456.5 12/5/2019 10:00 12/5/2019 11:00 1434.4 12/5/2019 11:00 12/5/2019 12:00 1405.3 12/5/2019 12:00 1...

AI summary This document presents a table showing apparent net load (ANL_MW) over specific time intervals on December 5, 2019, through December 8, 2019, with values fluctuating across the period. The data appears to be part of a regulatory proceeding related to energy load analysis.

COSS CA DR-9 Attachment 1 Page 118 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 118 of 627 Start Time End Time ANL_MW 12/8/2019 6:00 12/8/2019 7:00 12/8/2019 7:00 12/8/2019 8:00 1311.1 1323.3 12/8/2019 8:00 12/8/2019 9:00 1430.6 12/8/2019 9:00 12/8/2019 10:00 1440.6 12/8/2019 10:00 12/8/...

AI summary This document provides a table of apparent net load in megawatts (ANL_MW) over a series of time intervals from December 8, 2019, to December 11, 2019. The data reflects variations in electricity demand across different hours, highlighting fluctuations in apparent net load.

COSS CA DR-9 Attachment 1 Page 119 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 119 of 627 Start Time End Time ANL_MW 12/11/2019 4:00 12/11/2019 5:00 12/11/2019 5:00 12/11/2019 6:00 769.3 822.4 12/11/2019 6:00 12/11/2019 7:00 987.0 12/11/2019 7:00 12/11/2019 8:00 1080.0 12/11/2019 8:00 1...

AI summary This table presents Apparent Net Load (ANL_MW) data over specific time intervals from December 11, 2019, to December 14, 2019, showing fluctuations in load values across different hours. The data appears to be part of a regulatory proceeding related to energy management and load planning.

COSS CA DR-9 Attachment 1 Page 120 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 120 of 627 Start Time End Time ANL_MW 12/14/2019 2:00 12/14/2019 3:00 12/14/2019 3:00 12/14/2019 4:00 998.7 963.1 12/14/2019 4:00 12/14/2019 5:00 935.9 12/14/2019 5:00 12/14/2019 6:00 923.6 12/14/2019 6:00 12...

AI summary This document presents a table of Apparent Net Load (ANL_MW) values across multiple time intervals on December 14, 2019, through December 17, 2019. The data shows fluctuations in load over time, with peak values observed during certain hours and lower values during others.

COSS CA DR-9 Attachment 1 Page 121 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 121 of 627 Start Time End Time ANL_MW 12/17/2019 0:00 12/17/2019 1:00 12/17/2019 1:00 12/17/2019 2:00 933.4 901.7 12/17/2019 2:00 12/17/2019 3:00 891.3 12/17/2019 3:00 12/17/2019 4:00 922.4 12/17/2019 4:00 12...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over a period of time from December 17, 2019, to December 19, 2019, showing fluctuations in load during different time intervals. The data appears to be part of a regulatory proceeding, likely related to energy generation or distribution.

COSS CA DR-9 Attachment 1 Page 122 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 122 of 627 Start Time End Time ANL_MW 12/19/2019 22:00 12/19/2019 23:00 12/19/2019 23:00 12/20/2019 0:00 1310.7 1260.9 12/20/2019 0:00 12/20/2019 1:00 1212.1 12/20/2019 1:00 12/20/2019 2:00 1167.8 12/20/2019...

AI summary The text provides a table of Apparent Net Load in Megawatts (ANL_MW) over a period of time in December 2019. This appears to be data related to electricity demand or generation, likely used for regulatory or planning purposes.

COSS CA DR-9 Attachment 1 Page 124 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 124 of 627 Start Time End Time ANL_MW 12/25/2019 18:00 12/25/2019 19:00 12/25/2019 19:00 12/25/2019 20:00 1294.9 1277.1 12/25/2019 20:00 12/25/2019 21:00 1274.3 12/25/2019 21:00 12/25/2019 22:00 1258.7 12/25/...

AI summary The document presents a table showing the Apparent Net Load (ANL_MW) over various time intervals from December 25, 2019, to December 28, 2019. The data reflects fluctuations in electricity demand during this period, with specific values recorded for each hour or half-hour interval.

COSS CA DR-9 Attachment 1 Page 125 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 125 of 627 Start Time End Time ANL_MW 12/28/2019 16:00 12/28/2019 17:00 12/28/2019 17:00 12/28/2019 18:00 1116.8 1254.6 12/28/2019 18:00 12/28/2019 19:00 1217.9 12/28/2019 19:00 12/28/2019 20:00 1161.6 12/28/...

AI summary This document presents a table of apparent net load (ANL_MW) values over time from December 28, 2019, to December 31, 2019. The data shows fluctuations in load during different time intervals, which could be relevant to grid management and energy planning.

COSS CA DR-9 Attachment 1 Page 126 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 126 of 627 Start Time End Time ANL_MW 12/31/2019 14:00 12/31/2019 15:00 12/31/2019 15:00 12/31/2019 16:00 1143.6 1130.2 12/31/2019 16:00 12/31/2019 17:00 1160.7 12/31/2019 17:00 12/31/2019 18:00 1215.1 12/31/...

AI summary The text provides a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from December 31, 2019, to January 3, 2020. The data reflects fluctuations in load demand during these periods.

COSS CA DR-9 Attachment 1 Page 127 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 127 of 627 Start Time End Time ANL_MW 1/3/2020 12:00 1/3/2020 13:00 1467.0 1/3/2020 13:00 1/3/2020 14:00 1/3/2020 14:00 1/3/2020 15:00 1422.3 1398.7 1/3/2020 15:00 1/3/2020 16:00 1419.2 1/3/2020 16:00 1/3/202...

AI summary This document contains a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from January 3, 2020, to January 6, 2020. The data reflects fluctuations in electricity demand during specific hours, which may be relevant for grid management and planning.

COSS CA DR-9 Attachment 1 Page 128 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 128 of 627 Start Time End Time ANL_MW 1/6/2020 10:00 1/6/2020 11:00 1/6/2020 11:00 1/6/2020 12:00 1557.7 1573.5 1/6/2020 12:00 1/6/2020 13:00 1590.1 1/6/2020 13:00 1/6/2020 14:00 1584.9 1/6/2020 14:00 1/6/202...

AI summary The document provides a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing data from a regulatory proceeding related to energy load management or grid operations in Nova Scotia.

COSS CA DR-9 Attachment 1 Page 129 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 129 of 627 Start Time End Time ANL_MW 1/9/2020 8:00 1/9/2020 9:00 1/9/2020 9:00 1/9/2020 10:00 1277.7 1260.5 1/9/2020 10:00 1/9/2020 11:00 1242.1 1/9/2020 11:00 1/9/2020 12:00 1235.0 1/9/2020 12:00 1/9/2020 1...

AI summary This document provides a table of apparent net load in megawatts (ANL_MW) over various time intervals from January 9, 2020, to January 12, 2020. It appears to be part of a regulatory proceeding, possibly related to energy generation and grid management.

COSS CA DR-9 Attachment 1 Page 130 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 130 of 627 Start Time End Time ANL_MW 1/12/2020 6:00 1/12/2020 7:00 1/12/2020 7:00 1/12/2020 8:00 979.8 1077.7 1/12/2020 8:00 1/12/2020 9:00 1201.9 1/12/2020 9:00 1/12/2020 10:00 1351.7 1/12/2020 10:00 1/12/2...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) across multiple time intervals on January 12th to January 15th, 2020. The data reflects variations in electricity demand over time, with specific values recorded for each hour or half-hour interval.

COSS CA DR-9 Attachment 1 Page 131 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 131 of 627 Start Time End Time ANL_MW 1/15/2020 4:00 1/15/2020 5:00 1/15/2020 5:00 1/15/2020 6:00 1418.4 1459.7 1/15/2020 6:00 1/15/2020 7:00 1591.8 1/15/2020 7:00 1/15/2020 8:00 1628.4 1/15/2020 8:00 1/15/20...

AI summary This document provides a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from January 15, 2020, to January 18, 2020. The data is presented in a structured format with start and end times and corresponding ANL_MW values.

COSS CA DR-9 Attachment 1 Page 132 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 132 of 627 Start Time End Time ANL_MW 1/18/2020 2:00 1/18/2020 3:00 1/18/2020 3:00 1/18/2020 4:00 1444.7 1440.4 1/18/2020 4:00 1/18/2020 5:00 1446.2 1/18/2020 5:00 1/18/2020 6:00 1483.9 1/18/2020 6:00 1/18/20...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over a series of time intervals from January 18 to January 21, 2020. The data reflects fluctuations in energy demand during these periods, providing a detailed view of load patterns.

COSS CA DR-9 Attachment 1 Page 133 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 133 of 627 Start Time End Time ANL_MW 1/21/2020 0:00 1/21/2020 1:00 1/21/2020 1:00 1/21/2020 2:00 1365.1 1354.7 1/21/2020 2:00 1/21/2020 3:00 1354.2 1/21/2020 3:00 1/21/2020 4:00 1330.3 1/21/2020 4:00 1/21/20...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over a period of time from January 21, 2020, to January 23, 2020. It details the start and end times for each interval and the corresponding ANL_MW values, providing data for analysis and regulatory proceedings.

COSS CA DR-9 Attachment 1 Page 136 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 136 of 627 Start Time End Time ANL_MW 1/29/2020 18:00 1/29/2020 19:00 1/29/2020 19:00 1/29/2020 20:00 1494.3 1494.6 1/29/2020 20:00 1/29/2020 21:00 1474.2 1/29/2020 21:00 1/29/2020 22:00 1391.7 1/29/2020 22:0...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over various time intervals from January 29 to February 1, 2020. The data shows fluctuations in load throughout the day, with peaks and troughs recorded at different times. The information appears to be part of a regulatory proceeding related to energy load management.

COSS CA DR-9 Attachment 1 Page 137 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 137 of 627 Start Time End Time ANL_MW 2/1/2020 16:00 2/1/2020 17:00 1552.5 2/1/2020 17:00 2/1/2020 18:00 2/1/2020 18:00 2/1/2020 19:00 1566.2 1537.3 2/1/2020 19:00 2/1/2020 20:00 1520.2 2/1/2020 20:00 2/1/202...

AI summary This document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, indicating the load data for a specific period in February 2020. The data is part of a regulatory proceeding and appears in a partially confidential appendix.

COSS CA DR-9 Attachment 1 Page 138 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 138 of 627 Start Time End Time ANL_MW 2/4/2020 14:00 2/4/2020 15:00 1277.0 2/4/2020 15:00 2/4/2020 16:00 2/4/2020 16:00 2/4/2020 17:00 1357.8 1454.8 2/4/2020 17:00 2/4/2020 18:00 1531.1 2/4/2020 18:00 2/4/202...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing electricity demand data over a specific period in early February 2020. It includes a partially confidential section from a regulatory proceeding, indicating that some information has been redacted.

COSS CA DR-9 Attachment 1 Page 139 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 139 of 627 Start Time End Time ANL_MW 2/7/2020 12:00 2/7/2020 13:00 1694.5 2/7/2020 13:00 2/7/2020 14:00 2/7/2020 14:00 2/7/2020 15:00 1682.6 1620.6 2/7/2020 15:00 2/7/2020 16:00 1602.0 2/7/2020 16:00 2/7/202...

AI summary This document presents a table showing the apparent net load (ANL_MW) over a period of time from February 7, 2020, to February 10, 2020, with timestamps and corresponding values. The data appears to be related to electricity demand or supply analysis.

COSS CA DR-9 Attachment 1 Page 140 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 140 of 627 Start Time End Time ANL_MW 2/10/2020 10:00 2/10/2020 11:00 2/10/2020 11:00 2/10/2020 12:00 1271.3 1261.2 2/10/2020 12:00 2/10/2020 13:00 1252.4 2/10/2020 13:00 2/10/2020 14:00 1236.9 2/10/2020 14:0...

AI summary The text presents a table showing apparent net load (ANL_MW) values over specific time intervals from February 10 to February 13, 2020. These values represent the apparent net load in megawatts during different time periods, which may be relevant for analyzing energy demand patterns or grid performance.

COSS CA DR-9 Attachment 1 Page 141 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 141 of 627 Start Time End Time ANL_MW 2/13/2020 8:00 2/13/2020 9:00 2/13/2020 9:00 2/13/2020 10:00 1314.1 1361.6 2/13/2020 10:00 2/13/2020 11:00 1443.0 2/13/2020 11:00 2/13/2020 12:00 1505.3 2/13/2020 12:00 2...

AI summary The text provides a table of apparent net load in megawatts (ANL_MW) over various time intervals from February 13 to February 16, 2020. It shows fluctuations in energy demand throughout the day and night, with peak loads occurring during the early morning and late afternoon hours.

COSS CA DR-9 Attachment 1 Page 144 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 144 of 627 Start Time End Time ANL_MW 2/22/2020 2:00 2/22/2020 3:00 1193.8 2/22/2020 3:00 2/22/2020 4:00 2/22/2020 4:00 2/22/2020 5:00 1162.7 1129.0 2/22/2020 5:00 2/22/2020 6:00 1135.8 2/22/2020 6:00 2/22/20...

AI summary The text presents a table of apparent net load in megawatts (ANL_MW) over multiple time intervals on February 22-24, 2020. It includes data points for various hours and is labeled as a partially confidential appendix from a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 145 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 145 of 627 Start Time End Time ANL_MW 2/25/2020 0:00 2/25/2020 1:00 2/25/2020 1:00 2/25/2020 2:00 962.8 950.0 2/25/2020 2:00 2/25/2020 3:00 951.0 2/25/2020 3:00 2/25/2020 4:00 986.1 2/25/2020 4:00 2/25/2020 5...

AI summary This document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely used for analyzing energy demand patterns over a specific period. The data spans from February 25, 2020, to February 27, 2020, and is part of a regulatory proceeding document.

COSS CA DR-9 Attachment 1 Page 168 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 168 of 627 Start Time End Time ANL_MW 5/2/2020 3:00 5/2/2020 4:00 507.5 5/2/2020 4:00 5/2/2020 5:00 558.6 5/2/2020 5:00 5/2/2020 6:00 639.7 5/2/2020 6:00 5/2/2020 7:00 746.7 5/2/2020 7:00 5/2/2020 8:00 838.5...

AI summary This document contains a table listing the start and end times along with ANL_MW values for May 2, 2020, and May 3, 2020. The data appears to represent energy demand or load measurements over specific time intervals.

COSS CA DR-9 Attachment 1 Page 174 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 174 of 627 Start Time End Time ANL_MW 5/19/2020 15:00 5/19/2020 16:00 640.9 5/19/2020 16:00 5/19/2020 17:00 691.8 5/19/2020 17:00 5/19/2020 18:00 735.9 5/19/2020 18:00 5/19/2020 19:00 756.5 5/19/2020 19:00 5/...

AI summary This document contains a table with timestamps and corresponding ANL_MW values, likely representing energy demand or generation data over a 24-hour period on May 19 and May 20, 2020. The data appears to be related to grid operations and load management.

COSS CA DR-9 Attachment 1 Page 183 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 183 of 627 Start Time End Time ANL_MW 6/14/2020 21:00 6/14/2020 22:00 6/14/2020 22:00 6/14/2020 23:00 940.0 893.5 6/14/2020 23:00 6/15/2020 0:00 814.7 6/15/2020 0:00 6/15/2020 1:00 771.1 6/15/2020 1:00 6/15/2...

AI summary The text presents a table of time intervals and corresponding ANL_MW values, which likely represent energy demand or load data over a specific period. This data could be used for analyzing energy consumption patterns or planning grid operations.

COSS CA DR-9 Attachment 1 Page 184 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 184 of 627 Start Time End Time ANL_MW 6/17/2020 19:00 6/17/2020 20:00 6/17/2020 20:00 6/17/2020 21:00 933.2 905.5 6/17/2020 21:00 6/17/2020 22:00 836.1 6/17/2020 22:00 6/17/2020 23:00 708.1 6/17/2020 23:00 6/...

AI summary The text presents a table containing data on energy demand (ANL_MW) over a period of time from June 17, 2020, to June 20, 2020. It includes start and end times for each interval and corresponding energy demand values. This data may be relevant to energy generation, grid management, and resource planning.

COSS CA DR-9 Attachment 1 Page 203 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 203 of 627 Start Time End Time ANL_MW 8/12/2020 5:00 8/12/2020 6:00 8/12/2020 6:00 8/12/2020 7:00 693.6 756.9 8/12/2020 7:00 8/12/2020 8:00 750.5 8/12/2020 8:00 8/12/2020 9:00 833.6 8/12/2020 9:00 8/12/2020 1...

AI summary The document presents a table of energy demand data (ANL_MW) recorded on August 12-15, 2020, showing fluctuations in megawatt usage over specific time intervals. It also references a partially confidential appendix from a regulatory proceeding related to GRA (likely a specific program or initiative).

COSS CA DR-9 Attachment 1 Page 214 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 214 of 627 Start Time End Time ANL_MW 9/13/2020 7:00 9/13/2020 8:00 776.3 9/13/2020 8:00 9/13/2020 9:00 912.6 9/13/2020 9:00 9/13/2020 10:00 982.5 9/13/2020 10:00 9/13/2020 11:00 977.7 9/13/2020 11:00 9/13/20...

AI summary The text presents a table with timestamps and corresponding ANL_MW values, likely representing energy generation or load data over a specific period on September 13-15, 2020. This data may be relevant for analyzing energy production, consumption, or grid performance.

COSS CA DR-9 Attachment 1 Page 216 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 216 of 627 Start Time End Time ANL_MW 9/19/2020 3:00 9/19/2020 4:00 9/19/2020 4:00 9/19/2020 5:00 527.4 533.4 9/19/2020 5:00 9/19/2020 6:00 556.4 9/19/2020 6:00 9/19/2020 7:00 609.1 9/19/2020 7:00 9/19/2020 8...

AI summary The document presents a table with start and end times along with corresponding ANL_MW values, likely representing energy demand or generation data over a period from September 19 to September 22, 2020. The table is part of a regulatory proceeding document and includes a partially confidential appendix.

COSS CA DR-9 Attachment 1 Page 223 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 223 of 627 Start Time End Time ANL_MW 10/9/2020 13:00 10/9/2020 14:00 10/9/2020 14:00 10/9/2020 15:00 683.9 652.4 10/9/2020 15:00 10/9/2020 16:00 652.8 10/9/2020 16:00 10/9/2020 17:00 732.7 10/9/2020 17:00 10...

AI summary This document presents a table showing the start and end times of various intervals along with corresponding ANL_MW values, likely representing energy demand or generation data over a period from October 9, 2020, to October 12, 2020. The data appears to be part of a regulatory proceeding, possibly related to energy usage analysis or infrastructure planning.

COSS CA DR-9 Attachment 1 Page 226 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 226 of 627 Start Time End Time ANL_MW 10/18/2020 7:00 10/18/2020 8:00 10/18/2020 8:00 10/18/2020 9:00 771.7 899.9 10/18/2020 9:00 10/18/2020 10:00 965.9 10/18/2020 10:00 10/18/2020 11:00 1051.1 10/18/2020 11:...

AI summary The document contains a table with time-stamped data showing the Apparent Net Load in Megawatts (ANL_MW) over a period from October 18 to October 21, 2020. This data likely relates to electricity demand or generation load profiles during that time frame.

COSS CA DR-9 Attachment 1 Page 229 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 229 of 627 Start Time End Time ANL_MW 10/27/2020 1:00 10/27/2020 2:00 10/27/2020 2:00 10/27/2020 3:00 743.8 681.8 10/27/2020 3:00 10/27/2020 4:00 654.0 10/27/2020 4:00 10/27/2020 5:00 693.4 10/27/2020 5:00 10...

AI summary The document presents a table of Apparent Net Load in Megawatts (ANL_MW) over multiple time intervals from October 27 to October 29, 2020. The data reflects variations in load demand across different hours, with specific values recorded for each time period.

COSS CA DR-9 Attachment 1 Page 230 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 230 of 627 Start Time End Time ANL_MW 10/29/2020 23:00 10/30/2020 0:00 10/30/2020 0:00 10/30/2020 1:00 998.0 927.8 10/30/2020 1:00 10/30/2020 2:00 872.3 10/30/2020 2:00 10/30/2020 3:00 793.2 10/30/2020 3:00 1...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy load data over a period from October 29, 2020, to November 1, 2020. This data may be used for analysis related to energy generation, grid operations, or resource planning.

COSS CA DR-9 Attachment 1 Page 231 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 231 of 627 Start Time End Time ANL_MW 11/1/2020 20:00 11/1/2020 21:00 11/1/2020 21:00 11/1/2020 22:00 758.7 686.5 11/1/2020 22:00 11/1/2020 23:00 620.0 11/1/2020 23:00 11/2/2020 0:00 573.2 11/2/2020 0:00 11/2...

AI summary This document presents a table of apparent net load (ANL_MW) data for various time intervals from November 1, 2020, to November 4, 2020. It appears to be a technical dataset related to energy load management and grid operations.

COSS CA DR-9 Attachment 1 Page 232 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 232 of 627 Start Time End Time ANL_MW 11/4/2020 18:00 11/4/2020 19:00 11/4/2020 19:00 11/4/2020 20:00 1537.7 1469.1 11/4/2020 20:00 11/4/2020 21:00 1408.8 11/4/2020 21:00 11/4/2020 22:00 1315.1 11/4/2020 22:0...

AI summary The document presents a table showing the Apparent Net Load (ANL_MW) over various time intervals from November 4, 2020, to November 7, 2020. The data reflects fluctuations in load demand across multiple time periods, likely used for analysis in a regulatory proceeding related to energy management.

COSS CA DR-9 Attachment 1 Page 233 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 233 of 627 Start Time End Time ANL_MW 11/7/2020 16:00 11/7/2020 17:00 11/7/2020 17:00 11/7/2020 18:00 1042.7 1141.5 11/7/2020 18:00 11/7/2020 19:00 1113.6 11/7/2020 19:00 11/7/2020 20:00 1081.3 11/7/2020 20:0...

AI summary The document contains a table with timestamps and Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy usage data over a specific period. This data may be used for regulatory analysis or decision-making processes in Nova Scotia.

COSS CA DR-9 Attachment 1 Page 235 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 235 of 627 Start Time End Time ANL_MW 11/13/2020 12:00 11/13/2020 13:00 11/13/2020 13:00 11/13/2020 14:00 1198.1 1186.8 11/13/2020 14:00 11/13/2020 15:00 1164.2 11/13/2020 15:00 11/13/2020 16:00 1173.2 11/13/...

AI summary This document contains a table showing the apparent net load in megawatts (ANL_MW) over various time intervals on November 13th to 16th, 2020. The data represents the load on the electricity grid during these periods, which is relevant for energy planning and resource management.

COSS CA DR-9 Attachment 1 Page 236 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 236 of 627 Start Time End Time ANL_MW 11/16/2020 10:00 11/16/2020 11:00 11/16/2020 11:00 11/16/2020 12:00 1022.3 987.1 11/16/2020 12:00 11/16/2020 13:00 922.1 11/16/2020 13:00 11/16/2020 14:00 930.7 11/16/202...

AI summary The document contains a table showing apparent net load in megawatts (ANL_MW) over various time intervals from November 16 to November 19, 2020. The data reflects fluctuations in load demand, likely related to energy generation and consumption patterns.

COSS CA DR-9 Attachment 1 Page 237 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 237 of 627 Start Time End Time ANL_MW 11/19/2020 8:00 11/19/2020 9:00 11/19/2020 9:00 11/19/2020 10:00 1340.4 1317.9 11/19/2020 10:00 11/19/2020 11:00 1276.5 11/19/2020 11:00 11/19/2020 12:00 1229.6 11/19/202...

AI summary This document contains a table of apparent net load (ANL_MW) measurements over a period of time in November and December 2020. The data shows fluctuations in load during different time intervals, which could be relevant to energy generation, grid management, and resource planning.

COSS CA DR-9 Attachment 1 Page 238 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 238 of 627 Start Time End Time ANL_MW 11/22/2020 6:00 11/22/2020 7:00 11/22/2020 7:00 11/22/2020 8:00 1106.5 1191.9 11/22/2020 8:00 11/22/2020 9:00 1289.4 11/22/2020 9:00 11/22/2020 10:00 1352.5 11/22/2020 10...

AI summary This document contains a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from November 22 to November 25, 2020. The data reflects fluctuations in electricity demand across different hours of the day, with specific values recorded for each time period.

COSS CA DR-9 Attachment 1 Page 239 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 239 of 627 Start Time End Time ANL_MW 11/25/2020 4:00 11/25/2020 5:00 11/25/2020 5:00 11/25/2020 6:00 1241.0 1285.9 11/25/2020 6:00 11/25/2020 7:00 1432.7 11/25/2020 7:00 11/25/2020 8:00 1547.2 11/25/2020 8:0...

AI summary The text presents a table of Apparent Net Load (ANL_MW) values over specific time intervals from November 25, 2020, to November 28, 2020. The data appears to be related to electricity demand or load management, likely used for analysis in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 240 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 240 of 627 Start Time End Time ANL_MW 11/28/2020 2:00 11/28/2020 3:00 11/28/2020 3:00 11/28/2020 4:00 970.5 967.3 11/28/2020 4:00 11/28/2020 5:00 968.2 11/28/2020 5:00 11/28/2020 6:00 1009.7 11/28/2020 6:00 1...

AI summary The document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to energy usage or generation over a specific period in late November and early December 2020.

COSS CA DR-9 Attachment 1 Page 241 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 241 of 627 Start Time End Time ANL_MW 12/1/2020 0:00 12/1/2020 1:00 12/1/2020 1:00 12/1/2020 2:00 813.7 776.2 12/1/2020 2:00 12/1/2020 3:00 754.9 12/1/2020 3:00 12/1/2020 4:00 739.4 12/1/2020 4:00 12/1/2020 5...

AI summary The document presents a table showing the Apparent Net Load in Megawatts (ANL_MW) for various time intervals on December 1, 2020, and December 2, 2020, indicating fluctuations in electricity demand over time.

COSS CA DR-9 Attachment 1 Page 242 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 242 of 627 Start Time End Time ANL_MW 12/3/2020 22:00 12/3/2020 23:00 1068.9 12/3/2020 23:00 12/4/2020 0:00 1011.9 12/4/2020 0:00 12/4/2020 1:00 954.1 12/4/2020 1:00 12/4/2020 2:00 923.2 12/4/2020 2:00 12/4/2...

AI summary This document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy load data over a specific period in December 2020.

COSS CA DR-9 Attachment 1 Page 255 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 255 of 627 Start Time End Time ANL_MW 1/10/2021 20:00 1/10/2021 21:00 1408.7 1/10/2021 21:00 1/10/2021 22:00 1350.6 1/10/2021 22:00 1/10/2021 23:00 1221.6 1/10/2021 23:00 1/11/2021 0:00 1185.0 1/11/2021 0:00...

AI summary The document presents a table with timestamps and Apparent Net Load in Megawatts (ANL_MW) values, providing data on load fluctuations over a period of time in early 2021. This data may be used for analyzing energy demand patterns.

COSS CA DR-9 Attachment 1 Page 258 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 258 of 627 Start Time End Time ANL_MW 1/19/2021 14:00 1/19/2021 15:00 1/19/2021 15:00 1/19/2021 16:00 1131.3 1157.5 1/19/2021 16:00 1/19/2021 17:00 1241.3 1/19/2021 17:00 1/19/2021 18:00 1413.7 1/19/2021 18:0...

AI summary This document presents a table showing the start and end times of events along with corresponding ANL_MW values, likely representing energy demand or generation data over a specific period in January 2021. The data spans multiple days and hours, indicating potential usage or capacity metrics for analysis.

COSS CA DR-9 Attachment 1 Page 268 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 268 of 627 Start Time End Time ANL_MW 2/17/2021 18:00 2/17/2021 19:00 2/17/2021 19:00 2/17/2021 20:00 1346.0 1317.6 2/17/2021 20:00 2/17/2021 21:00 1273.3 2/17/2021 21:00 2/17/2021 22:00 1198.8 2/17/2021 22:0...

AI summary The text presents a table of data showing the start and end times along with corresponding ANL_MW values, likely representing energy demand or generation levels over a period from February 17, 2021, to February 20, 2021. The data appears to be part of a regulatory proceeding and includes a partially confidential appendix.

COSS CA DR-9 Attachment 1 Page 271 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 271 of 627 Start Time End Time ANL_MW 2/26/2021 12:00 2/26/2021 13:00 1276.2 2/26/2021 13:00 2/26/2021 14:00 1203.8 2/26/2021 14:00 2/26/2021 15:00 1128.1 2/26/2021 15:00 2/26/2021 16:00 1157.5 2/26/2021 16:0...

AI summary The text presents a table with timestamps and corresponding ANL_MW values, likely representing energy load data over a specific period in February 2021. It provides detailed load measurements at hourly intervals, which may be used for grid planning or operational analysis.

COSS CA DR-9 Attachment 1 Page 281 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 281 of 627 Start Time End Time ANL_MW 3/27/2021 17:00 3/27/2021 18:00 3/27/2021 18:00 3/27/2021 19:00 1243.6 1271.6 3/27/2021 19:00 3/27/2021 20:00 1338.6 3/27/2021 20:00 3/27/2021 21:00 1391.9 3/27/2021 21:0...

AI summary The text presents a table of apparent net load (ANL_MW) values over time, spanning March 27 to March 30, 2021. The data reflects fluctuations in apparent net load during specific time intervals, likely related to electricity demand or generation.

COSS CA DR-9 Attachment 1 Page 282 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 282 of 627 Start Time End Time ANL_MW 3/30/2021 15:00 3/30/2021 16:00 3/30/2021 16:00 3/30/2021 17:00 1161.3 1199.3 3/30/2021 17:00 3/30/2021 18:00 1218.0 3/30/2021 18:00 3/30/2021 19:00 1219.4 3/30/2021 19:0...

AI summary This document provides a table of apparent net load (ANL_MW) data over a series of time intervals from March 30, 2021, to April 2, 2021. The data reflects fluctuations in electricity demand during specific hours, with values recorded at various times throughout the day.

COSS CA DR-9 Attachment 1 Page 283 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 283 of 627 Start Time End Time ANL_MW 4/2/2021 13:00 4/2/2021 14:00 1240.0 4/2/2021 14:00 4/2/2021 15:00 1244.4 4/2/2021 15:00 4/2/2021 16:00 1258.6 4/2/2021 16:00 4/2/2021 17:00 1304.2 4/2/2021 17:00 4/2/202...

AI summary The text presents a table showing apparent net load (ANL_MW) values over time on April 2, 2021, and April 3, 2021, indicating fluctuations in energy demand during specific time intervals.

COSS CA DR-9 Attachment 1 Page 284 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 284 of 627 Start Time End Time ANL_MW 4/5/2021 11:00 4/5/2021 12:00 4/5/2021 12:00 4/5/2021 13:00 1225.3 1227.6 4/5/2021 13:00 4/5/2021 14:00 1198.9 4/5/2021 14:00 4/5/2021 15:00 1186.8 4/5/2021 15:00 4/5/202...

AI summary This document contains a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy demand data over a period from April 5, 2021, to April 8, 2021. It is part of a regulatory proceeding and includes a partially confidential appendix.

COSS CA DR-9 Attachment 1 Page 285 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 285 of 627 Start Time End Time ANL_MW 4/8/2021 9:00 4/8/2021 10:00 4/8/2021 10:00 4/8/2021 11:00 1066.3 1019.9 4/8/2021 11:00 4/8/2021 12:00 980.2 4/8/2021 12:00 4/8/2021 13:00 968.2 4/8/2021 13:00 4/8/2021 1...

AI summary This document presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from April 8, 2021, to April 11, 2021. The data reflects fluctuations in load demand across different hours, likely for analysis in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 286 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 286 of 627 Start Time End Time ANL_MW 4/11/2021 7:00 4/11/2021 8:00 4/11/2021 8:00 4/11/2021 9:00 1066.8 1115.3 4/11/2021 9:00 4/11/2021 10:00 1112.4 4/11/2021 10:00 4/11/2021 11:00 1074.4 4/11/2021 11:00 4/1...

AI summary This document provides a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from April 11, 2021, to April 14, 2021. The data reflects fluctuations in energy demand during specific hours, which may be relevant to grid management and energy planning.

COSS CA DR-9 Attachment 1 Page 287 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 287 of 627 Start Time End Time ANL_MW 4/14/2021 5:00 4/14/2021 6:00 4/14/2021 6:00 4/14/2021 7:00 854.3 979.8 4/14/2021 7:00 4/14/2021 8:00 1066.2 4/14/2021 8:00 4/14/2021 9:00 1105.9 4/14/2021 9:00 4/14/2021...

AI summary The text provides a table of Apparent Net Load (ANL_MW) values over specific time intervals on April 14-17, 2021. The data shows fluctuations in load throughout the day and night, with peaks and troughs recorded across multiple days.

COSS CA DR-9 Attachment 1 Page 288 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 288 of 627 Start Time End Time ANL_MW 4/17/2021 3:00 4/17/2021 4:00 804.1 4/17/2021 4:00 4/17/2021 5:00 4/17/2021 5:00 4/17/2021 6:00 837.3 849.2 4/17/2021 6:00 4/17/2021 7:00 894.2 4/17/2021 7:00 4/17/2021 8...

AI summary The document presents a table of apparent net load in megawatts (ANL_MW) over a series of time intervals from April 17 to April 19, 2021. The data shows fluctuations in load during different hours, likely related to energy demand and supply patterns in the electricity grid.

COSS CA DR-9 Attachment 1 Page 289 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 289 of 627 Start Time End Time ANL_MW 4/20/2021 1:00 4/20/2021 2:00 4/20/2021 2:00 4/20/2021 3:00 917.5 871.2 4/20/2021 3:00 4/20/2021 4:00 878.1 4/20/2021 4:00 4/20/2021 5:00 908.8 4/20/2021 5:00 4/20/2021 6...

AI summary The text presents a table of Apparent Net Load (ANL) in Megawatts (ANL_MW) over multiple time intervals on April 20-22, 2021. The data shows fluctuations in load throughout the day, indicating patterns in energy usage and potentially relevant for grid management and planning.

COSS CA DR-9 Attachment 1 Page 290 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 290 of 627 Start Time End Time ANL_MW 4/22/2021 23:00 4/23/2021 0:00 4/23/2021 0:00 4/23/2021 1:00 789.5 774.2 4/23/2021 1:00 4/23/2021 2:00 747.5 4/23/2021 2:00 4/23/2021 3:00 733.6 4/23/2021 3:00 4/23/2021...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy load data over a period of time. This data may be used for regulatory analysis or planning purposes.

COSS CA DR-9 Attachment 1 Page 291 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 291 of 627 Start Time End Time ANL_MW 4/25/2021 21:00 4/25/2021 22:00 923.3 4/25/2021 22:00 4/25/2021 23:00 893.4 4/25/2021 23:00 4/26/2021 0:00 813.4 4/26/2021 0:00 4/26/2021 1:00 724.9 4/26/2021 1:00 4/26/2...

AI summary The text presents a table of apparent net load (ANL_MW) values over specific time intervals on April 25 and 26, 2021, indicating fluctuations in energy demand during those periods.

COSS CA DR-9 Attachment 1 Page 293 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 293 of 627 Start Time End Time ANL_MW 5/1/2021 17:00 5/1/2021 18:00 857.7 5/1/2021 18:00 5/1/2021 19:00 850.8 5/1/2021 19:00 5/1/2021 20:00 906.1 5/1/2021 20:00 5/1/2021 21:00 973.8 5/1/2021 21:00 5/1/2021 22...

AI summary The text presents a table with timestamps and corresponding ANL_MW values, likely representing energy demand or generation data over a specific period in May 2021. The data appears to be technical and related to grid operations or load management.

COSS CA DR-9 Attachment 1 Page 301 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 301 of 627 Start Time End Time ANL_MW 5/25/2021 1:00 5/25/2021 2:00 5/25/2021 2:00 5/25/2021 3:00 580.2 563.2 5/25/2021 3:00 5/25/2021 4:00 555.3 5/25/2021 4:00 5/25/2021 5:00 558.3 5/25/2021 5:00 5/25/2021 6...

AI summary This document presents a table showing the ANL_MW (Apparent Net Load in megawatts) values for various time intervals on May 25, 2021, through May 27, 2021. The data reflects power demand fluctuations over time, with specific values recorded for each hour and half-hour intervals.

COSS CA DR-9 Attachment 1 Page 319 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 319 of 627 Start Time End Time ANL_MW 7/16/2021 13:00 7/16/2021 14:00 7/16/2021 14:00 7/16/2021 15:00 981.2 946.6 7/16/2021 15:00 7/16/2021 16:00 929.7 7/16/2021 16:00 7/16/2021 17:00 919.2 7/16/2021 17:00 7/...

AI summary This document presents a table of ANL_MW values over various time intervals from July 16 to July 19, 2021. The data appears to be related to energy generation or load management, likely used for regulatory or operational analysis.

COSS CA DR-9 Attachment 1 Page 324 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 324 of 627 Start Time End Time ANL_MW 7/31/2021 3:00 7/31/2021 4:00 7/31/2021 4:00 7/31/2021 5:00 665.5 677.4 7/31/2021 5:00 7/31/2021 6:00 672.1 7/31/2021 6:00 7/31/2021 7:00 683.2 7/31/2021 7:00 7/31/2021 8...

AI summary The document presents a table with time intervals and corresponding ANL_MW values, likely representing energy demand or load data over a specific period. It also includes a partially confidential appendix from a regulatory proceeding, indicating the presence of sensitive information.

COSS CA DR-9 Attachment 1 Page 340 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 340 of 627 Start Time End Time ANL_MW 9/15/2021 19:00 9/15/2021 20:00 9/15/2021 20:00 9/15/2021 21:00 792.2 773.7 9/15/2021 21:00 9/15/2021 22:00 630.9 9/15/2021 22:00 9/15/2021 23:00 615.2 9/15/2021 23:00 9/...

AI summary The document presents a table of energy demand data over a 48-hour period in September 2021, showing the start and end times of intervals and corresponding ANL_MW values. This data is likely used for analyzing electricity demand patterns and may be relevant to regulatory proceedings concerning energy generation and grid management.

COSS CA DR-9 Attachment 1 Page 342 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 342 of 627 Start Time End Time ANL_MW 9/21/2021 15:00 9/21/2021 16:00 9/21/2021 16:00 9/21/2021 17:00 1066.0 1092.5 9/21/2021 17:00 9/21/2021 18:00 1114.3 9/21/2021 18:00 9/21/2021 19:00 1060.4 9/21/2021 19:0...

AI summary The document presents a table of data showing the start and end times of energy demand intervals along with corresponding ANL_MW values. The data spans from September 21, 2021, to September 24, 2021, and appears to be part of a larger regulatory proceeding document, including a partially confidential appendix.

COSS CA DR-9 Attachment 1 Page 344 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 344 of 627 Start Time End Time ANL_MW 9/27/2021 11:00 9/27/2021 12:00 979.9 9/27/2021 12:00 9/27/2021 13:00 926.6 9/27/2021 13:00 9/27/2021 14:00 885.1 9/27/2021 14:00 9/27/2021 15:00 810.6 9/27/2021 15:00 9/...

AI summary The text presents a table of time-stamped data showing the ANL_MW values for a specific period from September 27, 2021, to September 29, 2021. The data appears to be related to power generation or load management, tracking changes in megawatts over time.

COSS CA DR-9 Attachment 1 Page 345 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 345 of 627 Start Time End Time ANL_MW 9/30/2021 9:00 9/30/2021 10:00 1085.5 9/30/2021 10:00 9/30/2021 11:00 1130.3 9/30/2021 11:00 9/30/2021 12:00 1154.3 9/30/2021 12:00 9/30/2021 13:00 1148.3 9/30/2021 13:00...

AI summary The document presents a table containing time-stamped data on ANL_MW values, which likely represent load or generation data over a specific period in October 2021. The data appears to be technical and operational in nature, possibly related to energy system performance.

COSS CA DR-9 Attachment 1 Page 346 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 346 of 627 Start Time End Time ANL_MW 10/3/2021 7:00 10/3/2021 8:00 1004.4 10/3/2021 8:00 10/3/2021 9:00 1035.8 10/3/2021 9:00 10/3/2021 10:00 1079.8 10/3/2021 10:00 10/3/2021 11:00 1099.1 10/3/2021 11:00 10/...

AI summary The text presents a table of time-stamped data showing the average net load (ANL_MW) for a period from October 3, 2021, to October 5, 2021. The data reflects the electricity demand at different times of the day, with values fluctuating between approximately 749.7 MW and 1164.3 MW.

COSS CA DR-9 Attachment 1 Page 357 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 357 of 627 Start Time End Time ANL_MW 11/4/2021 9:00 11/4/2021 10:00 11/4/2021 10:00 11/4/2021 11:00 1300.6 1276.4 11/4/2021 11:00 11/4/2021 12:00 1227.6 11/4/2021 12:00 11/4/2021 13:00 1197.3 11/4/2021 13:00...

AI summary The text presents a table showing the start and end times along with corresponding ANL_MW values for a period from November 4, 2021, to November 7, 2021. The data appears to represent load or capacity measurements over time, likely related to energy or utility operations.

COSS CA DR-9 Attachment 1 Page 358 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 358 of 627 Start Time End Time ANL_MW 11/7/2021 6:00 11/7/2021 7:00 11/7/2021 7:00 11/7/2021 8:00 999.3 1093.7 11/7/2021 8:00 11/7/2021 9:00 1170.7 11/7/2021 9:00 11/7/2021 10:00 1251.3 11/7/2021 10:00 11/7/2...

AI summary The document presents a table containing time-stamped data on ANL_MW values, which likely represent energy load or generation metrics over a period from November 7, 2021, to November 10, 2021. This data may be used for analyzing energy demand patterns or system performance.

COSS CA DR-9 Attachment 1 Page 366 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 366 of 627 Start Time End Time ANL_MW 11/30/2021 14:00 11/30/2021 15:00 11/30/2021 15:00 11/30/2021 16:00 1257.0 1278.8 11/30/2021 16:00 11/30/2021 17:00 1373.3 11/30/2021 17:00 11/30/2021 18:00 1418.8 11/30/...

AI summary The text presents a table with time intervals and corresponding ANL_MW values, likely representing energy demand or generation data over a specific period. It includes a partially confidential appendix from a regulatory proceeding, indicating that some information has been redacted.

COSS CA DR-9 Attachment 1 Page 379 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 379 of 627 Start Time End Time ANL_MW 1/7/2022 12:00 1/7/2022 13:00 1/7/2022 13:00 1/7/2022 14:00 1356.2 1296.9 1/7/2022 14:00 1/7/2022 15:00 1195.8 1/7/2022 15:00 1/7/2022 16:00 1092.0 1/7/2022 16:00 1/7/202...

AI summary This document presents a table showing the start and end times along with corresponding ANL_MW values for a period from January 7, 2022, to January 10, 2022. These data points likely represent energy load or generation metrics over specific time intervals.

COSS CA DR-9 Attachment 1 Page 386 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 386 of 627 Start Time End Time ANL_MW 1/27/2022 22:00 1/27/2022 23:00 1/27/2022 23:00 1/28/2022 0:00 1453.2 1396.8 1/28/2022 0:00 1/28/2022 1:00 1417.5 1/28/2022 1:00 1/28/2022 2:00 1408.1 1/28/2022 2:00 1/28...

AI summary The document contains a table with timestamps and corresponding ANL_MW values, likely representing energy demand or load data over a specific period in January 2022. The data appears to be part of a regulatory proceeding, with a partially confidential appendix indicating the context of the information.

COSS CA DR-9 Attachment 1 Page 388 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 388 of 627 Start Time End Time ANL_MW 2/2/2022 18:00 2/2/2022 19:00 2/2/2022 19:00 2/2/2022 20:00 1507.5 1427.1 2/2/2022 20:00 2/2/2022 21:00 1374.8 2/2/2022 21:00 2/2/2022 22:00 1280.5 2/2/2022 22:00 2/2/202...

AI summary This document presents a table of apparent net load (ANL_MW) data over multiple time intervals from February 2 to February 5, 2022. The data represents fluctuations in electricity demand during specific hours, which may be relevant for grid planning and energy management.

COSS CA DR-9 Attachment 1 Page 389 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 389 of 627 Start Time End Time ANL_MW 2/5/2022 16:00 2/5/2022 17:00 1670.5 2/5/2022 17:00 2/5/2022 18:00 2/5/2022 18:00 2/5/2022 19:00 1777.5 1802.1 2/5/2022 19:00 2/5/2022 20:00 1769.3 2/5/2022 20:00 2/5/202...

AI summary The document presents a table showing apparent net load in megawatts (ANL_MW) over various time intervals from February 5 to February 8, 2022. The data reflects fluctuations in electricity demand across different hours, with specific values for each time period.

COSS CA DR-9 Attachment 1 Page 390 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 390 of 627 Start Time End Time ANL_MW 2/8/2022 14:00 2/8/2022 15:00 2/8/2022 15:00 2/8/2022 16:00 1349.5 1354.3 2/8/2022 16:00 2/8/2022 17:00 1386.6 2/8/2022 17:00 2/8/2022 18:00 1471.7 2/8/2022 18:00 2/8/202...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load (ANL_MW) values, likely representing energy load data over a specific period. The data spans multiple days and shows fluctuations in load levels, possibly used for regulatory analysis or planning.

COSS CA DR-9 Attachment 1 Page 391 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 391 of 627 Start Time End Time ANL_MW 2/11/2022 12:00 2/11/2022 13:00 2/11/2022 13:00 2/11/2022 14:00 1173.8 1200.0 2/11/2022 14:00 2/11/2022 15:00 1208.7 2/11/2022 15:00 2/11/2022 16:00 1228.0 2/11/2022 16:0...

AI summary The document presents a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from February 11 to February 14, 2022. This data is likely related to electricity demand and generation analysis during that period.

COSS CA DR-9 Attachment 1 Page 392 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 392 of 627 Start Time End Time ANL_MW 2/14/2022 10:00 2/14/2022 11:00 2/14/2022 11:00 2/14/2022 12:00 1547.2 1545.6 2/14/2022 12:00 2/14/2022 13:00 1566.4 2/14/2022 13:00 2/14/2022 14:00 1510.1 2/14/2022 14:0...

AI summary The text presents a table of apparent net load (ANL_MW) values across multiple time intervals from February 14 to February 17, 2022. This data appears to be related to energy demand or supply fluctuations over a specific period.

COSS CA DR-9 Attachment 1 Page 393 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 393 of 627 Start Time End Time ANL_MW 2/17/2022 8:00 2/17/2022 9:00 2/17/2022 9:00 2/17/2022 10:00 1175.9 1176.6 2/17/2022 10:00 2/17/2022 11:00 1149.2 2/17/2022 11:00 2/17/2022 12:00 1086.5 2/17/2022 12:00 2...

AI summary This document presents a table showing the apparent net load in megawatts (ANL_MW) over various time intervals on February 17, 2022, through February 20, 2022. The data reflects fluctuations in electricity demand during specific hours, likely used for analysis in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 394 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 394 of 627 Start Time End Time ANL_MW 2/20/2022 6:00 2/20/2022 7:00 2/20/2022 7:00 2/20/2022 8:00 1199.0 1246.4 2/20/2022 8:00 2/20/2022 9:00 1330.9 2/20/2022 9:00 2/20/2022 10:00 1294.0 2/20/2022 10:00 2/20/...

AI summary This document presents a table of Apparent Net Load in Megawatts (ANL_MW) over specific time intervals from February 20 to February 23, 2022. The data reflects load variations across different hours, which may be relevant for grid planning and energy management.

COSS CA DR-9 Attachment 1 Page 395 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 395 of 627 Start Time End Time ANL_MW 2/23/2022 4:00 2/23/2022 5:00 932.6 2/23/2022 5:00 2/23/2022 6:00 2/23/2022 6:00 2/23/2022 7:00 967.7 1024.1 2/23/2022 7:00 2/23/2022 8:00 1029.6 2/23/2022 8:00 2/23/2022...

AI summary The document presents a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from February 23 to February 26, 2022. This data may be relevant for analyzing energy demand patterns and grid performance.

COSS CA DR-9 Attachment 1 Page 396 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 396 of 627 Start Time End Time ANL_MW 2/26/2022 2:00 2/26/2022 3:00 2/26/2022 3:00 2/26/2022 4:00 1490.0 1480.5 2/26/2022 4:00 2/26/2022 5:00 1503.7 2/26/2022 5:00 2/26/2022 6:00 1476.9 2/26/2022 6:00 2/26/20...

AI summary This document provides a table of apparent net load in megawatts (ANL_MW) over a period of time in February and March 2022. The data shows fluctuations in load during different time intervals, which may be relevant for energy planning and grid management.

COSS CA DR-9 Attachment 1 Page 397 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 397 of 627 Start Time End Time ANL_MW 3/1/2022 0:00 3/1/2022 1:00 1430.8 3/1/2022 1:00 3/1/2022 2:00 3/1/2022 2:00 3/1/2022 3:00 1461.2 1471.8 3/1/2022 3:00 3/1/2022 4:00 1473.9 3/1/2022 4:00 3/1/2022 5:00 15...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over a period of time on March 1, 2022, and March 2, 2022, indicating fluctuations in energy demand throughout the day.

COSS CA DR-9 Attachment 1 Page 398 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 398 of 627 Start Time End Time ANL_MW 3/3/2022 22:00 3/3/2022 23:00 1253.6 3/3/2022 23:00 3/4/2022 0:00 3/4/2022 0:00 3/4/2022 1:00 1262.1 1267.9 3/4/2022 1:00 3/4/2022 2:00 1262.2 3/4/2022 2:00 3/4/2022 3:00...

AI summary The text presents a table of apparent net load in megawatts (ANL_MW) over a period of time from March 3, 2022, to March 6, 2022, showing fluctuations in load during different time intervals. This data could be relevant to understanding energy demand patterns and grid operations.

COSS CA DR-9 Attachment 1 Page 399 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 399 of 627 Start Time End Time ANL_MW 3/6/2022 20:00 3/6/2022 21:00 3/6/2022 21:00 3/6/2022 22:00 1315.1 1269.1 3/6/2022 22:00 3/6/2022 23:00 1156.7 3/6/2022 23:00 3/7/2022 0:00 1062.3 3/7/2022 0:00 3/7/2022...

AI summary This document presents a table of apparent net load in megawatts (ANL_MW) over various time intervals from March 6 to March 9, 2022. The data reflects fluctuations in electricity demand during different hours of the day.

COSS CA DR-9 Attachment 1 Page 400 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 400 of 627 Start Time 3/9/2022 18:00 End Time 3/9/2022 19:00 ANL_MW 1611.3 3/9/2022 19:00 3/9/2022 20:00 1616.3 3/9/2022 20:00 3/9/2022 21:00 1584.8 3/9/2022 21:00 3/9/2022 22:00 1533.3 3/9/2022 22:00 3/9/202...

AI summary The document presents a table of apparent net load in megawatts (ANL_MW) over a period of time from March 9, 2022, to March 12, 2022, showing fluctuations in load values during specific hourly intervals.

COSS CA DR-9 Attachment 1 Page 401 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 401 of 627 Start Time End Time ANL_MW 3/12/2022 16:00 3/12/2022 17:00 3/12/2022 17:00 3/12/2022 18:00 1098.2 1150.7 3/12/2022 18:00 3/12/2022 19:00 1089.6 3/12/2022 19:00 3/12/2022 20:00 1054.8 3/12/2022 20:0...

AI summary The text presents a table of apparent net load in megawatts (ANL_MW) over a series of time intervals from March 12, 2022, to March 15, 2022. This data is likely used for analyzing electricity demand patterns and grid operations during this period.

COSS CA DR-9 Attachment 1 Page 402 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 402 of 627 Start Time End Time ANL_MW 3/15/2022 15:00 3/15/2022 16:00 3/15/2022 16:00 3/15/2022 17:00 1125.6 1119.4 3/15/2022 17:00 3/15/2022 18:00 1183.1 3/15/2022 18:00 3/15/2022 19:00 1240.9 3/15/2022 19:0...

AI summary The document presents a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from March 15, 2022, to March 18, 2022. The data reflects fluctuations in energy demand during specific hours, likely used for analysis in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 403 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 403 of 627 Start Time End Time ANL_MW 3/18/2022 13:00 3/18/2022 14:00 3/18/2022 14:00 3/18/2022 15:00 1260.9 1182.5 3/18/2022 15:00 3/18/2022 16:00 1051.3 3/18/2022 16:00 3/18/2022 17:00 1033.1 3/18/2022 17:0...

AI summary The document presents a table showing apparent net load in megawatts (ANL_MW) over multiple time intervals from March 18 to March 21, 2022. These data points may be relevant to understanding energy demand patterns and grid management.

COSS CA DR-9 Attachment 1 Page 405 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 405 of 627 Start Time End Time ANL_MW 3/24/2022 9:00 3/24/2022 10:00 1458.3 3/24/2022 10:00 3/24/2022 11:00 3/24/2022 11:00 3/24/2022 12:00 1402.9 1417.9 3/24/2022 12:00 3/24/2022 13:00 1389.7 3/24/2022 13:00...

AI summary This document presents a table of Apparent Net Load in Megawatts (ANL_MW) over multiple time intervals on March 24th to March 27th, 2022. It provides detailed data on load fluctuations throughout the day and night, which may be relevant for energy management and planning purposes.

COSS CA DR-9 Attachment 1 Page 406 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 406 of 627 Start Time 3/27/2022 7:00 End Time 3/27/2022 8:00 ANL_MW 915.5 3/27/2022 8:00 3/27/2022 9:00 1028.1 3/27/2022 9:00 3/27/2022 10:00 1094.5 3/27/2022 10:00 3/27/2022 11:00 3/27/2022 11:00 3/27/2022 1...

AI summary This document provides a table showing the Apparent Net Load in Megawatts (ANL_MW) over a period of time from March 27 to March 30, 2022. The data reflects fluctuations in load during specific time intervals, which could be relevant for energy management and planning purposes.

COSS CA DR-9 Attachment 1 Page 408 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 408 of 627 Start Time End Time ANL_MW 4/2/2022 3:00 4/2/2022 4:00 4/2/2022 4:00 4/2/2022 5:00 858.5 848.9 4/2/2022 5:00 4/2/2022 6:00 839.1 4/2/2022 6:00 4/2/2022 7:00 824.1 4/2/2022 7:00 4/2/2022 8:00 880.9...

AI summary The text presents a table with timestamps and Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy load data for a specific period. It includes a partially confidential appendix from a regulatory proceeding, indicating sensitive information has been redacted.

COSS CA DR-9 Attachment 1 Page 409 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 409 of 627 Start Time End Time ANL_MW 4/5/2022 1:00 4/5/2022 2:00 986.7 4/5/2022 2:00 4/5/2022 3:00 972.0 4/5/2022 3:00 4/5/2022 4:00 999.2 4/5/2022 4:00 4/5/2022 5:00 994.7 4/5/2022 5:00 4/5/2022 6:00 1037.3...

AI summary The text provides a table of apparent net load (ANL_MW) data over a 24-hour period on April 5 and 6, 2022, showing fluctuations in energy demand at hourly intervals.

COSS CA DR-9 Attachment 1 Page 454 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 454 of 627 Start Time End Time ANL_MW 8/14/2022 7:00 8/14/2022 8:00 938.0 8/14/2022 8:00 8/14/2022 9:00 997.9 8/14/2022 9:00 8/14/2022 10:00 1082.7 8/14/2022 10:00 8/14/2022 11:00 1137.1 8/14/2022 11:00 8/14/...

AI summary The document presents a table with time-stamped data showing the load in megawatts (ANL_MW) over a 24-hour period on August 14 and 15, 2022. It reflects the electricity demand at various intervals, indicating fluctuations in power consumption throughout the day.

COSS CA DR-9 Attachment 1 Page 462 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 462 of 627 Start Time End Time ANL_MW 9/6/2022 15:00 9/6/2022 16:00 9/6/2022 16:00 9/6/2022 17:00 1130.9 1172.3 9/6/2022 17:00 9/6/2022 18:00 1192.4 9/6/2022 18:00 9/6/2022 19:00 1170.2 9/6/2022 19:00 9/6/202...

AI summary The text presents a table with time intervals and corresponding ANL_MW values, likely representing energy demand or load data over a period from September 6, 2022, to September 9, 2022. The data appears to be part of a regulatory proceeding related to energy management and planning.

COSS CA DR-9 Attachment 1 Page 467 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 467 of 627 Start Time End Time ANL_MW 9/21/2022 5:00 9/21/2022 6:00 9/21/2022 6:00 9/21/2022 7:00 820.7 944.4 9/21/2022 7:00 9/21/2022 8:00 1008.6 9/21/2022 8:00 9/21/2022 9:00 1069.8 9/21/2022 9:00 9/21/2022...

AI summary This document contains a table showing the analysis of load (ANL_MW) over a period of time from September 21, 2022, to September 24, 2022. It reflects the load data for different time intervals, which is likely used for energy planning and regulatory analysis purposes.

COSS CA DR-9 Attachment 1 Page 468 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 468 of 627 Start Time End Time ANL_MW 9/24/2022 3:00 9/24/2022 4:00 9/24/2022 4:00 9/24/2022 5:00 389.1 305.4 9/24/2022 5:00 9/24/2022 6:00 288.2 9/24/2022 6:00 9/24/2022 7:00 295.8 9/24/2022 7:00 9/24/2022 8...

AI summary The text presents a table of ANL_MW (Apparent Net Load in megawatts) values over specific time intervals from September 24 to September 26, 2022. These values represent the electricity demand during different hours, which may be relevant for analyzing grid performance, load management, or energy planning.

COSS CA DR-9 Attachment 1 Page 472 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 472 of 627 Start Time End Time ANL_MW 10/5/2022 19:00 10/5/2022 20:00 10/5/2022 20:00 10/5/2022 21:00 1057.6 1038.7 10/5/2022 21:00 10/5/2022 22:00 968.4 10/5/2022 22:00 10/5/2022 23:00 887.4 10/5/2022 23:00...

AI summary The document presents a table with time intervals and corresponding Apparent Net Load (ANL_MW) values, likely related to energy usage or generation over a specific period in October 2022. The data appears to be part of a regulatory proceeding, possibly related to energy management or grid operations.

COSS CA DR-9 Attachment 1 Page 474 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 474 of 627 Start Time End Time ANL_MW 10/11/2022 15:00 10/11/2022 16:00 10/11/2022 16:00 10/11/2022 17:00 982.2 1008.3 10/11/2022 17:00 10/11/2022 18:00 1033.4 10/11/2022 18:00 10/11/2022 19:00 1054.2 10/11/2...

AI summary This document presents a table of apparent net load (ANL_MW) values over a period of days in October 2022, showing the load during specific time intervals. The data is part of a regulatory proceeding and may be used for analysis related to energy demand and grid management.

COSS CA DR-9 Attachment 1 Page 475 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 475 of 627 Start Time End Time ANL_MW 10/14/2022 13:00 10/14/2022 14:00 10/14/2022 14:00 10/14/2022 15:00 885.0 835.0 10/14/2022 15:00 10/14/2022 16:00 847.0 10/14/2022 16:00 10/14/2022 17:00 874.7 10/14/2022...

AI summary This document presents a table with timestamps and corresponding Apparent Net Load (ANL_MW) values, likely related to electricity demand analysis over a period in October 2022. The data appears to be part of a regulatory proceeding or energy planning document.

COSS CA DR-9 Attachment 1 Page 476 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 476 of 627 Start Time End Time ANL_MW 10/17/2022 11:00 10/17/2022 12:00 10/17/2022 12:00 10/17/2022 13:00 1168.2 1150.3 10/17/2022 13:00 10/17/2022 14:00 1121.0 10/17/2022 14:00 10/17/2022 15:00 1096.9 10/17/...

AI summary This document contains a table showing apparent net load (ANL_MW) values over multiple time intervals from October 17 to October 20, 2022. The data reflects fluctuations in energy demand during specific hours, with values ranging from approximately 600 to 1200 MW. The table is part of a larger regulatory proceeding and is labeled as partially confidential.

COSS CA DR-9 Attachment 1 Page 477 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 477 of 627 Start Time 10/20/2022 9:00 End Time 10/20/2022 10:00 ANL_MW 963.0 10/20/2022 10:00 10/20/2022 11:00 955.8 10/20/2022 11:00 10/20/2022 12:00 916.6 10/20/2022 12:00 10/20/2022 13:00 857.3 10/20/2022...

AI summary The provided text presents a table showing apparent net load (ANL_MW) over a series of time intervals from October 20, 2022, to October 23, 2022. These data points appear to be related to electricity demand or generation, likely within a regulatory proceeding context.

COSS CA DR-9 Attachment 1 Page 478 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 478 of 627 Start Time End Time ANL_MW 10/23/2022 7:00 10/23/2022 8:00 10/23/2022 8:00 10/23/2022 9:00 939.6 1017.7 10/23/2022 9:00 10/23/2022 10:00 1107.0 10/23/2022 10:00 10/23/2022 11:00 1161.1 10/23/2022 1...

AI summary The document provides a table of apparent net load (ANL_MW) values over a period of time, showing the start and end times for each interval and the corresponding ANL_MW values. This data likely represents electricity demand or generation levels during specific hours on multiple days.

COSS CA DR-9 Attachment 1 Page 479 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 479 of 627 Start Time End Time ANL_MW 10/26/2022 5:00 10/26/2022 6:00 10/26/2022 6:00 10/26/2022 7:00 913.8 1038.7 10/26/2022 7:00 10/26/2022 8:00 1155.6 10/26/2022 8:00 10/26/2022 9:00 1158.9 10/26/2022 9:00...

AI summary This document presents a table of Apparent Net Load (ANL_MW) values over a period of time in October and November 2022, indicating fluctuations in energy demand. The data spans multiple days and time intervals, reflecting variations in apparent net load throughout the day.

COSS CA DR-9 Attachment 1 Page 480 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 480 of 627 Start Time End Time ANL_MW 10/29/2022 3:00 10/29/2022 4:00 10/29/2022 4:00 10/29/2022 5:00 1057.7 1094.0 10/29/2022 5:00 10/29/2022 6:00 1118.8 10/29/2022 6:00 10/29/2022 7:00 1133.4 10/29/2022 7:0...

AI summary This document contains a table showing the apparent net load (ANL_MW) over various time intervals on three days in October and November 2022. The data appears to be related to energy usage or generation patterns during specific time periods.

COSS CA DR-9 Attachment 1 Page 481 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 481 of 627 Start Time End Time ANL_MW 11/1/2022 1:00 11/1/2022 2:00 11/1/2022 2:00 11/1/2022 3:00 889.2 857.1 11/1/2022 3:00 11/1/2022 4:00 850.5 11/1/2022 4:00 11/1/2022 5:00 842.7 11/1/2022 5:00 11/1/2022 6...

AI summary The text presents a table of apparent net load (ANL_MW) data over multiple time intervals on three consecutive days (November 1, 2, and 3, 2022). The data shows fluctuations in ANL_MW values, indicating changes in electricity demand or supply over time.

COSS CA DR-9 Attachment 1 Page 483 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 483 of 627 Start Time End Time ANL_MW 11/6/2022 20:00 11/6/2022 21:00 11/6/2022 21:00 11/6/2022 22:00 747.3 697.7 11/6/2022 22:00 11/6/2022 23:00 641.0 11/6/2022 23:00 11/7/2022 0:00 558.9 11/7/2022 0:00 11/7...

AI summary This document provides a table of Apparent Net Load (ANL_MW) values over a period of time in November 2022, showing fluctuations in load during specific hours. The data appears to be part of a regulatory proceeding and may relate to energy demand or grid management analysis.

COSS CA DR-9 Attachment 1 Page 484 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 484 of 627 Start Time End Time ANL_MW 11/9/2022 18:00 11/9/2022 19:00 11/9/2022 19:00 11/9/2022 20:00 1306.8 1300.3 11/9/2022 20:00 11/9/2022 21:00 1256.1 11/9/2022 21:00 11/9/2022 22:00 1171.6 11/9/2022 22:0...

AI summary This document presents a table of apparent net load (ANL_MW) data across multiple time intervals from November 9 to November 12, 2022. The data reflects changes in electricity demand over time, likely used for grid planning or regulatory analysis.

COSS CA DR-9 Attachment 1 Page 485 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 485 of 627 Start Time End Time ANL_MW 11/12/2022 16:00 11/12/2022 17:00 11/12/2022 17:00 11/12/2022 18:00 777.5 819.0 11/12/2022 18:00 11/12/2022 19:00 763.4 11/12/2022 19:00 11/12/2022 20:00 725.8 11/12/2022...

AI summary The text provides a table showing apparent net load (ANL_MW) values across various time intervals from November 12 to November 15, 2022. The data represents load fluctuations over a 3-day period, potentially related to electricity demand and supply planning.

COSS CA DR-9 Attachment 1 Page 486 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 486 of 627 Start Time End Time ANL_MW 11/15/2022 14:00 11/15/2022 15:00 11/15/2022 15:00 11/15/2022 16:00 1200.6 1255.0 11/15/2022 16:00 11/15/2022 17:00 1347.7 11/15/2022 17:00 11/15/2022 18:00 1422.3 11/15/...

AI summary The document presents a table showing the Apparent Net Load (ANL_MW) over specific time intervals on November 15th, 16th, 17th, and 18th, 2022. The data reflects variations in load throughout the day, with peaks and troughs observed during different hours.

COSS CA DR-9 Attachment 1 Page 487 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 487 of 627 Start Time End Time ANL_MW 11/18/2022 12:00 11/18/2022 13:00 11/18/2022 13:00 11/18/2022 14:00 1165.2 1143.5 11/18/2022 14:00 11/18/2022 15:00 1135.6 11/18/2022 15:00 11/18/2022 16:00 1155.9 11/18/...

AI summary The document presents a table of Apparent Net Load (ANL_MW) values over specific time intervals from November 18, 2022, to November 21, 2022. These values likely represent electricity demand or generation data across different hours, which may be relevant to regulatory proceedings related to energy management and grid operations.

COSS CA DR-9 Attachment 1 Page 488 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 488 of 627 Start Time End Time ANL_MW 11/21/2022 10:00 11/21/2022 11:00 11/21/2022 11:00 11/21/2022 12:00 1254.6 1255.4 11/21/2022 12:00 11/21/2022 13:00 1233.6 11/21/2022 13:00 11/21/2022 14:00 1246.6 11/21/...

AI summary The document presents a table showing the apparent net load (ANL_MW) in megawatts over various time intervals from November 21, 2022, to November 24, 2022. This data may be used for analyzing energy demand patterns and grid management.

COSS CA DR-9 Attachment 1 Page 489 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 489 of 627 11/24/2022 8:00 11/24/2022 9:00 1457.7 11/24/2022 9:00 11/24/2022 10:00 1395.7 11/24/2022 10:00 11/24/2022 11:00 1296.9 11/24/2022 11:00 11/24/2022 12:00 1263.3 11/24/2022 12:00 11/24/2022 13:00 12...

AI summary The text presents a series of timestamps and apparent net load values in megawatts (ANL_MW) recorded on November 24 and 25, 2022. These data points likely represent electricity demand measurements over a specific period, which may be used for analysis related to grid operations or load forecasting.

COSS CA DR-9 Attachment 1 Page 502 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 502 of 627 Start Time End Time ANL_MW 1/1/2023 6:00 1/1/2023 7:00 962.4 1/1/2023 7:00 1/1/2023 8:00 1/1/2023 8:00 1/1/2023 9:00 988.6 1039.5 1/1/2023 9:00 1/1/2023 10:00 1097.5 1/1/2023 10:00 1/1/2023 11:00 1...

AI summary This document contains a table with data on active network load (ANL) in megawatts (MW) over specific time intervals from January 1, 2023, to January 4, 2023. The data shows fluctuations in ANL throughout the day and across multiple days.

COSS CA DR-9 Attachment 1 Page 507 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 507 of 627 Start Time End Time ANL_MW 1/15/2023 20:00 1/15/2023 21:00 1/15/2023 21:00 1/15/2023 22:00 1402.3 1307.5 1/15/2023 22:00 1/15/2023 23:00 1213.5 1/15/2023 23:00 1/16/2023 0:00 1120.3 1/16/2023 0:00...

AI summary The text presents a table showing the start and end times of various intervals along with corresponding ANL_MW values, likely representing energy demand or generation data over a specific period in January 2023. This data may be relevant for analyzing energy consumption patterns or grid performance.

COSS CA DR-9 Attachment 1 Page 518 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 518 of 627 Start Time End Time ANL_MW 2/16/2023 22:00 2/16/2023 23:00 2/16/2023 23:00 2/17/2023 0:00 1037.9 1039.2 2/17/2023 0:00 2/17/2023 1:00 1156.9 2/17/2023 1:00 2/17/2023 2:00 1178.3 2/17/2023 2:00 2/17...

AI summary The text presents a table with time intervals and corresponding ANL_MW values, likely representing energy demand or load data over a period in February 2023. The table includes start and end times, along with associated megawatt values, suggesting a focus on grid management or energy usage analysis.

COSS CA DR-9 Attachment 1 Page 523 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 523 of 627 Start Time End Time ANL_MW 3/3/2023 12:00 3/3/2023 13:00 1413.9 3/3/2023 13:00 3/3/2023 14:00 1348.1 3/3/2023 14:00 3/3/2023 15:00 1330.4 3/3/2023 15:00 3/3/2023 16:00 1321.2 3/3/2023 16:00 3/3/202...

AI summary The text presents a table of apparent load in megawatts (ANL_MW) recorded over multiple time intervals on March 3rd and 4th, 2023, showing fluctuations in energy demand throughout the day.

COSS CA DR-9 Attachment 1 Page 527 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 527 of 627 Start Time End Time ANL_MW 3/15/2023 5:00 3/15/2023 6:00 989.9 3/15/2023 6:00 3/15/2023 7:00 1081.5 3/15/2023 7:00 3/15/2023 8:00 1185.1 3/15/2023 8:00 3/15/2023 9:00 1227.5 3/15/2023 9:00 3/15/202...

AI summary The document presents a table with time-stamped data showing the load (in ANL_MW) during a specific period on March 15th and 16th, 2023. This data may be used to analyze electricity demand patterns over time.

COSS CA DR-9 Attachment 1 Page 529 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 529 of 627 Start Time End Time ANL_MW 3/21/2023 1:00 3/21/2023 2:00 3/21/2023 2:00 3/21/2023 3:00 1147.2 1179.8 3/21/2023 3:00 3/21/2023 4:00 1213.3 3/21/2023 4:00 3/21/2023 5:00 1269.8 3/21/2023 5:00 3/21/20...

AI summary This document contains a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy demand data over a specific period. It also references a partially confidential appendix from a regulatory proceeding, indicating the inclusion of sensitive information.

COSS CA DR-9 Attachment 1 Page 530 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 530 of 627 Start Time End Time ANL_MW 3/23/2023 23:00 3/24/2023 0:00 3/24/2023 0:00 3/24/2023 1:00 1029.9 1002.4 3/24/2023 1:00 3/24/2023 2:00 972.1 3/24/2023 2:00 3/24/2023 3:00 989.5 3/24/2023 3:00 3/24/202...

AI summary This document contains a table showing the Apparent Net Load in Megawatts (ANL_MW) over a period of time in March 2023. The data reflects the load levels at different times of day across multiple days, indicating fluctuations in energy demand.

COSS CA DR-9 Attachment 1 Page 531 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 531 of 627 Start Time End Time ANL_MW 3/26/2023 21:00 3/26/2023 22:00 3/26/2023 22:00 3/26/2023 23:00 1421.9 1360.0 3/26/2023 23:00 3/27/2023 0:00 1258.3 3/27/2023 0:00 3/27/2023 1:00 1216.0 3/27/2023 1:00 3/...

AI summary This document presents a table showing the apparent net load (ANL_MW) over a period of time from March 26, 2023, to March 29, 2023. It includes timestamps and corresponding ANL_MW values, which represent the net electricity load on the grid during specific time intervals.

COSS CA DR-9 Attachment 1 Page 532 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 532 of 627 Start Time End Time ANL_MW 3/29/2023 19:00 3/29/2023 20:00 1379.7 3/29/2023 20:00 3/29/2023 21:00 3/29/2023 21:00 3/29/2023 22:00 1438.1 1404.2 3/29/2023 22:00 3/29/2023 23:00 1318.5 3/29/2023 23:0...

AI summary The text presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over specific time intervals from March 29, 2023, to April 1, 2023. This data appears to be related to energy demand or load management in a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 533 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 533 of 627 Start Time End Time ANL_MW 4/1/2023 17:00 4/1/2023 18:00 1314.2 4/1/2023 18:00 4/1/2023 19:00 4/1/2023 19:00 4/1/2023 20:00 1247.9 1197.5 4/1/2023 20:00 4/1/2023 21:00 1179.9 4/1/2023 21:00 4/1/202...

AI summary The document presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from April 1 to April 4, 2023. It includes detailed data on load fluctuations throughout the day and night, indicating variations in electricity demand.

COSS CA DR-9 Attachment 1 Page 534 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 534 of 627 Start Time End Time ANL_MW 4/4/2023 15:00 4/4/2023 16:00 1030.1 4/4/2023 16:00 4/4/2023 17:00 4/4/2023 17:00 4/4/2023 18:00 1060.2 1130.8 4/4/2023 18:00 4/4/2023 19:00 1133.6 4/4/2023 19:00 4/4/202...

AI summary This document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values. The data appears to be related to energy load management and may be used for analyzing demand patterns over a specific period.

COSS CA DR-9 Attachment 1 Page 535 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 535 of 627 Start Time End Time ANL_MW 4/7/2023 13:00 4/7/2023 14:00 4/7/2023 14:00 4/7/2023 15:00 923.9 888.9 4/7/2023 15:00 4/7/2023 16:00 894.4 4/7/2023 16:00 4/7/2023 17:00 954.4 4/7/2023 17:00 4/7/2023 18...

AI summary The document presents a table of apparent net load (ANL_MW) values over time, showing fluctuations in load between April 7, 2023, and April 10, 2023. These data points may be relevant to energy generation, grid management, or resource planning discussions.

COSS CA DR-9 Attachment 1 Page 536 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 536 of 627 Start Time End Time ANL_MW 4/10/2023 11:00 4/10/2023 12:00 4/10/2023 12:00 4/10/2023 13:00 1160.1 1092.7 4/10/2023 13:00 4/10/2023 14:00 1033.2 4/10/2023 14:00 4/10/2023 15:00 976.8 4/10/2023 15:00...

AI summary The document presents a table showing the Apparent Net Load (ANL_MW) over various time intervals from April 10 to April 13, 2023. This data reflects changes in electricity demand during specific hours and may be used for analysis related to energy management and grid operations.

COSS CA DR-9 Attachment 1 Page 538 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 538 of 627 Start Time End Time ANL_MW 4/16/2023 7:00 4/16/2023 8:00 927.4 4/16/2023 8:00 4/16/2023 9:00 4/16/2023 9:00 4/16/2023 10:00 1005.0 1067.0 4/16/2023 10:00 4/16/2023 11:00 1101.7 4/16/2023 11:00 4/16...

AI summary The document presents a table showing apparent net load in megawatts (ANL_MW) over a period of time from April 16 to April 19, 2023. The table includes timestamps and corresponding ANL_MW values, indicating fluctuations in load demand across different hours.

COSS CA DR-9 Attachment 1 Page 539 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 539 of 627 Start Time End Time ANL_MW 4/19/2023 5:00 4/19/2023 6:00 900.7 4/19/2023 6:00 4/19/2023 7:00 4/19/2023 7:00 4/19/2023 8:00 1041.1 1180.9 4/19/2023 8:00 4/19/2023 9:00 1192.8 4/19/2023 9:00 4/19/202...

AI summary This document presents a table of apparent net load (ANL_MW) values over a series of time intervals from April 19 to April 22, 2023. The data reflects the apparent net load in megawatts during specific start and end times, which may be relevant to grid operations and energy management.

COSS CA DR-9 Attachment 1 Page 540 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 540 of 627 Start Time End Time ANL_MW 4/22/2023 3:00 4/22/2023 4:00 1030.0 4/22/2023 4:00 4/22/2023 5:00 4/22/2023 5:00 4/22/2023 6:00 1033.5 1058.1 4/22/2023 6:00 4/22/2023 7:00 1053.1 4/22/2023 7:00 4/22/20...

AI summary This document contains a table with timestamps and Apparent Net Load (ANL_MW) values for a specific period, likely related to energy demand or supply analysis. The data spans multiple days and shows fluctuations in ANL_MW, which may be used for planning or regulatory purposes.

COSS CA DR-9 Attachment 1 Page 541 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 541 of 627 Start Time End Time ANL_MW 4/25/2023 1:00 4/25/2023 2:00 4/25/2023 2:00 4/25/2023 3:00 974.1 960.5 4/25/2023 3:00 4/25/2023 4:00 954.0 4/25/2023 4:00 4/25/2023 5:00 971.1 4/25/2023 5:00 4/25/2023 6...

AI summary The document presents a table showing Apparent Net Load (ANL_MW) values over various time intervals on April 25th and 26th, 2023, and into April 27th, 2023. This data likely represents electricity demand or generation measurements during a specific regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 543 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 543 of 627 Start Time End Time ANL_MW 4/30/2023 21:00 4/30/2023 22:00 998.5 4/30/2023 22:00 4/30/2023 23:00 882.1 4/30/2023 23:00 5/1/2023 0:00 779.6 5/1/2023 0:00 5/1/2023 1:00 741.6 5/1/2023 1:00 5/1/2023 2...

AI summary This document provides a table showing the apparent net load (ANL_MW) over a series of time intervals on April 30, 2023, and May 1, 2023, indicating fluctuations in electricity demand during those periods.

COSS CA DR-9 Attachment 1 Page 562 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 562 of 627 Start Time End Time ANL_MW 6/25/2023 7:00 6/25/2023 8:00 778.2 6/25/2023 8:00 6/25/2023 9:00 773.1 6/25/2023 9:00 6/25/2023 10:00 848.3 6/25/2023 10:00 6/25/2023 11:00 916.5 6/25/2023 11:00 6/25/20...

AI summary The text presents a table of time-stamped data showing the ANL_MW (Apparent Net Load in Megawatts) values over a 24-hour period on June 25 and 26, 2023. These values represent the electricity demand or load at specific times, which is relevant for grid management and energy planning.

COSS CA DR-9 Attachment 1 Page 584 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 584 of 627 Start Time End Time ANL_MW 8/28/2023 11:00 8/28/2023 12:00 8/28/2023 12:00 8/28/2023 13:00 1148.3 1114.6 8/28/2023 13:00 8/28/2023 14:00 1108.7 8/28/2023 14:00 8/28/2023 15:00 1108.0 8/28/2023 15:0...

AI summary This document presents a table showing the start and end times of various intervals along with corresponding ANL_MW values, likely representing energy demand or generation data. The data spans from August 28, 2023, to August 31, 2023, and includes a partially confidential appendix from a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 595 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 595 of 627 Start Time 9/29/2023 13:00 End Time 9/29/2023 14:00 ANL_MW 1095.5 9/29/2023 14:00 9/29/2023 15:00 1092.6 9/29/2023 15:00 9/29/2023 16:00 1091.3 9/29/2023 16:00 9/29/2023 17:00 1132.5 9/29/2023 17:0...

AI summary The document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely representing energy demand data over a specific period. This data may be used for analysis in a regulatory proceeding related to energy load management.

COSS CA DR-9 Attachment 1 Page 596 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 596 of 627 Start Time End Time ANL_MW 10/2/2023 11:00 10/2/2023 12:00 10/2/2023 12:00 10/2/2023 13:00 1023.7 1037.1 10/2/2023 13:00 10/2/2023 14:00 1058.5 10/2/2023 14:00 10/2/2023 15:00 1054.3 10/2/2023 15:0...

AI summary The document presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to electricity demand or supply over a specific period from October 2, 2023, to October 5, 2023. The data appears to be technical and may be used for energy planning or regulatory analysis.

COSS CA DR-9 Attachment 1 Page 597 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 597 of 627 Start Time End Time ANL_MW 10/5/2023 9:00 10/5/2023 10:00 10/5/2023 10:00 10/5/2023 11:00 1146.0 1100.0 10/5/2023 11:00 10/5/2023 12:00 1100.7 10/5/2023 12:00 10/5/2023 13:00 1081.7 10/5/2023 13:00...

AI summary The document presents a table with time intervals and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely related to energy consumption or production over several days in October 2023. It also indicates that the content is part of a partially confidential direct evidence appendix from a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 598 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 598 of 627 Start Time End Time ANL_MW 10/8/2023 7:00 10/8/2023 8:00 10/8/2023 8:00 10/8/2023 9:00 543.5 624.3 10/8/2023 9:00 10/8/2023 10:00 701.5 10/8/2023 10:00 10/8/2023 11:00 756.7 10/8/2023 11:00 10/8/20...

AI summary This document presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from October 8 to October 11, 2023. The data appears to be related to energy demand and load management for a regulatory proceeding.

COSS CA DR-9 Attachment 1 Page 599 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 599 of 627 Start Time 10/11/2023 5:00 End Time 10/11/2023 6:00 ANL_MW 780.0 10/11/2023 6:00 10/11/2023 7:00 917.8 10/11/2023 7:00 10/11/2023 8:00 1025.6 10/11/2023 8:00 10/11/2023 9:00 10/11/2023 9:00 10/11/2...

AI summary This document presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over a period of days in October 2023. The data is organized in time intervals, indicating the apparent net load during each hour. The data appears to be related to energy management and grid operations.

COSS CA DR-9 Attachment 1 Page 600 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 600 of 627 Start Time End Time ANL_MW 10/14/2023 3:00 10/14/2023 4:00 10/14/2023 4:00 10/14/2023 5:00 675.7 643.3 10/14/2023 5:00 10/14/2023 6:00 661.7 10/14/2023 6:00 10/14/2023 7:00 663.2 10/14/2023 7:00 10...

AI summary The document presents a table showing Apparent Net Load (ANL_MW) values over specific time intervals from October 14 to October 17, 2023. These values represent the apparent net load on the electricity grid during each time period, with some intervals having two ANL_MW values likely indicating different measurements or estimates.

COSS CA DR-9 Attachment 1 Page 601 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 601 of 627 Start Time End Time ANL_MW 10/17/2023 1:00 10/17/2023 2:00 10/17/2023 2:00 10/17/2023 3:00 883.2 890.7 10/17/2023 3:00 10/17/2023 4:00 885.8 10/17/2023 4:00 10/17/2023 5:00 883.9 10/17/2023 5:00 10...

AI summary The text presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over multiple time intervals from October 17 to October 19, 2023. The data indicates fluctuations in load demand throughout the day, with peak values observed during the early morning and late evening hours.

COSS CA DR-9 Attachment 1 Page 602 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 602 of 627 Start Time End Time ANL_MW 10/19/2023 23:00 10/20/2023 0:00 10/20/2023 0:00 10/20/2023 1:00 819.2 787.4 10/20/2023 1:00 10/20/2023 2:00 778.6 10/20/2023 2:00 10/20/2023 3:00 797.3 10/20/2023 3:00 1...

AI summary The document provides a table showing the apparent net load (ANL_MW) over a series of time intervals from October 19 to October 22, 2023. It contains data points indicating the load levels at different times, with some intervals showing significant fluctuations in demand.

COSS CA DR-9 Attachment 1 Page 603 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 603 of 627 Start Time End Time ANL_MW 10/22/2023 21:00 10/22/2023 22:00 10/22/2023 22:00 10/22/2023 23:00 978.9 892.4 10/22/2023 23:00 10/23/2023 0:00 862.2 10/23/2023 0:00 10/23/2023 1:00 814.8 10/23/2023 1:...

AI summary This document contains a table of apparent net load (ANL_MW) data over a 48-hour period from October 22 to October 25, 2023, with timestamps and corresponding values. It appears to be part of a regulatory proceeding and includes partially redacted confidential information.

COSS CA DR-9 Attachment 1 Page 604 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 604 of 627 Start Time End Time ANL_MW 10/25/2023 19:00 10/25/2023 20:00 10/25/2023 20:00 10/25/2023 21:00 921.9 886.3 10/25/2023 21:00 10/25/2023 22:00 830.2 10/25/2023 22:00 10/25/2023 23:00 764.3 10/25/2023...

AI summary The text presents a table showing the Apparent Net Load in Megawatts (ANL_MW) over various time intervals from October 25 to October 28, 2023. It provides detailed data on load fluctuations during specific hours, indicating patterns of energy demand over a multi-day period.

COSS CA DR-9 Attachment 1 Page 605 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 605 of 627 Start Time End Time ANL_MW 10/28/2023 17:00 10/28/2023 18:00 10/28/2023 18:00 10/28/2023 19:00 995.7 946.5 10/28/2023 19:00 10/28/2023 20:00 904.5 10/28/2023 20:00 10/28/2023 21:00 793.5 10/28/2023...

AI summary The text presents a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from October 28 to October 31, 2023. This data likely represents energy demand fluctuations within a specific region or system during this period.

COSS CA DR-9 Attachment 1 Page 606 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 606 of 627 Start Time End Time ANL_MW 10/31/2023 15:00 10/31/2023 16:00 10/31/2023 16:00 10/31/2023 17:00 1127.6 1207.8 10/31/2023 17:00 10/31/2023 18:00 1238.0 10/31/2023 18:00 10/31/2023 19:00 1248.4 10/31/...

AI summary The document presents a table showing the apparent net load in megawatts (ANL_MW) over various time intervals from October 31, 2023, to November 3, 2023. The data reflects fluctuations in electricity demand during different hours of the day.

COSS CA DR-9 Attachment 1 Page 607 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 607 of 627 Start Time End Time ANL_MW 11/3/2023 13:00 11/3/2023 14:00 11/3/2023 14:00 11/3/2023 15:00 1226.4 1203.0 11/3/2023 15:00 11/3/2023 16:00 1198.7 11/3/2023 16:00 11/3/2023 17:00 1205.1 11/3/2023 17:0...

AI summary This document presents a table showing apparent net load in megawatts (ANL_MW) over various time intervals from November 3, 2023, to November 6, 2023. The data reflects fluctuations in energy demand across different hours and days.

COSS CA DR-9 Attachment 1 Page 608 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 608 of 627 Start Time End Time ANL_MW 11/6/2023 11:00 11/6/2023 12:00 11/6/2023 12:00 11/6/2023 13:00 1239.9 1204.9 11/6/2023 13:00 11/6/2023 14:00 1178.2 11/6/2023 14:00 11/6/2023 15:00 1170.9 11/6/2023 15:0...

AI summary The document contains a table showing apparent net load (ANL_MW) values over specific time intervals from November 6 to November 9, 2023. It appears to be part of a regulatory proceeding, possibly related to energy load forecasting or grid management.

COSS CA DR-9 Attachment 1 Page 609 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 609 of 627 Start Time End Time ANL_MW 11/9/2023 9:00 11/9/2023 10:00 11/9/2023 10:00 11/9/2023 11:00 1225.0 1239.4 11/9/2023 11:00 11/9/2023 12:00 1230.9 11/9/2023 12:00 11/9/2023 13:00 1221.6 11/9/2023 13:00...

AI summary The text presents a table with timestamps and corresponding Apparent Net Load in Megawatts (ANL_MW) values, likely used for analyzing energy demand patterns over a specific period. It includes data spanning from November 9 to November 12, 2023, with detailed load measurements at hourly intervals. The document also references a partially confidential appendix, indicating that some information has been redacted.

COSS CA DR-9 Attachment 1 Page 610 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 610 of 627 Start Time End Time ANL_MW 11/12/2023 7:00 11/12/2023 8:00 11/12/2023 8:00 11/12/2023 9:00 1189.8 1237.6 11/12/2023 9:00 11/12/2023 10:00 1283.2 11/12/2023 10:00 11/12/2023 11:00 1274.3 11/12/2023...

AI summary The document provides a table with timestamps and corresponding Apparent Net Load (ANL_MW) values, indicating energy load data over several days in November 2023. This data appears to be part of a regulatory proceeding, likely related to energy generation and grid management.

COSS CA DR-9 Attachment 1 Page 611 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 611 of 627 Start Time End Time ANL_MW 11/15/2023 5:00 11/15/2023 6:00 11/15/2023 6:00 11/15/2023 7:00 1200.7 1355.1 11/15/2023 7:00 11/15/2023 8:00 1475.3 11/15/2023 8:00 11/15/2023 9:00 1517.1 11/15/2023 9:0...

AI summary This document contains a table showing apparent net load (ANL_MW) values across various time intervals from November 15, 2023, to November 18, 2023. It appears to be part of a regulatory proceeding related to energy usage and load management.

COSS CA DR-9 Attachment 1 Page 612 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 612 of 627 Start Time End Time ANL_MW 11/18/2023 3:00 11/18/2023 4:00 11/18/2023 4:00 11/18/2023 5:00 656.3 648.2 11/18/2023 5:00 11/18/2023 6:00 663.7 11/18/2023 6:00 11/18/2023 7:00 693.9 11/18/2023 7:00 11...

AI summary This document presents a table of apparent net load (ANL_MW) values over multiple time intervals from November 18 to November 21, 2023. The data shows fluctuations in load levels throughout the day and night, with peak values reaching approximately 1394.6 ANL_MW on November 19, 2023, and decreasing during nighttime hours.

COSS CA DR-9 Attachment 1 Page 618 of 627 p. p. 74
COSS CA DR-9 Attachment 1 Page 618 of 627 Start Time End Time ANL_MW 12/5/2023 15:00 12/5/2023 16:00 12/5/2023 16:00 12/5/2023 17:00 1407.2 1525.5 12/5/2023 17:00 12/5/2023 18:00 1604.6 12/5/2023 18:00 12/5/2023 19:00 1575.1 12/5/2023 19:0...

AI summary This document contains a table with time-stamped data on ANL_MW (apparent net load in megawatts) from December 5, 2023, to December 8, 2023. The data shows fluctuations in apparent net load over specific time intervals, which may be relevant for analyzing grid performance and energy demand patterns.

Cost of Service Study Process (NSUARB M11475) NSPI Responses to CA Data Requests p. p. 74
Cost of Service Study Process (NSUARB M11475) NSPI Responses to CA Data Requests 1 2 (c) For transmission, the generator's capacity is exceeded by customer load where the 3 generating facility radial line connects to the transmission syste...

AI summary The document discusses the process for determining the point at which local generation capacity exceeds customer load on transmission and distribution lines, emphasizing the dynamic nature of customer load and how distribution and transmission facilities are classified based on their connection and impact on the grid.

NON-CONFIDENTIAL p. pp. 74-183
NON-CONFIDENTIAL 1 Request DR-17: 2 - 3 Please list each distribution system region, provide its load, and identify its connection(s) to - 4 the transmission system, by voltage level. For example, distribution region X serving - 5 approxim...

AI summary The text requests the listing of distribution system regions with their load and transmission connections by voltage level, and asks to update a table from the 2013 proceeding.

11 p. p. 74
11 Transformer Capacity High-side Direct to Tertiary Voltage Distribution Voltage Total Percentage 69 kV 1,459 – 1,459 44% 138 kV 1,154 100 1,255 37% 345 kV – 637 637 19% Total 2,613 737 3,350 12

AI summary The text presents a table detailing transformer capacity across different voltage levels in Nova Scotia, showing the distribution of capacity and percentages for 69 kV, 138 kV, and 345 kV transformers.

7 p. p. 74
7 2 Please refer to the following update to the transformer capacity table. There are no 3 distribution customers supplied from 230 kV or 345 kV transformers. The value indicated 4 for 345 kV supplied via tertiary in the 2013 table is refe...

AI summary The document provides an update to a transformer capacity table, clarifying that 345 kV transformers are not used for distribution and that the previous value referred to reactors, not distribution plant. The table shows the distribution capacity for 69 kV and 138 kV transformers, along with their respective percentages.

COSS CA DR-27 Attachment 1 Page 1 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 1 of 9 Name Section Title A-1M.pdf Section A - Anchoring and Guying Offset Method of Measuring Line Angles A-2M .pdf Section A - Anchoring and Guying Guy Lead and Height Measurements A-3M.pdf Section A - Anc...

AI summary The document contains a list of technical manuals related to anchoring and guying procedures for electrical transmission and distribution lines, including various methods and measurements for different pole and line configurations.

COSS CA DR-27 Attachment 1 Page 2 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 2 of 9 Name Section Title C-34M.pdf Section C - Conductors, Sags and Te Sag and Tension Tables for No. 2 ACSR 6/1 (Poly) Ebony C-35M.pdf Section C - Conductors, Sags and Te Sag and Tension Tables for No. 1/0...

AI summary This document contains a list of technical files related to conductor sag and tension tables for various types of electrical conductors used in power transmission and distribution systems. These files are organized by section and title, providing detailed information on conductor specifications.

COSS CA DR-27 Attachment 1 Page 3 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 3 of 9 Name Section Title J-ED-15M.pdf Section J - Joint Use LOCATION OF REMOTE POWER CABINET FOR CATV J-ED-16M.pdf Section J - Joint Use MIN VERTICAL SEPARATION ON JOINT-USE POLES J-ED-17M.pdf Section J - J...

AI summary This document outlines a series of technical specifications and guidelines related to joint use of utility infrastructure, focusing on the installation and maintenance of power cabinets, cable clearances, pole attachments, and other related standards for electrical services.

COSS CA DR-27 Attachment 1 Page 4 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 4 of 9 Name P-ED-10M Section Section P - Poles and Settings Title Pole Marking Details P-ED-11M Section P - Poles and Settings Pole Setting Details in Solid Rock P-ED-12M Section P - Poles and Settings Pole...

AI summary The document contains a list of technical specifications and details related to pole marking and installation in various conditions, as well as framing details for distribution systems in rural areas. These specifications are organized by sections and include different types of poles and settings.

COSS CA DR-27 Attachment 1 Page 5 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 5 of 9 Name Section Title S-ED-16M.pdf Section S - Substations Three Phase Cable Termination for Underground Substation Exit Feeders on Double Circuit Structure 12 kV-25 kV (Rural) S-ED-17M.pdf Section S - S...

AI summary The document lists various technical specifications and construction standards for electrical infrastructure, including underground substation exit feeders, line post constructions, and special construction requirements for different environmental and structural conditions.

COSS CA DR-27 Attachment 1 Page 6 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 6 of 9 Name Section Title SP-ED-16M.pdf Section SP - Framing 10 Distribution Double Dead-end Structure-10 Line Angle 0°-20° 7.2 kV-14.4 kV SP-ED-17M.pdf Section SP - Framing 10 Distribution Single Dead-end S...

AI summary The text lists various documents related to distribution and secondary construction, including specifications for structures, transformers, and cable sizes for electrical services in Nova Scotia.

COSS CA DR-27 Attachment 1 Page 7 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 7 of 9 Name Section Title T-ED-13M.pdf Section T - Transformer Connections Transformer Installation 30 Wiring Diagram - Grd Wye/Grd Wye, 347/600V Service T-ED-14M.pdf Section T - Transformer Connections Tran...

AI summary This document lists various transformer installation and connection wiring diagrams and guidelines, including different configurations such as Grd Wye/Grd Wye, Floating Wye-Delta, and Open Wye/Open Delta for various voltage services.

COSS CA DR-27 Attachment 1 Page 8 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 8 of 9 Name Section Title Z-ED-53M SHT 2.pdf Section Z - Miscellaneous Equipmen Single Phase Regulator Installation Aluminum Platform Structure Z-ED-53M.pdf Section Z - Miscellaneous Equipmen Single Phase Re...

AI summary The text lists various documents related to Section Z - Miscellaneous Equipment, including installation details for single-phase regulators, aluminum platform structures, avian nest management, and wildlife protection measures on power lines.

COSS CA DR-27 Attachment 1 Page 9 of 9 p. p. 74
COSS CA DR-27 Attachment 1 Page 9 of 9 Name Section Title Z-ED-67M SHT 3 OF 4.pdf Section Z - Miscellaneous Equipmen Antenna with Lightning Rod Mount on Recloser Distribution Pole - Details C and D Z-ED-67M SHT 4 OF 4.pdf Section Z - Misce...

AI summary This document contains a list of technical specifications and installation details for various equipment and components related to electrical infrastructure, including antennas, lighting, sensors, and mounting systems on distribution poles and reclosers.

COSS CA DR-39 Attachment 1 Page 1 of 2 p. p. 74
COSS CA DR-39 Attachment 1 Page 1 of 2 Transformer Sub ID Sub Name Region 2016 Peak (MW) 2017 Peak (MW) 2018 Peak (MW) 2019 Peak (MW) 2020 Peak (MW) 2021 Peak (MW) 2022 Peak (MW) 2023 Peak (MW) 88H-T51 88H UP MUSQUODOBOIT Halifax 7.62 7.58...

AI summary The text presents a table showing the peak load data (in MW) for various transformers across different years from 2016 to 2023 in the Halifax region. This data is likely used for analyzing transformer performance and planning infrastructure needs.

COSS CA DR-40 Attachment 1 Page 1 of 6 p. p. 74
COSS CA DR-40 Attachment 1 Page 1 of 6 Feeder 100C-421 Canso Region 1.47 1.45 1.82 955 963 989 2021 Peak Load (MW) 2022 Peak Load (MW) 2023 Peak Load (MW) 2021 Customer Count 2022 Customers 2023 Customers 2023 Residential Customers 931 202...

AI summary The document presents a table with data on various feeders, including peak loads, customer counts, and lengths for different regions in Nova Scotia. It provides detailed metrics for the years 2021 to 2023, including residential, commercial, and industrial customer counts and line lengths.

COSS CA DR-40 Attachment 1 Page 6 of 6 p. p. 74
COSS CA DR-40 Attachment 1 Page 6 of 6 Feeder Region 2021 Peak Load (MW) 2022 Peak Load (MW) 2023 Peak Load (MW) 2021 Customer Count 2022 Customers 2023 Customers 2023 Residential Customers 2023 Commercial Customers 2023 Industrial Custome...

AI summary The document provides a detailed table of feeder data, including peak load, customer counts, and infrastructure lengths for various regions in Nova Scotia from 2021 to 2023. It includes specific details for different feeders across Western, Halifax, Valley, and Canso regions.

4 (c) For the 42 Feeder Sections sampled in the Minimum System Study completed in 2022, the 5 specific data related to the overall mix of service drop wire types is as follows: p. p. 44
4 (c) For the 42 Feeder Sections sampled in the Minimum System Study completed in 2022, the 5 specific data related to the overall mix of service drop wire types is as follows: Service Drop Wire Types Length (Km) AASC Triplex Poly #2 30.53...

AI summary The text provides data on the distribution of service drop wire types across 42 feeder sections in a 2022 Minimum System Study. It lists the length of each wire type in kilometers, highlighting the prevalence of various AASC and ACSR triplex poly and bare wires.

PARTIALLY CONFIDENTIAL 2026-2027 GRA Direct Evidence Appendix 12A(2) Page 798 of 1218 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 61
PARTIALLY CONFIDENTIAL 2026-2027 GRA Direct Evidence Appendix 12A(2) Page 798 of 1218 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2022-2024 GRA SR-01 Attachment 1a Page 8 of 12 COSS CA DR-53 Attachment 1 Page 8 of 62 Nova Scotia Power Cost...

AI summary The text discusses the methodology used in the Nova Scotia Power Cost of Service Study, including the allocation of energy, demand, and customer factors, as well as the detailed breakdown of investments in distribution poles, overhead and underground wires, and the allocation of line transformers and services based on demand and customer classes.

REDACTED p. p. 124
REDACTED 1 (c) The unmetered load shape is an assumed shape that represents primarily streetlight use (on 2 at night, varying with hours of daylight) as this is the bulk of the class. Date Filed: May 23, 2024 NSPI (CA) DR-58 Page 2 of 2

AI summary The document discusses the assumption of an unmetered load shape primarily representing streetlight use, which varies with hours of daylight. This assumption is significant for modeling purposes in the context of the NSPI DR-58 filing.

NON-CONFIDENTIAL p. pp. 124-183
NON-CONFIDENTIAL 1 Request DR-61: 2 3 Please explain how NS Power's minimum system method study model sets the minimum 4 equipment size for each of the following: 5 6 (a) Primary poles 7 8 (b) Secondary poles 9 10 (c) Primary conductor 11...

AI summary The response to Request DR-61 explains that NS Power's Minimum System Study (MSS), conducted by Concentric in the 2023-2024 GRA, determined the minimum equipment sizes for primary and secondary poles and conductors based on a sample of 42 feeders and discussions with NS Power's engineering personnel.

1 Prevalence in the Industry p. p. 168
1 Prevalence in the Industry - 2 Utilities throughout Canada and United States routinely use the MSS or the Zero-Intercept Study to - 3 classify a portion of the distribution assets as customer-related and demand-related. As described - 4...

AI summary This section discusses how utilities in Canada and the U.S. use the MSS or Zero-Intercept Study to classify distribution assets as customer-related or demand-related. It notes that most utilities classify these assets between customer and demand, with the exception of NS Power, where half of the utilities use MSS for classification.

Figure 2: Relationship between Feeder Length and Customers by Geography p. p. 172
Figure 2: Relationship between Feeder Length and Customers by Geography Figure 2 illustrates that geographic dispersion of the customers and where they are located and not their peak demand drives the length of the feeder. As stated previo...

AI summary Figure 2 shows that the geographic dispersion of customers influences feeder length. Professor Bonbright prefers classifying minimum-sized distribution costs as customer-related. The Ontario Energy Board (OEB) links customer density to distribution asset costs, with specific percentages for different density ranges. NS Power has low customer density, which would lead to 60% of poles, conductors, and line transformers being classified as customer-related under OEB guidelines.

1 Request DR-1: p. p. 63
1 Request DR-1: 2 - 3 Tabulated hourly charging and discharging profile for all Battery Energy Storage (BESS) - 4 (i.e., including behind-the-meter) on the day of the winter peak demand in 2030. Please also - 5 include hourly imports and e...

AI summary Request DR-1 asks for a tabulated hourly charging and discharging profile for all Battery Energy Storage (BESS), including behind-the-meter, on the day of the winter peak demand in 2030, along with hourly imports and exports on that day.

COSS IG DR-2 Attachment 1 Page 2 of 4 p. p. 63
COSS IG DR-2 Attachment 1 Page 2 of 4 2024 Actuals (GWh) Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Total Battery 12.7 11.3 9.7 11.1 16.0 13.3 11.6 11.3 12.5 15.6 9.7 16.2 150.9 Total 1212.7 1105.0...

AI summary The document presents monthly energy generation data for 2024, including battery energy storage system (BESS) output and total generation. The data spans from January to December, with the total generation amounting to 11,515.9 GWh and BESS contributing 150.9 GWh.

REDACTED COSS IG DR-3 Attachment 1 Page 3 of 4 p. p. 63
REDACTED COSS IG DR-3 Attachment 1 Page 3 of 4 Year BUTU EBS Unmetered Transmission Distribution Total Sales before DSM Losses Losses p10 p50 p90 2024 30.3 - 76.9 299.3 473.7 11,320.8 11,549.9 11,784.2 2025 30.3 20.7 76.9 299.1 476.3 11,27...

AI summary The document presents a table with data on energy losses and sales from 2024 to 2030, including metrics for BUTU, EBS, and distribution losses. It also references a partially confidential appendix from a regulatory proceeding.

REDACTED p. p. 99
REDACTED 1 Request DR-14: 2 3 How many large industrial customers/accounts are connected to NSPI's distribution 4 network and charged the distribution adder? 5 6 • Note, Per SR-01 Att 03 PCON Updated the total appears to be 36 total large...

AI summary The document addresses a request regarding the number of large industrial customers connected to NSPI's distribution network and charged a distribution adder. It notes that 36 large industrial accounts are connected, with 8 on the transmission network and 28 at primary voltage, and confirms the accuracy of this information.

Tufts Cove 3 Tufts Cove 4 Tufts Cove 5 Tufts Cove 6 CT - Burnside 1 CT - Burnside 2 CT - Burnside 3 CT - Burnside 4 CT - p. p. 119
Tufts Cove 3 Tufts Cove 4 Tufts Cove 5 Tufts Cove 6 CT - Burnside 1 CT - Burnside 2 CT - Burnside 3 CT - Burnside 4 CT - Point Point Tufts Cove Tufts Cove Tufts Tufts Cove Tufts Cove Tufts Cove CT - CT - CT - CT - CT - 2043 0.00 0.00 0.00...

AI summary The text presents a table containing numerical data, likely related to energy generation or distribution, with years ranging from 2043 to 2050 and various points or locations such as 'Tufts Cove' and 'CT - Burnside'. The data appears to be associated with energy modeling or planning, potentially related to capacity or load management.

3. Distribution system sub-functionalization and classification p. p. 22
3. Distribution system sub-functionalization and classification During the 2013 COSS Proceeding, in its Reply Evidence, the Company recommended that a study to examine poles and conductors inventories be undertaken, and this was committed...

AI summary The text discusses the sub-functionalization of distribution poles and conductors between primary and secondary voltage levels, as part of the 2013 COSS Proceeding. The Company conducted a study using data and replacement cost information to split distribution facilities into primary and secondary categories, which is necessary due to the lack of specific cost identification in financial records.

COSS SBA DR-6 Attachment 1 Page 17 of 24 p. p. 26
COSS SBA DR-6 Attachment 1 Page 17 of 24 011 SOLID FUEL 012 NATURAL GAS 013 OIL 019 THERMAL GENERAL 021 WIND 022 HYDRO 023 TIDAL 024 BIOMASS 025 SOLAR 029 RENEWABLES GENERAL 091 BY PRODUCT SERVICES 099 POWER GENERATION GENERAL 111 SUBSTATI...

AI summary The document contains a list of fuel types, location segments, and other operational categories used in the regulatory proceeding. It includes information on power generation, transmission, distribution, and corporate segments, as well as location-based classifications.

19 p. p. 83
19 Modeled Peak (MW) Res Heat (MW) EV (MW) DR (MW) C&I Elect. (MW) Large Cust. (MW) DSM (MW) Firm Peak (MW) Inter. Cust. (MW) System Peak (MW) 2030 1,977 95 64 -38 152 111 -119 2,243 152 2,434 20

AI summary The table presents modeled peak demand and various load components for the year 2030, including residential heating, electric vehicles, demand response, commercial and industrial electricity, large customers, demand-side management, firm peak, interconnection customers, and system peak, measured in megawatts (MW).

Classification / Allocation Methods p. pp. 118-119
Classification / Allocation Methods - Generation costs present conceptual challenges - How to separate capacity related from demand related capital (there is no single, valid method) - > Generation assets provide both capacity and energy -...

AI summary The document discusses the conceptual challenges in classifying and allocating generation, transmission, and distribution costs. It highlights that generation costs are difficult to separate into capacity and demand-related components, while transmission is primarily capacity-related and distribution poses definitional challenges. Customer costs are largely based on customer-related allocations.

Distribution Classification / Allocation Methodologies p. pp. 125-126
Distribution Classification / Allocation Methodologies - > NS Power is consistent with standard practices - > Typical approach across utilities: - ➤ Use Minimum System Method for classification of lines and transformers - ➤ Multiple-CP for...

AI summary The text discusses NS Power's use of standard classification and allocation methodologies in distribution, including the Minimum System Method, Multiple-CP, and NCP allocation. It raises a question about the implications of modernization, specifically whether the 4D's impact on CA or RD is causal or driven by policy.

Table 3: Functionalization methodology used for distribution assets and expenses p. p. 136
Table 3: Functionalization methodology used for distribution assets and expenses Number of Functions Number of Utilities Percent of Utilities 10-11 3 27 8-9 2 18 6-7 2 18 4-5 4 36 Totals 11 \ Nova Scotia Power placement

AI summary Table 3 outlines the functionalization methodology used for distribution assets and expenses, showing the number of functions, utilities, and percentages. Nova Scotia Power is noted as having 10-11 functions.

Distribution Classification Methods p. p. 141
Distribution Classification Methods Table 8: Classification Method for Distribution Lines and Transformers Method Number of Utilities Percent of Utilities Minimum System 4 36 Zero Intercept 0 0 Both Minimum and Zero Intercept 3 27 Other 3...

AI summary The text presents a table categorizing distribution classification methods used by utilities, with Nova Scotia Power being noted as the sole utility using the 'Other' category. The table includes methods such as Minimum System, Zero Intercept, and Judgment 50/50, along with the number and percentage of utilities using each method.

COS Generic Hearing (M05473) - Deferred Projects p. pp. 183-184
COS Generic Hearing (M05473) - Deferred Projects No Project Status 1 &2 Capacity contribution of ERIS and NRIS wind Consistent with Board's directive the COS treatment in BCF and GRA proceedings aligned with NSPI's planning assumption base...

AI summary The document discusses deferred projects under the COS Generic Hearing (M05473), including the capacity contribution of wind projects, treatment of Lingan Units 1 & 2 as base load units, a survey of the distribution system, and class load data collection and analysis. These projects are aligned with planning assumptions and regulatory proceedings.

Another Twist: Adjusted Net Load is a Better Metric for Reliability p. p. 25
Another Twist: Adjusted Net Load is a Better Metric for Reliability - Another problem with thinking of demand as the cause of capacity requirements is that other factors (solar, wind, imports) affect reliability - NS Power has adopted net...

AI summary The text discusses the limitations of using demand as the sole metric for capacity requirements, highlighting that other factors like solar, wind, and imports also influence reliability. It notes that NS Power has adopted net load planning practices.

Comments on NB Power COSS Filings (April 11, 2024) Page 3 of 4 p. p. 37
Comments on NB Power COSS Filings (April 11, 2024) Page 3 of 4 General Service II Secondary Distribution 1.59% 1.60% Small Industrial Small Industrial Transmission 0.14% 0.14% Small Industrial Primary Distribution 2.42% 2.41% Small Industr...

AI summary The document presents a table of distribution and transmission sales percentages and raises a question about whether the Probability of Dispatch (POD) method is equivalent to the Hybrid Cost Model (HCM) method.

Issue 3a - Functionalization 'transmission' vs. distribution? p. p. 55
Issue 3a - Functionalization 'transmission' vs. distribution? SBA View-The SBA believes that the majority of time the methodology currently used is adequate. However distributed energy resources will increasingly be making use of distribut...

AI summary The SBA acknowledges that the current methodology is mostly adequate but notes that distributed energy resources are increasingly using distribution-level voltage lines, raising questions about how distribution costs can be functionalized as transmission costs.

Issue 3c - Classification between customer and demand costs p. pp. 55-61
Issue 3c - Classification between customer and demand costs SBA View – The SBA strongly believes that any application of a Minimum System Study to classify distribution system costs on a customer basis is inappropriate and highly hypotheti...

AI summary The SBA argues that applying a Minimum System Study to classify distribution system costs on a customer basis is inappropriate and highly hypothetical. They also suggest that NSP should separate and allocate service drop costs on a customer basis, though they have not fully addressed remaining issues and plan to file supplemental comments.

Minimum System Study – 2022-24 GRA COSS p. p. 64
Minimum System Study – 2022-24 GRA COSS Concentric Energy Advisors prepared a Minimum System Study for NS Power for the COSS used in the 2022-2024 GRA. Separate classifications were determined for Poles, Overhead Conductors, and Undergroun...

AI summary Concentric Energy Advisors conducted a Minimum System Study for NS Power as part of the 2022-2024 GRA COSS. The study classified distribution assets such as poles, overhead, and underground conductors, and included functionalizing distribution assets between primary and secondary systems.

Disaggregated Results: p. pp. 64-65
Disaggregated Results: Primary Secondary Poles Overhead Underground Conductors Conductors Poles Overhead Underground 1 0103 1 0103 Conductors Conductors Demand 24% 62% 84% 30% 17% 18% Customer 76% 38% 16% 70% 83% 82%

AI summary The table presents disaggregated results showing the distribution of demand and customer percentages across different infrastructure categories, such as poles, overhead, and underground conductors, with varying percentages for primary and secondary classifications.

Literature review and industry used of distribution losses methodology p. pp. 75-76
Literature review and industry used of distribution losses methodology - Com Ed (Chicago) - Hydro One (Ontario) Hypothesis

AI summary The text begins a literature review on the industry use of distribution losses methodology, citing examples such as Com Ed in Chicago and Hydro One in Ontario. It is followed by a hypothesis section, though the content is not detailed in the provided text.

Hypothesis developed that is currently being tested on a sample p. p. 76
Hypothesis developed that is currently being tested on a sample - Working to develop a table of annual energy delivered, peak losses and annual energy losses by network segment - Working to develop a table of loss allocation per customer t...

AI summary The hypothesis being tested involves developing tables to track annual energy delivered, peak and annual energy losses by network segment, and loss allocation per customer type based on their location on the system, such as transmission.

Hypothesis includes greater level of complexity vs. accuracy/precision p. pp. 76-77
Hypothesis includes greater level of complexity vs. accuracy/precision - Annual losses, 8760 Data vs. load factor calculations - Non-Technical Losses, assumption vs. calculations - Secondary Configurations, sampling vs assumptions - Distri...

AI summary The text discusses the complexity of data and assumptions in various aspects of energy loss calculations, including annual losses, non-technical losses, secondary configurations, and distribution transformer no-load losses, comparing data with assumptions and simulations.

7.No Sub-functionalization of Poles and Conductors between Primary and Secondary p. pp. 111-112
7.No Sub-functionalization of Poles and Conductors between Primary and Secondary - ➢ Purpose: Analyse the impact of removing the distinction between primary and secondary distribution costs. - ➢ Model Notes: All secondary classifications a...

AI summary This section discusses the analysis of removing the distinction between primary and secondary distribution costs, noting that secondary classifications will be moved to primary and allocated using existing primary allocators, shifting cost responsibility from secondary-connected classes to primary-connected classes.

Project Objectives p. pp. 173-174
Project Objectives To update the Loss Allocation methodology for NSPI customer types leveraging NSPI data, including: - Transmission data model - Distribution data model - Secondary data models - AMI data and +MV90 data - Georeferenced Inf...

AI summary The project aims to update the Loss Allocation methodology for NSPI customer types by utilizing various data sources, including transmission, distribution, and georeferenced information system (GIS) data, to develop a table of loss allocation per customer type based on their location on the system.

Methods to evaluate energy delivered and annual energy losses p. pp. 175-187
Methods to evaluate energy delivered and annual energy losses Network segments Phase 1 - Method 1 Transmission Lines PSSe software simulations using 8760 data Substations Power Transformers No-Load Losses Load Losses Inventory calculations...

AI summary The document outlines methods for evaluating energy delivered and annual energy losses across various network segments, including the use of software simulations, inventory calculations, and data from GIS and industry reports.

Preliminary results p. pp. 176-177
Preliminary results Peak Power Annual Energy Annual (delivered by (delivered by Power Loss Power Loss Annual Annual Energy Loss component) component) at Peak at Peak Energy Loss Energy Loss as % of total Network Segment (MW) (GW-h) (MW) (%...

AI summary The text presents preliminary results from a regulatory proceeding, detailing power and energy loss across various network segments in Nova Scotia. It includes data on peak power, annual energy, and loss percentages for different components such as transmission lines, substations, distribution lines, and secondary lines. The data highlights technical and non-technical losses and their distribution across customer types.

Overall Results p. pp. 185-186
Overall Results Network Segment Peak Power (delivered by component) (MW) Annual Energy (delivered by component) (GW-h) Power Loss at Peak (MW) Power Loss at Peak (% of total) Annual Energy Loss (GW-h) Annual Energy Loss (% of total) Annual...

AI summary The table presents overall results for different network segments, including power and energy delivery metrics, power loss at peak, and annual energy loss percentages. Transmission and distribution segments show varying levels of loss, with transmission having the highest power loss percentage.

- Hourly load flows on 7 feeders in CYME resulted in a 49.3% load factor and a 28.3% loss factor closely aligning with formula-based results of 31.6% p. pp. 188-189
- Hourly load flows on 7 feeders in CYME resulted in a 49.3% load factor and a 28.3% loss factor closely aligning with formula-based results of 31.6% Distribution information - NSPI Total networks Annual Peak Load (PL) (kW) Energy in a yea...

AI summary The hourly load flows on 7 feeders in CYME resulted in a 49.3% load factor and a 28.3% loss factor, closely aligning with formula-based results of 31.6%. The data includes distribution information with metrics like annual peak load, energy in a year, load factor, and loss factor at different levels.

Secondary Losses p. p. 189
Secondary Losses - GIS and billing data used to determine secondary network typical configuration - Different secondary configurations considered : Polemounted, Padmount, Vault - CYME load flow analysis performed using AMI data to estimate...

AI summary The document discusses the analysis of secondary losses in the electricity distribution network. It outlines methods such as GIS and billing data analysis, CYME load flow analysis using AMI data, and the application of industry formulas for loss factor calculation. Different secondary configurations like pole-mounted, padmount, and vault are considered.

Total Energy Losses = ∑ Segment Losses p. pp. 196-197
Total Energy Losses = ∑ Segment Losses (1) kWH SALES (2) ANNUAL ENERGY PER CUSTOMER (GWh) (3) LOSS ALLOCATION FACTOR (%) (4) TRANSMISSION ENERGY LOSS (GWh) (5) TRANSMISSION ENERGY LOSS (%) (6) DISTRIBUTION ENERGY LOSS (GWh) (7) DISTRIBUTIO...

AI summary The document presents a detailed breakdown of total energy losses across various customer segments, including domestic, industrial, and municipal, with percentages of losses attributed to transmission, distribution, secondary systems, and non-technical factors. It highlights the allocation of losses and their impact on different customer groups.

Total demand losses = ∑ Segment Demand Losses p. pp. 198-199
Total demand losses = ∑ Segment Demand Losses Class MWh Sales Non-Coincident Demand Coincident Demand Demand Loss (kW) Demand Loss % Trans Demand Loss (kW) Dist Demand Loss (kW) Sec Demand Loss (kW) Non-Tech Demand (kW) Residential 5,213,7...

AI summary The text presents a table summarizing demand losses across various customer classes in Nova Scotia, including metrics such as MWh sales, non-coincident and coincident demand, demand loss percentages, and breakdowns of transmission, distribution, and secondary demand losses.

Results p. pp. 199-1
Results Class (1) ENERGY LINE LOSS (2023) % (2) DEMAND UNE LOSS % (3) ENERGY LINE LOSS (2026) % (2) DEMAND LINE LOSS % (1) RESIDENTIAL 9.1% 15.9% 7.8% 14.0% (5) SMALL GENERAL 8.4% 12.7% 8.7% 11.9% (8) GENERAL 5.7% 8.3% 8.2% 10.8% (11) GENE...

AI summary The document presents a table showing line loss percentages for different classes of energy and demand across years 2023 and 2026. The data reflects varying losses across residential, industrial, and municipal categories, highlighting differences in efficiency and performance.

2026-2027 GRA Direct Evidence Appendix 12A(5) 1 Page 13 of 31 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 32
2026-2027 GRA Direct Evidence Appendix 12A(5) 1 Page 13 of 31 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Status Quo CTD Referen ce NS Power Position (Pre Resolution Session) NS Power Updated Position (Following Resolution Session) Justifi...

AI summary The document outlines the NS Power position on the distribution classification of batteries, maintaining the status quo for substations and poles & fixtures. It references Issue 3c & 4 and discusses the classification of batteries as distribution assets based on the weighted average of remaining distribution assets.

2026-2027 GRA Direct Evidence Appendix 12A(6) Page 4 of 6 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 49
2026-2027 GRA Direct Evidence Appendix 12A(6) Page 4 of 6 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - Session 7: June 3, 2024 - o Full-day session - o Topics: Distribution functionalization (transmission vs distribution); subfunctionaliz...

AI summary The sessions discussed distribution functionalization, cost of service treatment for bundled and unbundled services, and line loss studies. NS Power presented their positions, and intervenors provided feedback. Topics included allocation of service drop costs, use of AMI data, and alignment of OATT with COSS.

6 DISTRIBUTION p. p. 92
6 DISTRIBUTION - 6.1 FUNCTIONALIZATION - 6.1.1 DISTRIBUTION FUNCTIONALIZATION METHODOLOGY - 6.1.1.1 NSP CURRENT APPROACH - NS Power has eight categories of distribution sub-functions: - Substations - Poles & Fixtures (primary and secondary...

AI summary The document outlines NSP's current approach to distribution functionalization, which categorizes distribution sub-functions into eight categories including substations, poles, lines, transformers, services, and meters.

12 6.1.1.3 ELENCHUS OPINION p. p. 92
12 6.1.1.3 ELENCHUS OPINION - 13 NS Power's functionalization of Distribution to sub-functions is reasonable and - 14 consistent with the sub-functions used by other vertically-integrated utilities across - 15 Canda. This level of sub-func...

AI summary The text argues that NS Power's division of Distribution into sub-functions is reasonable and consistent with other utilities in Canada. It also suggests that creating a distribution storage sub-function is prudent, even without current facilities, due to future developments in the electricity sector and potential cost savings.

6 Table 6 – Distribution Classifications p. p. 94
6 Table 6 – Distribution Classifications Distribution Sub-Function Classification Methodology Substations 100% Demand Poles & Fixtures (primary and secondary) Minimum System Method Overhead & Underground Lines (primary and secondary) Minim...

AI summary Table 6 outlines the distribution classifications for various sub-functions, such as substations, poles, and transformers, using methodologies like 100% demand, minimum system method, and direct assignment. Substations and transformers are classified 100% as demand.

2026-2027 GRA Direct Evidence Appendix 12B Page 42 of 55 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 95-99
2026-2027 GRA Direct Evidence Appendix 12B Page 42 of 55 REDACTED (CONFIDENTIAL INFORMATION REMOVED) -42- NSP COSS Consultation Report Draft April 25, 2025 - 1 In Elenchus' view the minimum system method is the method most aligned with cos...

AI summary The document discusses NS Power's current and proposed methodologies for classifying and allocating distribution storage and demand-classified distribution. Elenchus supports NS Power's approach, arguing that using a weighted average classification aligns with cost causality principles and appropriately allocates distribution storage costs.

3 Table 7 – Distribution Allocation p. p. 100
3 Table 7 – Distribution Allocation Distribution Sub-Function/Classification Allocation Methodology Substations - Demand Primary Non-Coincident Peak (at bulk power station) Poles & Fixtures (primary) - Demand Primary Non-Coincident Peak (b...

AI summary Table 7 outlines the distribution allocation methodologies for various sub-functions and classifications within the Nova Scotia Power distribution system. Each sub-function is allocated based on specific metrics such as peak demand, customer count, or weighted averages.

1 6.3.1.2 NSP PROPOSED APPROACH p. p. 100
1 6.3.1.2 NSP PROPOSED APPROACH - 2 NS Power is proposing to maintain the allocation methodology for each distribution sub- - 3 function. - 4 The distribution storage sub-function will be included with land, easements & survey, and - 5 oth...

AI summary NSP proposes to maintain the current allocation methodology for distribution sub-functions, including the distribution storage sub-function, which will be allocated using the same weighted-average approach as other sub-functions.

REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 GRA Direct Evidence Appendix 12C Page 7 of 25 p. pp. 118-119
REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 GRA Direct Evidence Appendix 12C Page 7 of 25 Power System Line Loss Study Technical Report Methodology to Compute Loss Allocation Factors Figure 1: Map of NS Power's major fac...

AI summary This section of the document outlines NS Power's vertically integrated operations, including its distribution system infrastructure such as power lines, transmission towers, distribution poles, and substations. It references a technical report on the methodology for computing loss allocation factors.

Table 2: 2023 peak load flow study p. p. 122
Table 2: 2023 peak load flow study DLine 2023 Peak CYME Results Customer Class Modeled kW Customer Count 10%+ incr loss (kW) 10%- incr loss (kW) Marginal Demand Loss % DOMESTIC 1,132,870 512,963 8,355 -7,561 7.0% SMALL GENERAL 60,099 27,24...

AI summary Table 2 presents the results of a 2023 peak load flow study, showing varying marginal demand losses across different customer classes. Domestic customers had the highest marginal demand loss at 7.0%, while large general customers had the lowest at 2.3%.

REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 GRA Direct Evidence Appendix 12C Page 11 of 25 p. pp. 122-123
REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 GRA Direct Evidence Appendix 12C Page 11 of 25 MUNICIPAL/BUTU Power System Line Loss Study Technical Report Methodology to Compute Loss Allocation Factors The marginal demand l...

AI summary This technical report discusses the methodology used to compute loss allocation factors (LAF) for a power system line loss study. It outlines the distribution loss sensitivity, the load factor calculation, and validation using CYME simulations. The report uses data from a 2023 study and industry-accepted formulas to estimate annual energy losses and validates the results with simulation data.

Peak Losses (kW) Substation NLL Peak (kW) Substation NLL Energy (kWh) Annual Energy Loss - Distribution (kWh) Annual Energy Loss % p. p. 124
Peak Losses (kW) Substation NLL Peak (kW) Substation NLL Energy (kWh) Annual Energy Loss - Distribution (kWh) Annual Energy Loss % 52,550 1,780 15,592,800 145,320,400 70 2,93% 0.10% 0.19% 1.75% 1.94% Table 5: Distribution annual energy loss

AI summary Table 5 presents data on distribution annual energy loss, including peak losses, substation losses, and energy loss percentages. The table highlights significant energy loss figures, indicating inefficiencies in the distribution system.

Table 7: 2026 annual energy losses per segment p. p. 127
Table 7: 2026 annual energy losses per segment Net work segments Peak power (delivered by component) (MW) Annual energy (delivered by component) (GWh) Power loss at peak (MW) Power loss at peak (% of total) Annual energy loss (GWh) Annual...

AI summary Table 7 presents the 2026 annual energy losses across various segments of the power system, including transmission, distribution, secondary lines, and non-technical losses. It details metrics such as peak power, annual energy delivered, power loss, and energy loss percentages.

Table 9: Proportional allocation of losses per customer class p. p. 131
Table 9: Proportional allocation of losses per customer class Class Secondary Primary Transmission Non-Technical (1) Domestic 100% 100% 100% 100% (5) Small General 100% 100% 100% 100% (8) General 94% 100% 100% 100% (11) General Large 0% 10...

AI summary Table 9 provides the proportional allocation of energy losses per customer class across different system segments. The table shows that some classes contribute more to losses in specific segments, and a recalibration process was performed to normalize these contributions based on proportional energy consumption, ensuring accurate representation of each class's overall contribution.

Table 10: Proportion recalibration p. p. 131
Table 10: Proportion recalibration Class Secondary Primary Transmission Non-Technical (1) Domestic 63.3% 56.4% 49.1% 56.4% (5) Small General 4.3% 3.8% 3.3% 3.8% (8) General 25.3% 24.0% 20.9% 24.0% (11) General Large 0.0% 3.9% 3.4% 3.9% (12...

AI summary Table 10 presents the proportion recalibration for different customer classes, showing percentages allocated to secondary, primary, transmission, and non-technical categories. The data reflects varying distributions across domestic, small general, general, general large, and small industrial classes.

Table 11: Loss allocation factor and energy loss results p. p. 134
Table 11: Loss allocation factor and energy loss results (1) kWH SALES (5) ANNUAL ENERGY LOSS PER CLASS (GWh) (6) LOSS ALLOCATION FACTOR (%) (7) TRANSMISSION ENERGY LOSS (GWh) (8) TRANSMISSION ENERGY LOSS (%) (9) DISTRIBUTION ENERGY LOSS (...

AI summary Table 11 presents data on energy loss allocation factors and energy loss results across different customer classes. The table includes metrics such as kilowatt-hour sales, annual energy loss, transmission and distribution energy loss, and non-technical energy loss, with percentages and values for each category.

7.2 Coincident demand loss allocation factors p. p. 135
7.2 Coincident demand loss allocation factors The coincident demand loss can be calculated for each customer class by multiplying the class contribution to peak demand by the results of the class demand loss percentage for each network seg...

AI summary The document details the calculation of coincident demand loss allocation factors for various customer classes in Nova Scotia. Transmission losses are derived from PSS/E simulations, while distribution and secondary losses are calculated using CYME and inventory analysis. The table summarizes the loss allocation factors by class, highlighting percentages and kW values.

REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 GRA Direct Evidence Appendix 12C Page 24 of 25 p. pp. 135-136
REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2026-2027 GRA Direct Evidence Appendix 12C Page 24 of 25 Power System Line Loss Study Technical Report Methodology to Compute Loss Allocation Factors These non-coincident demand loss all...

AI summary This technical report discusses the methodology used to compute non-coincident demand loss allocation factors, derived from coincident demand loss results and adjusted using an 80/20 factor based on transformer loss analysis in CYME. The report highlights the relationship between losses and current flow and provides results by class.

Table 13: Non-coincident demand loss allocation factor p. p. 136
Table 13: Non-coincident demand loss allocation factor Cutomer class Secondary Non-coin Demand Loss % Primary Non-coin Demand Loss % Bulk Power Tx Non-coin Demand Loss % Total Domestic 3.54% 3.82% 0.96% 8.32% Small General 4.17% 2.41% 0.60...

AI summary Table 13 presents the non-coincident demand loss allocation factors for various customer classes in the Nova Scotia regulatory proceeding. It shows the percentage of demand loss allocated to different categories such as Domestic, Small General, General, Large General, Small Industrial, Medium Industrial, Large Industrial, and Municipal customers.

8. Analysis p. p. 137
8. Analysis To assess the evolution of system losses, a comparison is made between the forecasted 2023 results and the projected 2026 energy losses across all network segments, as represented in the table below:

AI summary The analysis section compares forecasted 2023 and projected 2026 energy losses across all network segments to assess the evolution of system losses.

Table 14: Comparison of 2023 forecasted results and 2026 results p. p. 137
Table 14: Comparison of 2023 forecasted results and 2026 results Class Energy Line Loss (2023) % Demand Line Loss (2023) % Energy Line Loss (2026) % Demand Line Loss (2026) % (1) RESIDENTIAL 9.10% 15.90% 8.24% 13.90% (5) SMALL GENERAL 8.40...

AI summary Table 14 compares forecasted energy and demand line losses in 2023 and 2026 across different customer classes. The data shows a general decrease in losses for most categories from 2023 to 2026, indicating improvements in efficiency or distribution.

N-142026-2027 GRA OP 01-15 - Redacted 13 passages
CA8 – Distribution Additions as % of Distribution Plant p. pp. 161-162
CA8 – Distribution Additions as % of Distribution Plant - ◼ On a 5-year average basis, NSPI Distribution Additions as a Percent of Distribution Plant is above the peer group median - ◼ NSPI Distribution Additions as a Percent of Distributi...

AI summary NSPI's Distribution Additions as a Percent of Distribution Plant is above the peer group median on a 5-year average basis. While NSPI's Distribution Additions increased by 14% in nominal terms from 2019 to 2023, the peer median increased by 4%. NSPI's Distribution Plant increased by 23%, while the peer median increased by 31% over the same period.

South Canoe Wind Farm p. p. 196
South Canoe Wind Farm km of Line Voltage Transmission 1,634 69 kV 1,889 138 kV 1,242 230 kV 491 345 kV 5,256 2026-2027 GRA OP-04 Attachment 1 Page 3 of 3 REDACTED (CONFIDENTIAL INFORMATION REMOVED) km of Line Voltage Distribution 11,909 25...

AI summary The document provides details about the South Canoe Wind Farm, including the length and voltage of transmission and distribution lines, as well as other assets associated with the Transmission & Distribution systems managed by NS Power.

A Grid With Intelligence p. pp. 184-185
A Grid With Intelligence Accommodating and serving the load growth of the future, including customerowned and "behind the meter" assets: - EVs - Rooftop solar - On-premise equipment - Microgrids - Inverters

AI summary The document discusses the need for a more intelligent grid to accommodate future load growth, including customer-owned and behind-the-meter assets such as EVs, rooftop solar, on-premise equipment, microgrids, and inverters.

2026-2027 GRA OP-12 Attachment 1 Page 357 of 684 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 185-186
2026-2027 GRA OP-12 Attachment 1 Page 357 of 684 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Unidirectional flow of power, little communication about the state of the system.

AI summary The text describes a unidirectional flow of power within the system and notes the lack of communication about the system's state. It includes images that may provide further context on the topic.

Automatic Lateral Switch p. p. 191
Automatic Lateral Switch - Early detection of faults, prior to fuse blowing - TECO plan will see 8,000 installed (~1,150 today)

AI summary The document discusses the installation of Automatic Lateral Switches for early fault detection, with a plan to install 8,000 units, up from the current 1,150.

Overhead Line Sensors p. pp. 191-192
Overhead Line Sensors - Line sensing vs. simple fault indication - TECO plan will see 8,500+ installed (<100 today) Automating processes Reducing human effort (diagnostics; truck rolls) Saving time Unlocking new efficiencies

AI summary The document discusses the implementation of overhead line sensors, highlighting the shift from simple fault indication to advanced line sensing. It notes the TECO plan's goal of installing over 8,500 sensors, a significant increase from the current number. Benefits include automation, reduced human effort, time savings, and increased efficiency.

Wire down detection and monitoring p. p. 192
Wire down detection and monitoring Quicker response, with no need for customers to call in

AI summary The text discusses wire down detection and monitoring, emphasizing quicker response times without requiring customer involvement through phone calls.

Location awareness p. p. 192
Location awareness Active monitoring of "behind the meter" assets

AI summary The text discusses the importance of actively monitoring 'behind the meter' assets, highlighting the need for awareness of their locations and performance.

2026-2027 GRA OP-12 Attachment 1 Page 388 of 684 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 15-17
2026-2027 GRA OP-12 Attachment 1 Page 388 of 684 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Vast majority of transmission system is steel or concrete Over half of the distribution system is underground Adding +100 miles per year of underg...

AI summary The document discusses the composition and expansion of Nova Scotia's transmission and distribution systems, highlighting the majority steel and concrete transmission infrastructure, over half underground distribution, plans to add over 100 miles of underground distribution annually, and a goal to reduce average customer outages to under 30 minutes by 2030.

$13.2B on Grid Reliability and Modernization $3.5B on Renewable Integration p. p. 37
$13.2B on Grid Reliability and Modernization $3.5B on Renewable Integration Transmission and distribution projects at TEC and NSPI Generation reliability projects at TEC and NSPI Gas infrastructure investment at PGS Solar investment at TEC...

AI summary The text outlines significant investments in grid reliability, modernization, and renewable integration, including transmission and distribution projects, generation reliability, gas infrastructure, solar, battery storage, and renewable natural gas initiatives across various entities.

2026-2027 GRA OP-12 Attachment 1 Page 417 of 684 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 45-46
2026-2027 GRA OP-12 Attachment 1 Page 417 of 684 REDACTED (CONFIDENTIAL INFORMATION REMOVED) In millions of CAD RELIABILITY & GRID MODERNIZATION PROJECTS Electric Grid Modernization at Tampa Electric $4,500 Distribution Expansion at PGS 1,...

AI summary The document outlines various projects and investments across reliability and grid modernization, renewable energy integration, technological innovation, and other initiatives, totaling approximately CAD 20.43 million. Key projects include grid modernization, distribution expansion, renewable energy investments, and technological upgrades.

Transmission and Distribution p. pp. 82-83
Transmission and Distribution Customers ~490,000 - 24,300 km of main lines - 13,500 km of service lines

AI summary The Transmission and Distribution section provides an overview of the utility's infrastructure, including the number of customers and the total length of main and service lines, supported by visual aids from pages 82 and 83.

Capital Project Details p. pp. 61-109
Capital Project Details In millions of CAD RELIABILITY & GRID MODERNIZATION PROJECTS Electric Grid Modernization at Tampa Electric $4,500 Distribution Expansion at PGS 1,780 Generation Expansion and Efficiency at Tampa Electric 1,740 T&D I...

AI summary The document outlines capital project details, including reliability and grid modernization projects, renewable energy integration, technological innovation, and other initiatives, with total investments amounting to approximately $20.43 million.

N-172026-2027 GRA SR-01-SR-04 - Redacted 1 passage
Unmetered Service Rates: Miscellaneous Lighting & Small Loads
shy Hill Bus 0.62 0.62 LINES: Lingan - Victoria Junction 0.97 2.22 3.19 Upgrade 230 kV Lingan to Port Hastings 0.22 0.22 ROW Lingan - Victoria Junction 0.66 0.66 Onslow - Port Hastings 4.64 4.64 ROW Trenton - Port Hastings 0.89 0.89 Upgrad...

AI summary The text outlines various line and ROW (Right of Way) projects with associated costs, including upgrades to 230 kV lines and other infrastructure improvements across different locations in Nova Scotia.

N-20NSPI (Bates White) RIR 1-20 - Redacted 2 passages
7 p. p. 96
7 Modeled Peak (MW) Res Heat (MW) EV (MW) DR (MW) Hybrid (MW) C&I Elect. (MW) Large Cust. (MW) DSM (MW) Firm Peak (MW) Inter. Cust. (MW) System Peak (MW) 2025 2,180 2 3 -4 - 0 96 -11 2267 132 2,403 2035 2,455 17 121 -37 -48 4 105 -114 2502...

AI summary The table provides modeled peak demand forecasts for various load categories in 2025 and 2035, including residential heating, electric vehicles, demand response, and others, with values in megawatts (MW). It also includes a scenario for 2035 with maximum non-coincident EV peak demand.

Table A2: Coincident Peak Demand - 2025 NS Power Forecast Peak Forecast p. pp. 108-112
Table A2: Coincident Peak Demand - 2025 NS Power Forecast Peak Forecast Year Interruptible Contribution to Peak Demand Response (reduction in Firm Contribution to Peak Net System Peak Growth Temp at Peak 12hr Lag Temp Notes (MW) Firm Peak...

AI summary Table A2 presents the forecasted coincident peak demand for NS Power from 2015 to 2035, including contributions from interruptible and firm demand, net system peak, growth rates, and temperature data. The forecast shows increasing trends in peak demand and temperature, with notes on specific dates and conditions for each year.

N-23NSPI (Doane Grant Thornton) RIR 1-93 - Redacted 1 passage
20 p. p. 43
20 ($ millions) 2024 Actual 2025 Budget 2026 GRA Forecast 2027 GRA Forecast Distribution 174.9 179.5 190.1 195.9 Transmission 75.6 100.5 214.5 204.2 East Coast Energy Initiative (ECEI) 29.2 143.3 39.4 (3.3) Total 279.7 423.3 444.0 396.8 21

AI summary The table outlines projected and actual expenditures for various energy sectors in Nova Scotia, including distribution, transmission, and the East Coast Energy Initiative, with figures for 2024, 2025, 2026, and 2027.

N-24NSPI (ECC) RIR 1-41 17 passages
ORIGINAL LIFE TABLE, CONT. p. p. 180
ORIGINAL LIFE TABLE, CONT. AVG AGE RET 33.1 PLACEMENT BAND 1920-2023 002 EXPERIENCE BAND 1980-2023 EXPERIENCE ANALYSIS AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTE...

AI summary The text presents a continuation of an original life table, including data on average age at retirement, exposure, retirements, and survival percentages across various age intervals. It also references an attachment from the 2026-2027 GRA Emrydia IR-2 document.

ACCOUNT 362.20 REMOTE MONITORING EQUIPMENT p. p. 180
ACCOUNT 362.20 REMOTE MONITORING EQUIPMENT AVG AGE RET 0.0 PLACEMENT BAND 2003-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 2009-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RAT...

AI summary The text provides a table with data on the experience analysis of remote monitoring equipment, including age intervals, exposures, retirements, and survival rates. It also includes a reference to a document titled '2026-2027 GRA Emrydia IR-2 Attachment 1 Page 173 of 348'.

ACCOUNT 365.00 OVERHEAD CONDUCTORS AND DEVICES p. p. 180
ACCOUNT 365.00 OVERHEAD CONDUCTORS AND DEVICES PLACEMENT BAND 1950-2023 004 EXPERIENCE BAND 2014-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR CURVE RESID MEAS RANGE OF FIT 41.5-S0 40.4-S0.5 39.5-S1 39.0-S1.5 38.5-S2 38.3-S2.5 7.81...

AI summary The document presents statistical data related to overhead conductors and devices, including survivor curves and measurements across different placement and experience bands from 1950 to 2023. It includes detailed metrics and ranges of fit for various categories.

ACCOUNT 365.00 OVERHEAD CONDUCTORS AND DEVICES p. p. 180
ACCOUNT 365.00 OVERHEAD CONDUCTORS AND DEVICES AVG AGE RET 34.2 PLACEMENT BAND 1955-2023 005 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETM...

AI summary The text presents a table analyzing the experience and retirement rates of overhead conductors and devices, with data spanning from 1955 to 2023. It includes metrics such as exposure at the beginning of each age interval, retirements during the interval, and survival ratios. The data is part of a broader analysis for the 2026-2027 GRA Emrydia IR-2 attachment.

ACCOUNT 368.00 LINE TRANSFORMERS p. p. 180
ACCOUNT 368.00 LINE TRANSFORMERS PLACEMENT BAND 1962-2023 003 EXPERIENCE BAND 2014-2023 SURVIVOR RESID RANGE OF SURVIVOR RESID RANGE OF CURVE MEAS FIT CURVE MEAS FIT 35.2-S0 2.42 0 - 48 35.4-S0 2.99 17 - 48 34.5-S0.5 2.01 0 - 48 35.1-S0.5...

AI summary The document presents data for Account 368.00 Line Transformers, showing survival curves and measurements across different placement and experience bands from 1962 to 2023. The data includes ranges and fit measurements for various transformer models.

ACCOUNT 370.00 METERS p. p. 180
ACCOUNT 370.00 METERS AVG AGE RET 18.3 PLACEMENT BAND 1925-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1942-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SU...

AI summary This table presents experience analysis data for meters, including average age, exposure at the beginning of age intervals, retirements during intervals, and survival ratios. It details the number of meters retired over time and the percentage of meters surviving at the start of each interval.

ACCOUNT 370.00 METERS p. p. 180
ACCOUNT 370.00 METERS PLACEMENT BAND 1925-2023 001 EXPERIENCE BAND 1942-2023 SURVIVOR RESID RANGE OF SURVIVOR RESID RANGE OF CURVE MEAS FIT CURVE MEAS FIT 18.3-S0 3.56 0 - 42 17.9-S0 4.28 6 - 30 18.3-S0.5 5.45 0 - 42 17.9-S0.5 6.77 6 - 30...

AI summary The text presents data from Account 370.00, which includes survival curves and measurements for different meter placement and experience bands, with ranges of values and fit percentages. This data is likely used for statistical analysis or planning related to meter performance and reliability.

ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS p. p. 180
ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS AVG AGE RET 21.3 PLACEMENT BAND 1925-2022 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1942-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL R...

AI summary The document presents a detailed experience analysis table for street lighting and signal systems, showing exposure, retirements, and survival rates across different age intervals. This data is relevant for understanding the aging and replacement needs of infrastructure in Nova Scotia.

ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS p. p. 180
ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS PLACEMENT BAND 1925-2022 001 EXPERIENCE BAND 1942-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR CURVE RESID MEAS RANGE OF FIT 22.1-S0 22.1-S0.5 22.1-S1 22.1-S1.5 22.1-S2 22.1-S2.5 22...

AI summary The text presents statistical data related to street lighting and signal systems, including survivor curves, residuals, and ranges of fit for various placement and experience bands. The data appears to be part of a technical analysis or evaluation process.

ORIGINAL LIFE TABLE, CONT. p. pp. 105-180
ORIGINAL LIFE TABLE, CONT. AVG AGE RET 22.2 002 EXPERIENCE ANALYSIS PLACEMENT BAND 1962-2022 EXPERIENCE BAND 2004-2023 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTE...

AI summary The document presents an original life table continuation with data on average age at retirement, exposures, retirements, and survival percentages across various age intervals from 1962 to 2022. The table includes statistics such as retirement ratios and survival ratios for different age groups.

ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS p. p. 180
ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS PLACEMENT BAND 1997-2022 005 EXPERIENCE BAND 2020-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR RESID RANGE OF CURVE MEAS FIT 46.9-S0 40.7-S0.5 35.8-S1 32.8-S1.5 0.83 0 - 26 0.44 0 -...

AI summary The text presents statistical data related to survivor curves for street lighting and signal systems, categorized under different placement and experience bands. The data includes measurements and ranges, with some segments not fitted for analysis.

ACCOUNT 373.10 STREET LIGHTING AND SIGNAL SYSTEMS - LED p. p. 180
ACCOUNT 373.10 STREET LIGHTING AND SIGNAL SYSTEMS - LED AVG AGE RET 6.3 001 EXPERIENCE ANALYSIS PLACEMENT BAND 2012-2023 EXPERIENCE BAND 2012-2023 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN O...

AI summary This table provides an experience analysis for street lighting and signal systems in Account 373.10, covering exposure and retirement data for LED systems from 2012 to 2023. It includes survival percentages and retirement ratios across different age intervals.

TABLE 1. RETIREMENTS FOR EACH YEAR 2000-2009 SUMMARIZED BY AGE INTERVAL p. p. 47
TABLE 1. RETIREMENTS FOR EACH YEAR 2000-2009 SUMMARIZED BY AGE INTERVAL 995-2009 Age Interval 3) (1 ½ 4 ½-1 3 1 ½ 3 ½-1 2 1 ½ 2 ½-1 11 ½ ½-11 0 1 ½ 0 ½-1 9 ½ ½-9 8 ½ ½-8 7 ½ ½-7 6 ½ ½-6 5 ½ ½-5 4 ½ ½-4 3 ½ ½-3 2 ½ ½-2 1 ½ ½-1 ½ 0- ment Ban...

AI summary The table summarizes retirements from 2000 to 2009, categorized by age intervals. It includes data on retirements during each year, with values presented in thousands of dollars and age intervals spanning various ranges.

Preamble p. p. 47
Column 3 from Table 1, Column 12, Retirements for Each Year. Column 4 = Column 3 divided by Column 2. Column 5 = 1.0000 minus Column 4. Column 6 = Column 5 multiplied by Column 6 as of the Preceding Age Interval. interval by the exposures...

AI summary The text describes a method for calculating percent surviving at different age intervals based on retirement rates, using survivor ratios and exposures. It also discusses the smoothing of original survivor curves using Iowa type curves (L, S, R) to eliminate irregularities and better fit the data for extrapolation purposes.

CALCULATION DATE.. 12-31-2009 SURVIVOR CURVE.... 25-S2 p. p. 61
CALCULATION DATE.. 12-31-2009 SURVIVOR CURVE.... 25-S2 BEG (1) AGE INTERVAL END (2) LIFE (3) RETIREMENTS DURING INTERVAL (4) GROUP ANNUAL ACCRUAL (5)=(4)/(3) YEAR INST (6) SUMMATION OF ANNUAL ACCRUALS (7) AVERAGE PERCENT SURVIVING FACTOR F...

AI summary The text presents a survivor curve calculation dated December 31, 2009, which includes intervals of age, life expectancy, retirements, annual accruals, and survival factors. This appears to be related to actuarial or statistical modeling, likely for planning or forecasting purposes.

ORIGINAL LIFE TABLE p. pp. 96-147
ORIGINAL LIFE TABLE PLACEMENT BAND 1973-2009 EXPERIENCE BAND 1973-2009 AGE AT EXPOSURES AT BEGIN OF BEGINNING OF INTERVAL AGE INTERVAL RETIREMENTS DURING AGE RETMT INTERVAL RATIO SURV PCT SURV BEGIN OF RATIO INTERVAL 0.0 0.5 1.5 2.5 3.5 4....

AI summary The document presents an original life table with data on exposures, retirements, survival ratios, and percentages of survival across different age intervals from 1973 to 2009. It includes detailed statistical breakdowns for various placement and experience bands.

ORIGINAL LIFE TABLE, CONT. p. pp. 98-116
ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1925-2009 EXPERIENCE BAND 1942-2009 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTERVAL RATIO RATIO INTERVAL 39.5 1,292,476...

AI summary The document presents a continuation of an original life table, showing exposure and retirement data across different age intervals from 1925 to 2009. It includes statistical ratios and survival percentages for each interval, which are likely used for actuarial or demographic analysis.

N-27NSPI (NSEB) RIR 1-152 - Redacted (settlement agreement attached at IR-1) 8 passages
GRA Element Settlement Terms p. p. 17
Appendix "A" GRA Element Settlement Terms 357.00 358.00 359.00 UNDERGROUND CONDUIT UNDERGROUND CONDUCTORS AND DEVICES ROADS, TRAILS AND BRIDGES 65 - S3 45 - S3 60 - S3 0 (10) 0 1,736,139 7,345,546 344,183 611,263 853,459 110,123 1,124,876...

AI summary The document provides a detailed breakdown of settlement terms for various infrastructure elements including underground conduit, transmission plant, distribution plant, and station equipment, with associated costs, revenues, and percentages. This data is presented in a tabular format for clarity and reference.

17 p. pp. 9-12
17 18 Figure 9: 2025 Recloser Installations Region Feeder Communities Impacted Northeast 24C-442 Canso and surrounding area Northeast 50N-410 Merigomish and surrounding area Cape Breton 22C-404 Isle Madam Cape Breton 81S-303 Glace Bay, Por...

AI summary Figure 9 lists the 2025 recloser installations across various regions in Nova Scotia, including the specific feeders and communities impacted by these installations.

12 Figure 13: Remote Terminal Units Proposed for 2025 p. p. 16
12 Figure 13: Remote Terminal Units Proposed for 2025 RTU Region Area / Community Substation Cape Breton Port Hastings 2C Cape Breton Southwest Margaree 58C Cape Breton Cleveland 22C Northeast Tatamagouche 4N West Hebron 16W West Bridgewat...

AI summary The document outlines the proposed remote terminal units (RTUs) for 2025, including their locations and associated substation identifiers. It also references a section on downline connectivity, indicating a focus on infrastructure planning and grid modernization.

11 p. p. 24
11 NSR (GWh) System Peak (MW) Year GRA Load 2025 Load Change GRA Load 2025 Load Change Forecast Forecast (%) Forecast Forecast (%) 2026F 11,378 11,403 0.2 2,418 2,408 -0.4 2027F 11,289 11,193 -0.9 2,429 2,423 -0.2 12

AI summary The text provides a table comparing forecasted NSR (GWh) and system peak (MW) values for 2026 and 2027 under GRA (Grid Reliability Assessment) and 2025 load forecasts, indicating minimal changes in both energy consumption and peak demand.

6 Corrected Values p. pp. 24-40
6 Corrected Values Year 2024 Forecast Load (GWh) GRA Forecast Load, Corrected Figure 4-1 (GWh) Variance (GWh) Year Over Year Change (GRA Forecast, percent) Unsmoothed BCF 849.3 841.4 OR-01 Att 1 2026 smoothed and 2027 std tabs cell W348 AT...

AI summary The document provides a table comparing 2024 load forecasts with corrected GRA forecasts, highlighting variances and references to specific attachments and tabs for detailed data. It includes entries for Unsmoothed BCF, ATL PHP BCF, and Total BCF unsmoothed, with references to OR-01 and specific cells for further information.

22 (b) Please see the table below: p. p. 87
22 (b) Please see the table below: ($ million) 2020 2021 2022 2023 2024 2020-2024 Average 23 (a) The incremental labour supports the maintenance and enhancement of the expanding 24 portfolio of digital solutions such as Green Button, Provi...

AI summary The text discusses NS Power's initiatives to enhance digital solutions, customer programs, and communication efforts. It also references a filing (M11884) outlining the CIS Replacement project, which includes enhancements for future customer offerings and tariff designs.

Preamble p. p. 87
i. NS Power Standards engineers participate in the CSA technical committee for Overhead Systems (C22.3 No. 1). Since 2016, climate scientists with the CSA have collected weather data across Canada and built models for projecting changes to...

AI summary NS Power Standards engineers are involved in the CSA technical committee for Overhead Systems (C22.3 No. 1). Climate scientists from the CSA have modeled future weather changes, including wind speed projections based on global warming scenarios, which are used in wood pole models for overhead systems in Nova Scotia.

CI # Project Name Remaining NBV Jan. 1, 2026 p. p. 56
CI # Project Name Remaining NBV Jan. 1, 2026 45066-T802 Upgrade L6511 and L7019 (T802) $2,071,215 43678-T800 Separate L8004/L7005 (T800) $16,686,562 45067-T801 67N Onslow 345 KV Node Swap (T801) $2,472,071 43324-T782 L6513 Rebuild/upgrade...

AI summary The document presents a table listing several projects with their corresponding CI numbers, project names, and remaining NBV as of January 1, 2026. The total remaining NBV for all projects is reported as $34,782,895.

N-30NSPI (Renewall) RIR 1 to 13 1 passage
1 Request IR-1: p. p. 14
NON-CONFIDENTIAL 1 Request IR-1: 9 (b) If not, why was this issue not raised in advance with REI? 10 11 (c) The evidence states that: 12 13 14 15 16 17 18 "NS Power has reviewed and updated charges for the distribution and retail services...

AI summary The text outlines a regulatory inquiry regarding NS Power's proposed changes to distribution and retail service charges under the Distribution Tariff (DT) and Distribution Tariff Rates (DTR), including questions about the scope of the DT for transmission-connected customers and the cost breakdown for retail services.

N-31NSPI (ECC) IR 1 to 41 - REFILED 22 passages
SUMMARY OF CURVE FITTING RESULTS - PCT SURV BALANCED AREAS p. p. 81
SUMMARY OF CURVE FITTING RESULTS - PCT SURV BALANCED AREAS PLACEMENT BAND 1952-2023 001 EXPERIENCE BAND 1952-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR CURVE RESID MEAS RANGE OF FIT 59.4-S0 54.9-S0.5 51.5-S1 49.1-S1.5 1.84 0 - 51...

AI summary This table presents curve fitting results for survivor curves in two bands, showing different placements and experience ranges, along with residuals and fit measurements. It includes data on survival percentages and fitting metrics, indicating some segments were not fitted.

ORIGINAL LIFE TABLE, CONT. p. pp. 6-81
ORIGINAL LIFE TABLE, CONT. AVG AGE RET 23.6 005 PLACEMENT BAND 1957-2023 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTE...

AI summary The document presents an original life table continuation with data on average age at retirement, exposures, retirements, and survival percentages across various age intervals from 1957 to 2023, highlighting experience analysis from 2020 to 2023.

ORIGINAL LIFE TABLE, CONT. p. p. 81
ORIGINAL LIFE TABLE, CONT. AVG AGE RET 33.1 PLACEMENT BAND 1920-2023 002 EXPERIENCE ANALYSIS EXPERIENCE BAND 1980-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO P...

AI summary The text presents a continuation of the original life table, showing data on average age, exposures, retirements, and survival rates across different age intervals. This data is used for experience analysis from 1980 to 2023.

ACCOUNT 340.96 SOLAR - SMARTGRID p. p. 81
ACCOUNT 340.96 SOLAR - SMARTGRID AVG AGE RET 0.0 001 EXPERIENCE ANALYSIS PLACEMENT BAND 2021-2021 EXPERIENCE BAND 2021-2023 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL...

AI summary This document provides an experience analysis for Account 340.96 Solar - SmartGrid, including exposure data and survival percentages for different age intervals. It is part of the 2026-2027 GRA Emrydia IR-2 Attachment 1.

ACCOUNT 350.10 LAND RIGHTS - EASEMENTS p. p. 81
ACCOUNT 350.10 LAND RIGHTS - EASEMENTS AVG AGE RET 0.0 PLACEMENT BAND 1952-2023 005 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO S...

AI summary The text presents a table with data on land rights and easements, including exposure and survival rates across various age intervals. The data spans from 1952 to 2023 and includes details on retirements and survival ratios, all of which remain at 100%.

ORIGINAL LIFE TABLE, CONT. p. p. 81
ORIGINAL LIFE TABLE, CONT. AVG AGE RET 24.4 PLACEMENT BAND 1964-2023 005 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTE...

AI summary The document presents an original life table continuation with data on average age at retirement, exposures, retirements, and survival rates across various age intervals from 1964 to 2023. It includes detailed statistical analysis of experience bands from 2020 to 2023.

ACCOUNT 356.00 OVERHEAD CONDUCTORS AND DEVICES p. p. 81
ACCOUNT 356.00 OVERHEAD CONDUCTORS AND DEVICES AVG AGE RET 30.2 PLACEMENT BAND 1929-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1942-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETM...

AI summary The document presents a table with data on the average age, retirements, and survival rates for overhead conductors and devices, spanning from 1929 to 2023. It includes exposure numbers, retirement ratios, and survival percentages across various age intervals.

ACCOUNT 358.00 UNDERGROUND CONDUCTORS AND DEVICES p. p. 81
ACCOUNT 358.00 UNDERGROUND CONDUCTORS AND DEVICES AVG AGE RET 21.7 PLACEMENT BAND 1995-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1998-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL R...

AI summary This section presents an experience analysis table for underground conductors and devices, detailing exposure data, retirements, survival ratios, and percentages across different age intervals, with the average age of retirement being 21.7 years and placements ranging from 1995 to 2023.

ACCOUNT 360.10 LAND RIGHTS - EASEMENTS, SURVEYS & CLEARING p. p. 81
ACCOUNT 360.10 LAND RIGHTS - EASEMENTS, SURVEYS & CLEARING AVG AGE RET 35.7 PLACEMENT BAND 1934-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1975-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE I...

AI summary The document presents a table analyzing experience bands and retirement data, including age intervals, exposures, retirements, and survival ratios. It appears to be part of a larger report or analysis related to land rights, easements, surveys, and clearing.

ACCOUNT 360.10 LAND RIGHTS - EASEMENTS, SURVEYS & CLEARING p. p. 81
ACCOUNT 360.10 LAND RIGHTS - EASEMENTS, SURVEYS & CLEARING AVG AGE RET 0.0 PLACEMENT BAND 1952-2023 005 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 PCT SURV AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURI...

AI summary The text presents a table of experience analysis data related to land rights, easements, surveys, and clearing, including exposure and retirement statistics. The data spans multiple age intervals, with no retirements or changes in survival ratios recorded.

ORIGINAL LIFE TABLE p. p. 81
ORIGINAL LIFE TABLE AVG AGE RET 9.7 PLACEMENT BAND 1995-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 2014-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV...

AI summary The text presents an original life table with data on average age, exposure, retirements, and survival ratios across different age intervals. It includes detailed statistics for various time periods and intervals, highlighting trends in retirements and survival rates.

ACCOUNT 364.00 POLES, TOWERS AND FIXTURES p. p. 81
ACCOUNT 364.00 POLES, TOWERS AND FIXTURES PLACEMENT BAND 1946-2023 002 EXPERIENCE BAND 2004-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR CURVE RESID MEAS RANGE OF FIT 48.0-S0 5.62 0 - 54 46.3-S0 6.55 26 - 54 46.0-S0.5 3.75 0 - 54 4...

AI summary The text presents detailed statistical data in a table format under Account 364.00, focusing on poles, towers, and fixtures. It includes survivor curves, residuals, and range of fit measurements for different placement and experience bands from 1946 to 2023.

ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS p. p. 81
ACCOUNT 373.00 STREET LIGHTING AND SIGNAL SYSTEMS PLACEMENT BAND 1997-2022 005 EXPERIENCE BAND 2020-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR RESID RANGE OF CURVE MEAS FIT 46.9-S0 40.7-S0.5 35.8-S1 32.8-S1.5 0.83 0 - 26 0.44 0 -...

AI summary This table presents data for Account 373.00, focusing on street lighting and signal systems. It includes survivor curves, placement bands, and experience bands with various measurements and fitting statuses, indicating that some data points are not fitted.

Preamble p. pp. 81-148
NOVA SCOTIA POWER, INC. ACCOUNT 389.10 LAND RIGHTS - GENERAL PLANT SUMMARY OF CURVE FITTING RESULTS - PCT SURV BALANCED AREAS PLACEMENT BAND 1995-2023 005 EXPERIENCE BAND 2020-2023 SURVIVOR RESID RANGE OF SURVIVOR RESID RANGE OF CURVE MEAS...

AI summary The text presents a summary of curve fitting results for the Placement Band 1995-2023 and Experience Band 2020-2023 under Account 389.10 Land Rights - General Plant, including survivor residuals and curve measurement fit details for the PCT SURV Balanced Areas.

ACCOUNT 390.10 STRUCTURES AND IMPROVEMENTS p. p. 81
ACCOUNT 390.10 STRUCTURES AND IMPROVEMENTS AVG AGE RET 23.1 PLACEMENT BAND 1964-2023 005 EXPERIENCE ANALYSIS EXPERIENCE BAND 2020-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RA...

AI summary The document presents a table analyzing retirement and survival rates for structures and improvements over different age intervals, with data ranging from 0.0 to 38.5 years. The table includes exposure numbers, retirements, and survival ratios, indicating the aging and retirement patterns of infrastructure.

ACCOUNT 397.10 COMMUNICATION EQUIPMENT - SCADA EQUIPMENT p. p. 81
ACCOUNT 397.10 COMMUNICATION EQUIPMENT - SCADA EQUIPMENT PLACEMENT BAND 1979-2023 001 EXPERIENCE BAND 1989-2023 SURVIVOR CURVE RESID RANGE OF MEAS FIT SURVIVOR CURVE RESID MEAS RANGE OF FIT 26.4-S0 25.9-S0.5 25.4-S1 25.2-S1.5 4.52 6.70 9.0...

AI summary The document presents data on SCADA equipment performance, including survivor curves, residuals, and ranges of fit for different placement and experience bands from 1979 to 2023. The data is organized in tables and includes statistical measures related to equipment reliability and performance.

TABLE 1. RETIREMENTS FOR EACH YEAR 2000-2009 SUMMARIZED BY AGE INTERVAL p. p. 148
TABLE 1. RETIREMENTS FOR EACH YEAR 2000-2009 SUMMARIZED BY AGE INTERVAL 995-2009 Age Interval 3) (1 ½ 4 ½-1 3 1 ½ 3 ½-1 2 1 ½ 2 ½-1 11 ½ ½-11 0 1 ½ 0 ½-1 9 ½ ½-9 8 ½ ½-8 7 ½ ½-7 6 ½ ½-6 5 ½ ½-5 4 ½ ½-4 3 ½ ½-3 2 ½ ½-2 1 ½ ½-1 ½ 0- ment Ban...

AI summary The table summarizes retirements from 2000 to 2009, categorized by age intervals, providing data on the number and cost of retirements over time.

CALCULATION DATE.. 12-31-2009 SURVIVOR CURVE.... 25-S2 p. p. 162
CALCULATION DATE.. 12-31-2009 SURVIVOR CURVE.... 25-S2 BEG (1) AGE INTERVAL END (2) LIFE (3) RETIREMENTS DURING INTERVAL (4) GROUP ANNUAL ACCRUAL (5)=(4)/(3) YEAR INST (6) SUMMATION OF ANNUAL ACCRUALS (7) AVERAGE PERCENT SURVIVING FACTOR F...

AI summary The text presents a survivor curve table with data points from 12.000 to 23.500, including life expectancy, retirements, annual accruals, and survival factors. The table includes calculations and percentages for different age intervals, with years ranging from 1986 to 1997.

ORIGINAL LIFE TABLE, CONT. p. pp. 14-17
ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1929-2009 EXPERIENCE BAND 1942-2009 AGE AT EXPOSURES AT BEGIN OF BEGINNING OF INTERVAL AGE INTERVAL RETIREMENTS DURING AGE RETMT INTERVAL RATIO SURV PCT SURV BEGIN OF RATIO INTERVAL 39.5 40.5 41.5...

AI summary The text presents a continuation of an original life table, detailing exposure numbers, retirements, survival ratios, and survival percentages across different age intervals from 1929 to 2009. The table provides statistical insights into survival rates and retirement data for various age groups.

ORIGINAL LIFE TABLE p. pp. 46-48
ORIGINAL LIFE TABLE PLACEMENT BAND 1933-2009 EXPERIENCE BAND 1945-2009 AGE AT EXPOSURES AT BEGIN OF BEGINNING OF INTERVAL AGE INTERVAL RETIREMENTS DURING AGE RETMT INTERVAL RATIO SURV PCT SURV BEGIN OF RATIO INTERVAL 0.0 0.5 1.5 2.5 3.5 4....

AI summary The document presents an original life table with data on exposures, retirements, survival rates, and percentages of survival across different age intervals from 1933-2009. The table includes detailed statistics for various age bands and experience bands, showing trends in retirements and survival rates over time.

SUMMARY OF BOOK SALVAGE p. p. 48
SUMMARY OF BOOK SALVAGE YEAR REGULAR RETIREMENTS COST OF REMOVAL AMOUNT PCT GROSS SALVAGE AMOUNT PCT NET SALVAGE AMOUNT PCT 1995 1996 473 473 1997 1998 1999 2000 2001 2002 191 305 0 0 305- 0 2003 2004 2005 2006 2007 2008 2009 40 40- TOTAL...

AI summary The document presents a summary of book salvage data, including regular retirements, cost of removal, gross salvage, and net salvage amounts over various years, with three-year and five-year moving averages provided for analysis.

ACCOUNT 350.1 LAND RIGHTS - EASEMENTS p. p. 48
1,411,461 27.38 51,551 2000 6,015,514.00 1,602,443 1,929,833 4,386,457 27.95 156,939 2001 5,594,833.00 1,343,515 1,618,005 4,256,570 28.67 148,468 2002 3,834,090.00 821,262 989,052 3,036,743 29.26 103,785 2003 5,330,421.00 1,000,733 1,205,...

AI summary The text presents a table with numerical data related to land rights and easements, including original costs, accrued amounts, calculated reserves, and annual accruals across various years from 2000 to 2004. The data appears to track financial information associated with land rights over time.

N-34Evidence - Dustin Madsen 1 passage
Figure 22 – Account 353.00 Gannett Fleming Recommended Placement and Experience Band p. pp. 75-77
Figure 22 – Account 353.00 Gannett Fleming Recommended Placement and Experience Band PLACEMENT BAND 1925-2023 001 EXPERIENCE BAND 1942-2023 RESID RANGE OF MEAS FIT SURVIVOR RESID RANGE OF CURVE MEAS FIT 54.7-s0.5 50.6-s1 1.53 0 - 46 NOT FI...

AI summary The text presents two figures detailing recommended placement and experience bands for Account 353.00 by Gannett Fleming and Emrydia. The figures include numerical data on placement and experience bands, as well as residual measures of fit. The second figure highlights that the Iowa curves with the best mathematical fit were 50.0-S1.5 and 47.0-R2.5.

N-34-(iii)Exhibit DMM-3 - Calculated and Book AD - ALG and ELG 1 passage
Page 1 of 5 Exhibit DMM-3
Page 1 of 5 Exhibit DMM-3 DE PR EC IAB LE GR OU P BO OK RE SE RV E AS OF DE CE MB ER 31 , 20 23 CA LC UL AT ED AC CR UE D DE PR EC IAT ION AL G P RO CE DU RE DIF FE RE NC E AL G P RO CE DU RE CA LC UL AT ED AC CR UE D DE PR EC IAT ION EL G...

AI summary The document presents a table with financial data related to distribution planning and calculated accrued depreciation for the period ending December 31, 2023. It includes figures for different categories such as Street Lighting and Signal Systems - LED and Total Distribution Plan, with values for book reserves, calculated accrued depreciation, and differences in both general and electrical processes.

N-34-(v)Exhibit DMM-5 - Appendix AMi Depreciation Study Report 2024 - NB Power Distribution 2 passages
ACCOUNT 230.00 – DISTRIBUTION – OH SECONDARY WIRE/CONDUCTOR p. p. 20
ACCOUNT 230.00 – DISTRIBUTION – OH SECONDARY WIRE/CONDUCTOR Investment $ Investment % Previously Approved Curve Concentric Recommended Curve $61,892,545 4.51% 55-R1 60-R1 The investment in Distribution – OH Secondary Wire/Conductor is appr...

AI summary The document discusses the investment in Distribution – OH Secondary Wire/Conductor, amounting to approximately $62 million, which constitutes 4.5% of the total Distribution functional group. It highlights the similarity of these assets to those in the OH Primary Wire/Conductor Account and notes that retirements of $8.29 million were recorded from 1982 to 2024 using the retirement rate method, without the use of a T-Cut.

ACCOUNT 300.00 – DISTRIBUTION - PROTECTIVE EQUIPMENT p. p. 22
ACCOUNT 300.00 – DISTRIBUTION - PROTECTIVE EQUIPMENT Investment $ Investment % Previously Approved Curve Concentric Recommended Curve $76,623,229 5.59% 38-R2 40-R2.5 The investment in Distribution – Protective Equipment is approximately $7...

AI summary The document outlines an investment of approximately $77 million in Distribution – Protective Equipment, which constitutes 5.59% of the total Distribution functional group. The investment includes physical protection measures and inspection costs, with retirements analyzed using a T-Cut at age 44, resulting in $12.48 million in recorded retirements.

N-34-(vii)Exhibit DMM-7 - 2020 Depreciation Study Filed July 29, 2021 6 passages
Preamble p. pp. 23-28
For the entire experience band 2011-2020, the total exposures at the beginning of an age interval are obtained by summing diagonally in a manner similar to the summing of the retirements during an age interval (Schedule 1). For example, th...

AI summary The text explains how total exposures at the beginning of an age interval are calculated by summing diagonally, using an example of the total exposures at the beginning of age interval 4½-5½, which is calculated by summing a series of numbers.

TABLE 3. CALCULATION OF TOTAL ANNUAL DEPRECIATION INCLUDING AMORTIZATIONS OF THE RESERVE VARIANCE RELATED TO ELECTRIC PLANT AS OF DECEMBER 31, 2020 p. p. 62
TABLE 3. CALCULATION OF TOTAL ANNUAL DEPRECIATION INCLUDING AMORTIZATIONS OF THE RESERVE VARIANCE RELATED TO ELECTRIC PLANT AS OF DECEMBER 31, 2020 DEPRECIABLE GROUP AS OF 12/31/2020 ORIGINAL COST ACCRUAL AMOUNT ANNUAL AMORTIZATION VARIANC...

AI summary The table details the calculation of total annual depreciation and amortizations of the reserve variance related to electric plant as of December 31, 2020, across various depreciable groups such as distribution plant, general plant, and specific assets like rights of way, substation equipment, and communication equipment.

ORIGINAL LIFE TABLE p. pp. 63-123
ORIGINAL LIFE TABLE PLACEMENT BAND 1960-2020 EXPERIENCE BAND 1993-2020 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF INTERVAL 0.0 0.5 1.5 2.5 3.5 4....

AI summary The document presents an original life table with data on exposures, retirements, and survival ratios across different age intervals from 1960 to 2020. The table includes metrics such as retirement ratios, survival ratios, and percentages of survival at the beginning of each interval, providing a statistical overview of retirement patterns over time.

ORIGINAL LIFE TABLE, CONT. p. pp. 84-112
ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1950-2020 EXPERIENCE BAND 1959-2020 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF INTERVAL 39.5 40.5 41.5...

AI summary The document presents an original life table with data on exposures, retirements, and survival ratios for different age intervals. It also references an account related to towers and fixtures with a smooth survivor curve.

ORIGINAL LIFE TABLE, CONT. p. pp. 116-123
ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1956-2020 EXPERIENCE BAND 2004-2020 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTERVAL RATIO RATIO INTERVAL 39.5 37,642 13,...

AI summary The document presents a life table continuation, showing exposure, retirements, and survival rates for different age intervals, specifically for Maritime Electric Company's Account 370.2 meter installations. The data includes percentages of survival and retirement ratios for each interval.

ACCOUNT 368.2 LINE TRANSFORMER INSTALLATIONS p. p. 140
ACCOUNT 368.2 LINE TRANSFORMER INSTALLATIONS COST OF GROSS NET 08-10 87,705 21,767 25 0 21,767- 25- 09-11 64,360 39,388 61 0 39,388- 61- 10-12 108,222 46,765 43 0 46,765- 43- 11-13 93,266 35,285 38 0 35,285- 38- 12-14 109,569 20,591 19 0 2...

AI summary The document presents data on line transformer installations and retirements, including costs, salvage values, and percentages over various time periods, highlighting trends and figures for different years.

N-34-(viii)Exhibit DMM-8 - From NP - 2022-2023 General Rate Application - Volume 3 - 2021-05-27 20 passages
JANUARY 1 OF EACH YEAR 2010-2019 SCHEDULE 3. PLANT EXPOSED TO RETIREMENT SUMMARIZED BY AGE INTERVAL p. p. 25
JANUARY 1 OF EACH YEAR 2010-2019 SCHEDULE 3. PLANT EXPOSED TO RETIREMENT SUMMARIZED BY AGE INTERVAL Age Interval (13) ½ ½-14 13 ½ ½-13 12 ½ ½-12 11 ½ ½-11 10 ½ ½-10 9 ½ ½-9 8 ½ ½-8 7 ½ ½-7 6 ½ ½-6 5 ½ ½-5 4 ½ ½-4 3 ½ ½-3 2 ½ ½-2 1 ½ ½-1 ½...

AI summary The document presents a schedule summarizing plant exposure to retirement, categorized by age intervals from 2010 to 2019. It provides annual survivor data and total exposures in thousands of dollars for different age bands over the specified years.

(Exposure and Retirement Amounts are in Thousands of Dollars) p. pp. 29-30
(Exposure and Retirement Amounts are in Thousands of Dollars) Age at Beginning of Exposures at Beginning of Retirements During Age Retirement Survivor Percent Surviving at Beginning of Interval Age Interval Interval Ratio Ratio Age Interva...

AI summary The table presents exposure and retirement amounts over various age intervals, including exposures at the beginning of each interval, retirements during the interval, and survival ratios. The data shows a decline in exposure and survival rates as the age interval increases, with the final row highlighting the total exposure and retirements across all intervals.

Preamble p. p. 30
Column 2 from Schedule 3, Column 12, Plant Exposed to Retirement. Column 3 from Schedule 1, Column 12, Retirements for Each Year. Column 4 = Column 3 Divided by Column 2. Column 5 = 1.0000 Minus Column 4. Column 6 = Column 5 Multiplied by...

AI summary The text describes a calculation methodology involving columns from schedules related to plant retirements and survival curves. It outlines mathematical operations such as division, subtraction, and multiplication, and references survival curves derived from retirement rate studies.

ACCOUNT 321.00 - ROADS, TRAILS, AND BRIDGES p. pp. 84-88
ACCOUNT 321.00 - ROADS, TRAILS, AND BRIDGES PLACEMENT BAND 1924-2018 EXPERIENCE BAND 1948-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF INTERVA...

AI summary This document presents a table with data related to exposure, retirements, and survival rates across different age intervals, likely related to infrastructure or workforce planning for roads, trails, and bridges in Nova Scotia.

ORIGINAL LIFE TABLE, CONT. p. pp. 5-189
ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1904-2018 EXPERIENCE BAND 1948-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF INTERVAL 79.5 80.5 81.5...

AI summary The text presents a continuation of the original life table, detailing exposure, retirements, and survival rates across various age intervals. It also references Newfoundland Power Inc. and Account 323.00, which relates to infrastructure components such as canals, penstocks, surge tanks, and tailraces.

ACCOUNT 324.00 - DAMS AND RESERVOIRS p. pp. 97-100
ACCOUNT 324.00 - DAMS AND RESERVOIRS PLACEMENT BAND 1904-2018 EXPERIENCE BAND 1948-2018 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTERVAL RATIO RATIO INTERVAL 0.0 4...

AI summary The text presents a detailed table of exposure and retirement data for dams and reservoirs in Nova Scotia, spanning from 1904 to 2018, with various age intervals and survival rates.

ORIGINAL LIFE TABLE, CONT. p. pp. 100-166
ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1904-2018 EXPERIENCE BAND 1948-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF INTERVAL 79.5 80.5 81.5...

AI summary The text presents a continuation of the original life table, showing exposure, retirements, survival ratios, and percentage survival for different age intervals. It includes data related to placements and experience bands from 1904-2018 and 1948-2018, respectively. The table is associated with Newfoundland Power Inc. Account 325.00, which pertains to prime movers, generators, and auxiliaries.

ACCOUNTS 355.10 AND 355.20 - TRANSMISSION - POLES AND FIXTURES ORIGINAL LIFE TABLE, CONT. p. p. 149
ACCOUNTS 355.10 AND 355.20 - TRANSMISSION - POLES AND FIXTURES ORIGINAL LIFE TABLE, CONT. PLACEMENT BAND 1928-2018 EXPERIENCE BAND 1948-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RE...

AI summary The document presents tables related to the original life table for transmission poles and fixtures, including exposure, retirements, and survival ratios across different age intervals. It also references Account 355.30, which deals with transmission insulators and survivor curves.

ACCOUNT 361.12 - OVERHEAD CONDUCTORS - BARE ALUMINUM p. pp. 152-156
ACCOUNT 361.12 - OVERHEAD CONDUCTORS - BARE ALUMINUM PLACEMENT BAND 1938-2018 EXPERIENCE BAND 1952-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN O...

AI summary The document presents a detailed table of exposure and retirement data for overhead conductors (bare aluminum) over time, including exposure counts, retirements, and survival ratios. This data spans from 1938 to 2018 and provides insights into the aging and replacement patterns of these conductors.

ACCOUNT 362.30 - DISTRIBUTION - POLES (CONCRETE AND STEEL) p. pp. 171-172
ACCOUNT 362.30 - DISTRIBUTION - POLES (CONCRETE AND STEEL) PLACEMENT BAND 1955-2018 EXPERIENCE BAND 1965-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV B...

AI summary The text presents a table with data on the retirement and survival rates of distribution poles (concrete and steel) over time, showing exposure numbers, retirements, and survival ratios across different age intervals from 1955 to 2018.

ACCOUNT 363.00 - DISTRIBUTION - STREET LIGHTS p. pp. 53-176
ACCOUNT 363.00 - DISTRIBUTION - STREET LIGHTS PLACEMENT BAND 1944-2018 EXPERIENCE BAND 1949-2018 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE INTERVAL INTERVAL RATIO RATIO INTER...

AI summary The text presents a table detailing the exposure, retirements, and survival rates of street lights over different age intervals from 1944 to 2018. The data includes exposure counts, retirement numbers, and survival ratios for each interval, showing a steady decline in the number of street lights over time.

ACCOUNTS 364.10, 364.11, 364.2, 364.3 AND 364.4 - LINE TRANSFORMERS p. pp. 179-181
ACCOUNTS 364.10, 364.11, 364.2, 364.3 AND 364.4 - LINE TRANSFORMERS PLACEMENT BAND 1933-2013 EXPERIENCE BAND 1948-2005, 2007-2018 AGE AT EXPOSURES AT RETIREMENTS PCT SURV BEGIN OF BEGINNING OF DURING AGE RETMT SURV BEGIN OF INTERVAL AGE IN...

AI summary The document presents a table with data on line transformers, including exposure, retirements, and survival rates across different age intervals, spanning from 1933-2013 and 1948-2005, 2007-2018. The data shows the number of transformers, retirements, and survival percentages over time.

Section 257 p. p. 184
ACCOUNTS 365.10, 361.11 AND 361.15 - OVERHEAD SERVICES, WEATHER-PROOF COPPER CONDUCTORS, AND DUPLEX CONDUCTORS

AI summary The document references accounts 365.10, 361.11, and 361.15 related to overhead services, weather-proof copper conductors, and duplex conductors, indicating a focus on infrastructure and materials used in power distribution.

ACCOUNT 365.20 - DISTRIBUTION - SERVICES UNDERGROUND p. pp. 184-187
ACCOUNT 365.20 - DISTRIBUTION - SERVICES UNDERGROUND PLACEMENT BAND 1965-2018 EXPERIENCE BAND 1965-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN O...

AI summary The document presents a detailed table analyzing distribution services underground, including exposure data, retirements, and survival rates across various age intervals from 1965 to 2018. It provides insights into the aging infrastructure and retirement trends over time.

ACCOUNT 366.10 - DISTRIBUTION - WATT-HOUR METERS p. p. 189
ACCOUNT 366.10 - DISTRIBUTION - WATT-HOUR METERS PLACEMENT BAND 1966-2044 EXPERIENCE BAND 2008-2044 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF IN...

AI summary The document presents a detailed table outlining the retirement and survival rates of watt-hour meters across various age intervals from 1966 to 2044. It includes exposure numbers, retirements, retirement ratios, survival ratios, and survival percentages for each age band.

ACCOUNT 367.10 - DISTRIBUTION - UNDERGROUND DUCT AND MANHOLES p. p. 198
ACCOUNT 367.10 - DISTRIBUTION - UNDERGROUND DUCT AND MANHOLES PLACEMENT BAND 1947-2018 EXPERIENCE BAND 1959-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SUR...

AI summary The document presents data on the exposure and retirement rates of underground duct and manholes in Nova Scotia from 1947 to 2018, including survival ratios and percentages for different age intervals.

ORIGINAL LIFE TABLE p. pp. 1-15
ORIGINAL LIFE TABLE PLACEMENT BAND 1921-2018 EXPERIENCE BAND 1921-2018 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATIO SURV RATIO PCT SURV BEGIN OF INTERVAL 0.0 0.5 1.5 2.5 3.5 4....

AI summary The document presents an original life table with data on exposure, retirements, survival ratios, and percentages for different age intervals, followed by an account related to buildings and structures categorized as small.

ACCOUNT 365.00 - DISTRIBUTION - SERVICES p. p. 53
ACCOUNT 365.00 - DISTRIBUTION - SERVICES COST OF G R O S S S A L V A G E NET

AI summary The text presents a table titled 'ACCOUNT 365.00 - DISTRIBUTION - SERVICES' with columns related to cost, gross salvage, and net values, but no specific data or discussion is provided within the table.

SUBSTATIONS - ALL ACCOUNTS p. p. 93
279 10 33,952 9 6,255 2 95-97 363,731 61,889 17 43,578 12 0 18,311- 5- 96-98 441,567 64,933 15 9,867 2 5,753 1 49,314- 11- 97-99 672,266 127,998 19 10,733 2 5,753 1 111,512- 17- 98-00 681,988 165,681 24 12,952 2 5,753 1 146,976- 22- 99-01...

AI summary The text presents a table containing numerical data related to substation accounts, including figures for different years and categories. The data includes values for various years, such as 95-97, 96-98, and others, along with corresponding numbers and totals. The table appears to be related to financial or operational metrics for substation accounts.

ACCOUNT 364.00 - DISTRIBUTION - TRANSFORMERS p. pp. 104-105
ACCOUNT 364.00 - DISTRIBUTION - TRANSFORMERS REGULAR COST OF REMOVAL REUSE G R O S S S A L V A G E FINAL NET SALVAGE YEAR RETIREMENTS AMOUNT PCT AMOUNT PCT AMOUNT PCT AMOUNT PCT 2017 2,935,639 680,627 23 0 541,037 18 139,590- 5- 2018 2,068...

AI summary This table provides a detailed breakdown of transformer retirements, costs of removal, reuse, and salvage values from 2017 to 2011. It includes both annual and three-year moving average data, highlighting trends in transformer management and financial implications over time.

N-44STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY 2 passages
Section 510 p. pp. 200-202
y assumes that a similar load-carrying capacity adjustment was not applied to poles and conduits because those components do not physically deliver electricity. Conductors and line transformers cannot deliver electricity without poles and...

AI summary The Authority adjusts load-carrying capacity values for poles and conduits based on the minimum system study, recognizing that conductors and line transformers require these components to deliver electricity. The adjustment applies primary and secondary overhead conductor values to poles and underground values to conduits.

Table 100: UI 2023 and 2024 Workforce Gender, Hires and Promotions Data p. p. 249
Table 100: UI 2023 and 2024 Workforce Gender, Hires and Promotions Data Head count Hires Promotions Employee 2023 2024 2023 2024 2023 2024 Female 171 194 14 25 6 7 Male 448 493 59 41 14 13 Non-binary - 2 - - - - Undeclared - - - 1 - - Late...

AI summary Table 100 presents workforce gender, hires, and promotions data for UI in 2023 and 2024. It shows the number of female, male, non-binary, and undeclared employees, along with hires and promotions by gender. The data highlights a slight increase in female employees and hires, while male hires decreased slightly.

N-48Direct testimony of Jacob Pous 2 passages
3 p. p. 49
3 Account Company's Proposed Curve DUCI Recommended Curve Adjustment 353 – Transmission Station Equipment 42 R2.5 47 R2.5 $1,521,493 355 – Transmission Poles and Fixtures 47 R2 49 R2 $1,343,517 356 – Transmission Overhead Conductors and De...

AI summary The table presents proposed and recommended curves for various transmission and distribution accounts, along with the adjustments required for each. The total adjustment across all accounts is approximately $14.14 million.

UTILITY RATE PROCEEDINGS IN WHICH TESTIMONY HAS BEEN PRESENTED BY JACOB POUS p. p. 79
UTILITY RATE PROCEEDINGS IN WHICH TESTIMONY HAS BEEN PRESENTED BY JACOB POUS ALASKA 62 Poles and Fixtures $ 120,459,555 (40) $ (48,183,822) $ 36,000,908 $ 132,642,469 34.35 $ 3,861,498 3.21% 63 Overhead Conductors $ 90,836,531 (5) $ (4,541...

AI summary The text presents a table detailing various infrastructure costs and expenses related to utility rate proceedings, including poles, conductors, and distribution plant items. It includes figures for costs, depreciation, and percentages, highlighting financial aspects of infrastructure management.

N-59Response to Undertaking 12 - Revised with attachments 1 passage
9 EqualLifeGroup RL_Allocat 0 0 34.19535 0.00 365202041EqualLifeGroup p. p. 5
9 EqualLifeGroup RL_Allocat 0 0 34.19535 0.00 365202041EqualLifeGroup 2041 9 EqualLifeGroup RL_Allocat 0 0 18.25804 0.00 366002041EqualLifeGroup 2043 9 ASL_BG RL_Allocat 0 0 19.64249 9.53 380002043ASL_BG 2043 9 ASL_BG RL_Allocat 0 0 18.351...

AI summary The text presents a series of data entries related to 'RL_Allocat' under various matter numbers, including references to 'EqualLifeGroup' and 'ASL_BG'. These entries appear to be financial or regulatory allocations, likely involving distribution or resource planning.

N-62Hydro Quebec Climate Plan 2 passages
Adapt the management and design of heating, ventilation and air-conditioning systems to extreme heat conditions (cont'd) p. pp. 76-79
Adapt the management and design of heating, ventilation and air-conditioning systems to extreme heat conditions (cont'd) Action Implementation Progress Other action areas affected Increase the maximum allowable setpoint temperature in offi...

AI summary The document outlines actions to adapt heating, ventilation, and air-conditioning systems to extreme heat conditions, including increasing setpoint temperatures, raising awareness through posters, improving ventilation, and installing fans. It also mentions adapting rainwater drainage systems to high-intensity precipitation events.

- Hydro-Québec may have to maintain access roads that it does not own. p. pp. 98-100
- Hydro-Québec may have to maintain access roads that it does not own. Action Implementation Progress Other action areas affected Install cameras and sensors at certain telecommunications facilities to measure the quantity of freezing rain...

AI summary The text discusses Hydro-Québec potentially being responsible for maintaining access roads it does not own. It outlines various actions related to infrastructure maintenance, including installing sensors, updating records, and conducting climate resilience assessments.

N-64N-64.pdf 7 passages
1805 Land p. p. 45
1805 Land 1806 Land Rights 1808 Buildings and Fixtures 1810 Leasehold Improvements 1825 Storage Battery Equipment 6.5 Line Transformers

AI summary The text outlines various categories related to land and property, including land rights, buildings, leasehold improvements, and storage battery equipment. It also mentions a section on line transformers, indicating a focus on infrastructure and electrical systems.

The following outlines the resulting numbers of customers using the various asset groupings, for Example 1. p. p. 137
The following outlines the resulting numbers of customers using the various asset groupings, for Example 1. Class Bulk Primary Secondary Residential 1,000 1,000 1,000 General Service <50 kW 500 500 500 General Service >50 kW 100 100 50 Lar...

AI summary The text provides a table showing the number of customers using different asset groupings for Example 1, including residential, general service, and large use categories. Example 2 is mentioned but no details are provided.

Section 347 p. p. 137
The following is an example that assumes the distributor does not have bulk assets and includes the following customer characteristics for Residential, General Service < 50 kW, General Service > 50 kW and Large Use classifications:

AI summary The text provides an example scenario where a distributor does not have bulk assets and outlines customer classifications, including Residential, General Service < 50 kW, General Service > 50 kW, and Large Use.

The following outlines the resulting numbers of customers using the various asset groupings, for Example 2: p. p. 137
The following outlines the resulting numbers of customers using the various asset groupings, for Example 2: Class Bulk Primary Secondary Residential 1,000 1,000 General Service <50 kW 500 500 General Service >50 kW 100 50 Large Use 7 Examp...

AI summary The text provides a table showing the number of customers using different asset groupings for Example 2, including Residential, General Service <50 kW, General Service >50 kW, and Large Use, with varying numbers across Bulk, Primary, and Secondary classifications.

Section 353 p. p. 137
- c) Number of Residential customers taking power from the secondary assets through the primary assets only is 500. - d) Number of General Service < 50 kW customers taking power from the secondary assets through the primary and bulk assets...

AI summary The text provides a detailed breakdown of the number of customers in different categories based on their power sourcing methods, including residential, general service, and large use customers, and how they access power through primary, secondary, and bulk assets.

The following outlines the resulting numbers of customers using the various asset groupings, for Example 3: p. pp. 142-144
The following outlines the resulting numbers of customers using the various asset groupings, for Example 3: Class Bulk Primary Secondary 5095 Overhead Distribution Lines and Feeders - Rental Paid 5120 Maintenance of Poles, Towers and Fixtu...

AI summary The text presents a table detailing the distribution of customers across different asset groupings and density levels, referencing studies from Ontario. It includes percentages for line and transformer components under various density categories and utility-specific results.

Section 358 p. p. 144
The 10 largest utilities were excluded from these stratifications. Strata 1 - Utilities with less than 40% underground and less than 1000 residential customers

AI summary The text discusses the stratification of utilities, excluding the 10 largest ones. Strata 1 includes utilities with less than 40% underground infrastructure and fewer than 1000 residential customers.

N-67Response to Undertaking U-4 - Combined Redacted Only 35 passages
CLASSIFICATION OF RATE BASE
CLASSIFICATION OF RATE BASE (1) (2) (3) (4) INITIAL CLASSIFICATION DEMAND ENERGY CUSTOMER TOTAL RELATED RELATED RELATED COMPANY PLANT PLANT PLANT (1) RETAIL FUNCTION (2) (3) DISTRIBUTION PLANT: (4) SERVICES 0 0 0 0 (5) METERS 0 0 0 0 (6) T...

AI summary The document presents a classification of rate base components, including retail function, distribution plant, general property plant, and working capital. It includes totals for various categories such as demand-related, energy-related, and customer-related assets. The total average rate base is listed as $5,589,337.

EXHIBIT 3 PAGE 1 OF 5
EXHIBIT 3 PAGE 1 OF 5 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) PHP (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION FACTOR DEMAND CLASSI...

AI summary The document presents a table with various demand classifications and categories, including total company, domestic, small general, general, large general, small industrial, medium industrial, large industrial, PHP, municipal, and unmetered, along with an allocation factor column. It appears to be related to energy demand segmentation.

EXHIBIT 3 PAGE 2 OF 5
EXHIBIT 3 PAGE 2 OF 5 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION (16) DEF. CR ARO Trans -52 -33 -2 -9 -1 -1 -1 -2 -2 -1 -0 D-3A (17) SUB-TOTAL 48,119 30,913 1,578 8,564 976 877 1,12...

AI summary The document presents a detailed table of various financial and operational allocations, including distribution plant costs, transmission functions, and general property plant expenses. It includes allocations across different categories and sizes, with some entries referencing exhibits and other documents.

EXHIBIT 3 PAGE 3 OF 5
EXHIBIT 3 PAGE 3 OF 5 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) INDUSTRIAL LARGE (9) PHP (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION FACTOR ENERGY CLASSI...

AI summary The text presents a table with energy classification categories and associated columns, likely related to utility billing or energy distribution. The table includes various customer classifications such as domestic, small general, general, large general, small industrial, medium industrial, industrial large, PHP, municipal, and unmetered, along with an allocation factor column.

EXHIBIT 3 PAGE 5 OF 5
EXHIBIT 3 PAGE 5 OF 5 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) INDUSTRIAL LARGE (9) PHP (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION FACTOR (1) CUST. CLA...

AI summary This table provides a breakdown of distribution and general property plant values across various customer classifications and categories in Nova Scotia. It includes total company values, domestic, small general, general, large general, small industrial, medium industrial, industrial large, PHP, municipal, and unmetered classifications, along with allocation factors for each category.

ALLOCATION OF AVERAGE POLE INVESTMENT
ALLOCATION OF AVERAGE POLE INVESTMENT (1) TOTAL PLANT (2) PRIMARY DEMAND (3) PRIMARY CUSTOMER (4) SECONDARY DEMAND (5) SECONDARY CUSTOMER ( 1) DOMESTIC $338,328 $39,627 $175,796 $30,989 $91,915 ( 2) SMALL GENERAL 18,913 2,166 9,867 1,721 5...

AI summary The document presents a table detailing the allocation of average pole investment across different customer categories, including domestic, small general, general, industrial, and others, with various columns indicating total plant, primary demand, primary customer, secondary demand, and secondary customer values.

ANALYSIS OF AVERAGE METER INVESTMENT
ANALYSIS OF AVERAGE METER INVESTMENT (1) TOTAL (2) UNIT METER (3) TOTAL (4) (5) METER COST CUSTOMERS COST COST PERCENT ($000) ( 1) DOMESTIC 488,926 $129.17 $63,154,593 84.03 $59,182 ( 2) SMALL GENERAL 27,443 146.15 4,010,750 5.34 3,758 ( 3...

AI summary The document presents a detailed analysis of average meter investment across various customer categories in Nova Scotia, including domestic, small general, general, industrial, and others, with data on the number of customers, total costs, and meter costs per category.

DEMAND CLASSIFICATION
DEMAND CLASSIFICATION (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (9) (10) (11) ALLOCATION (16) TOTAL TRANSMISSION 139,194.86 89,400 4,571 24,801 2,821 2,541 3,259 5,058 4,170 1,927 647 (17) (18) DISTRIBUTION...

AI summary The document presents a detailed breakdown of demand classification, including various categories such as operating and maintenance costs, depreciation, interest, and corporate taxes. It includes figures for different classifications and references exhibits and pages for further details.

ALLOCATION OF DISTRIBUTION OPERATING EXPENSES
ALLOCATION OF DISTRIBUTION OPERATING EXPENSES (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) PHP (10) MUNICIPAL (11) UNMETERED (12) ALLOCAT...

AI summary The document presents a detailed breakdown of distribution operating expenses across various categories and customer segments, including substation costs, overhead lines, underground lines, and storm expenses. Allocation factors and specific line items are provided for different classifications of customers and services.

EXHIBIT 8B PAGE 1 OF 3
EXHIBIT 8B PAGE 1 OF 3 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) PHP (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION FACTOR (11) METER I...

AI summary The document presents a table detailing various cost allocations and responsibilities across different customer categories and plant types, including investment custodial costs, demand costs for generation and transmission plants, and distribution plant costs. It includes percentages of responsibility and allocation factors for each category.

EXHIBIT 8B PAGE 2 OF 3
EXHIBIT 8B PAGE 2 OF 3 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL ELI 2P-RTP MUNICIPAL UNMETERED FACTOR (1) T...

AI summary The exhibit presents a detailed breakdown of rate base allocations across different categories and sizes, including responsibility percentages for various segments. It includes data on total rate base for engineering, customer distribution, retail, and poles, with corresponding responsibility percentages for each category.

FOR JANUARY 2026
FOR JANUARY 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM...

AI summary The document presents a table with various metrics related to energy sales, losses, and demand factors for January 2026, categorized by different customer classes and subtotals. It includes data on energy requirement, system coincidence factor, and demand line losses, among other parameters.

FOR FEBRUARY 2026
FOR FEBRUARY 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTE...

AI summary The document presents a table with energy sales, losses, and demand factors categorized by customer class for February 2026. It includes metrics such as energy requirement, system coincident demand, and load/demand factors, providing a detailed breakdown of energy usage and performance across different sectors.

FOR APRIL 2026
FOR APRIL 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM C...

AI summary This table presents energy sales, losses, and demand factors for different customer classes in April 2026. It includes metrics such as MWH sales, energy line losses, energy requirement, system coincident demand, and load factor for various categories like domestic, industrial, and municipal.

FOR JUNE 2026
FOR JUNE 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM CO...

AI summary The document presents a table with various energy metrics, including MWH sales, energy losses, demand factors, and other related statistics categorized by different customer classes and sectors. It includes totals and subtotals for various categories, as well as some redacted information.

FOR JULY 2026
FOR JULY 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM CO...

AI summary The text presents a table of energy sales, losses, and demand metrics for July 2026, categorized by customer class and including subtotals and totals. The table includes data on energy sales, energy losses, demand factors, and other related metrics across various customer segments and special categories.

FOR AUGUST 2026
FOR AUGUST 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM...

AI summary The document presents a table with various metrics related to energy sales, losses, and demand factors across different customer classes in August 2026. It includes data on energy sales, losses, and demand factors for domestic, industrial, and other categories, as well as subtotals and totals for the period.

FOR SEPTEMBER 2026
FOR SEPTEMBER 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYST...

AI summary The document presents a table with various metrics related to energy sales, losses, and demand factors across different customer classes for September 2026. It includes data on energy sales, energy losses, energy requirements, demand factors, and other related metrics, organized by customer categories such as domestic, industrial, and municipal.

FOR OCTOBER 2026
FOR OCTOBER 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM...

AI summary The text presents a table with data related to energy sales, losses, and demand factors across various customer classes in October 2026. It includes metrics such as energy requirement, system coincident demand, and load factor for different categories like domestic, industrial, and municipal.

FOR DECEMBER 2026
FOR DECEMBER 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTE...

AI summary The document presents a table with data for December 2026, detailing energy sales, losses, demand factors, and other metrics across various customer classes, including domestic, industrial, and municipal sectors.

DETERMINATION OF CLASS NON-COINCIDENT KW DEMAND BY VOLTAGE LEVEL
DETERMINATION OF CLASS NON-COINCIDENT KW DEMAND BY VOLTAGE LEVEL (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL PHP MUNICIPAL UNM...

AI summary The document presents a detailed table outlining the determination of class non-coincident kW demand by voltage level, including various categories such as small, general, large, and industrial, along with associated losses and subtotals. The percentages of non-coincident demand losses are also provided for different voltage levels.

SUMMARY OF DISTRIBUTION SYSTEM ENERGY LINE LOSSES
SUMMARY OF DISTRIBUTION SYSTEM ENERGY LINE LOSSES Γ NOVA SCO TION SYST HE YEAR EN GY LINE монтн (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUST. (7) MEDIUM INDUST. (8) LARGE INDUST. (9) UNMETERED (1)...

AI summary This table summarizes the distribution system energy line losses for Nova Scotia throughout the year, showing monthly and annual average percentages across different customer categories, including small general, large general, small industrial, medium industrial, large industrial, and unmetered accounts.

SUMMARY OF DISTRIBUTION SYSTEM DEMAND LINE LOSSES
SUMMARY OF DISTRIBUTION SYSTEM DEMAND LINE LOSSES Transmiss ion Losses DISTRIE BUTION SYS MAND LINE HE YEAR EN TH SYST EM PEAK 2.43% 4.22% (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUST. (7) MEDIUM I...

AI summary The document presents a summary of distribution system demand line losses, including various percentages for different categories such as small general, medium industrial, and large industrial. The data shows fluctuations in losses over time, with some categories experiencing negative values.

(IN THOUSANDS OF DOLLARS) FOR THE YEAR ENDING DECEMBER 31, 2026
(IN THOUSANDS OF DOLLARS) FOR THE YEAR ENDING DECEMBER 31, 2026 Calendar Month of System Peak 1 January February March April May June July August September October November December Total (65) SYSTEM COINCIDENT DMD MUNICIPAL 30,554 31,787...

AI summary The document presents a table detailing system demand across various categories for the year ending December 31, 2026, including municipal, unmetered, and interruptible demand. The data reflects monthly figures and totals, providing a comprehensive overview of demand patterns.

(IN THOUSANDS OF DOLLARS)
(IN THOUSANDS OF DOLLARS) (1) (2) (3) (4) (5) (6) (7) (8) (9) INITIAL R/B CLASSIFICATION FURTHER CLASSIFICATION FULLY CLASSIFIED RATE BASE DEMAND PLANT ENERGY PLANT CUSTOMER PLANT DEMAND PLANT ENERGY PLANT CUSTOMER PLANT DEMAND PLANT ENERG...

AI summary The document presents a table detailing the classification of rate base components, including distribution plant, land, easements, substations, poles, lines, and transformers, across different categories such as demand plant, energy plant, and customer plant. It provides figures in thousands of dollars for initial, further, and fully classified rate bases.

ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE
ALLOCATION OF AVERAGE DISTRIBUTION RATE BASE (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) PHP (10) MUNICIPAL (11) UNMETERED (12) ALLOCATI...

AI summary The document presents a table detailing the allocation of average distribution rate base across various categories, including company-wide totals, domestic, small general, general, large, small industrial, medium industrial, large industrial, PHP, municipal, and unmetered. Allocation factors and specific line items are listed.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS EXPENSES EXPENSES EXPENSES EXPENSES EXPENSES EXPENSES ALLOCATOR (1) LABOUR O&M excluding HR, IT, PR, OTHER and direct 201,366 87,716 22,048 57,505 34,097 - (2) % RESPONSIBILITY 100.0...

AI summary The document presents a table detailing Nova Scotia Power Inc.'s allocation factors for various expenses, including labor, insurance, compliance reporting, and procurement responsibilities across different business segments such as production, transmission, distribution, and retail.

FOR FEBRUARY 2027
FOR FEBRUARY 2027 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTE...

AI summary This document presents a table with various metrics related to energy sales, losses, and demand factors across different customer classes in February 2027. The table includes data on MWH sales, energy losses, energy requirements, demand factors, and system peak demand for various categories such as domestic, industrial, and municipal.

FOR MARCH 2027
FOR MARCH 2027 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM C...

AI summary The document presents a detailed table of energy sales, losses, and demand metrics categorized by different customer classes for March 2027. It includes metrics such as energy sales, energy losses, demand factors, and system peak demand across various sectors like domestic, industrial, and municipal.

FOR MAY 2027
FOR MAY 2027 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM COI...

AI summary The document presents a table with various energy metrics for May 2027, including energy sales, losses, demand factors, and other related figures. The data includes subtotals, shore power, generation replacement, and other specific categories. The table provides an overview of system performance and energy requirements.

FOR JULY 2027
FOR JULY 2027 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM CO...

AI summary The document presents a table with various energy metrics for July 2027, including energy sales, losses, demand factors, and other related figures. It provides a detailed breakdown of energy usage across different customer classes and includes subtotals and totals for various categories.

FOR DECEMBER 2027
FOR DECEMBER 2027 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTE...

AI summary The table presents energy sales, losses, and demand metrics for various customer classes in December 2027, including metrics like energy losses, system demand, and load factor, which provide an overview of energy distribution and consumption patterns.

FOR THE YEAR ENDING DECEMBER 31, 2027
FOR THE YEAR ENDING DECEMBER 31, 2027 MONTH (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUST. (7) MEDIUM INDUST. (8) LARGE INDUST. (9) PHP (10) MUNICIPAL UNMETERED (11) (12) SHORE POWER (13) G...

AI summary This table presents monthly and total demand data for various customer categories and services for the year ending December 31, 2027. It includes data for different customer segments such as domestic, small general, general, large, small industrial, medium industrial, and large industrial, along with specific services like PHP, municipal unmetered, shore power, and others.

FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS)
FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) Calendar Month of System Peak 1 January February March April May June July August September October November December Total (31) LINE LOSSES - GEN REPL / LOAD FOLL

AI summary The document presents a table titled 'FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS)' with a row labeled '(31) LINE LOSSES - GEN REPL / LOAD FOLL' and columns for each month and total. The row is empty, indicating no data provided for line losses related to generation replacement and load follow.

(IN THOUSANDS OF DOLLARS) FOR THE YEAR ENDING DECEMBER 31, 2027
(IN THOUSANDS OF DOLLARS) FOR THE YEAR ENDING DECEMBER 31, 2027 Calendar Month of System Peak 1 January February March April May June July August September October November December Total (142) (141) Distribution Primary Voltage - Municipa...

AI summary The text presents a table with financial data for various distribution and system demand metrics across different voltage levels and regions in Nova Scotia for the year ending December 31, 2027. It includes percentages and monetary values related to losses and demand factors.

N-80Response to Undertaking U-11 1 passage
Summary
Summary Unnamed: 0 NOVA SCOTIA POWER, INC. Unnamed: 2 Unnamed: 3 Unnamed: 4 Unnamed: 5 Unnamed: 6 Unnamed: 7 Unnamed: 8 Unnamed: 9 Unnamed: 10 Unnamed: 11 Unnamed: 12 Unnamed: 13 Unnamed: 14 Unnamed: 15 Unnamed: 16 Unnamed: 17 Unnamed: 18...

AI summary The table provides detailed financial data on overhead and underground conductors, devices, and infrastructure related to transmission and distribution plants, including costs, quantities, and other metrics.

N-91Compliance Filing 1 passage
28
28 1 3.9 Amendments Arising from GRA IR Process 11 NS Power confirms that the revision to the DCA is reflected in the COSS attachments to 12 Compliance SR-01. 13 14 Renewall IR-7 contained the following commitment: 15 16 17 18 19 20 21 22...

AI summary The document discusses amendments to the Distribution Tariff following the GRA IR Process. NS Power acknowledges that the Distribution Tariff has been updated to include service to RTR Transmission-connected customers, aligning with proposed revisions to the DTR. This update was not initially made to the main body of the Distribution Tariff and requires a Board determination before finalizing.

N-91-(iii)Compliance Filings - Regulations 2 passages
Section 4 p. pp. 0-1
"Distribution System Access" The services provided by the Company under the Distribution Tariff to provide for the connection of the RtR Customer to the Company's distribution system, but does not include the provision of electricity. Thes...

AI summary The text defines key terms related to distribution system access, meter readings, licensed retail suppliers, and load definitions under the Distribution Tariff. It outlines the services provided by the Company, the role of licensed retail suppliers, and the scope of terms used in electricity regulation.

Section 19 p. pp. 10-11
"Distribution System Access" The services provided by the Company under the Distribution Tariff to provide for the connection of the RtR Customer to the Company's distribution system, but does not include the provision of electricity. Thes...

AI summary The text defines key terms related to distribution system access, retail supplier licensing, and metering services. It outlines the services provided by the Company under the Distribution Tariff and specifies the requirements for a Licenced Retail Supplier (LRS) and the terms of the LRS Participation Agreement.

N-91-(v)N-91-(v).pdf 4 passages
7. NS POWER RESPONSIBILITIES p. p. 88
7. NS POWER RESPONSIBILITIES NS Power shall be responsible for: - (a) provision of Distribution System Access; - (b) processing RtR Customer Transaction Request Applications that are received from an LRS on behalf of the RtR Customer; - (c...

AI summary NS Power is responsible for providing distribution system access, processing customer transaction requests, providing billing data, and acting as a point of contact for RtR Customers. However, NS Power is not responsible for supplying electricity or enforcing contracts between RtR Customers and LRS.

9. INTERRUPTION OF DISTRIBUTION SYSTEM ACCESS p. p. 89
9. INTERRUPTION OF DISTRIBUTION SYSTEM ACCESS Notwithstanding any term of this Distribution Tariff, NS Power shall have the right to suspend or interrupt, in whole or in part, the provision of Distribution System Access for the purpose of...

AI summary NS Power has the right to suspend or interrupt distribution system access for safety or maintenance reasons, but must make reasonable efforts to minimize disruption. Customers remain responsible for paying charges during interruptions and must resume service once available.

Preamble p. p. 213
In this Distribution Tariff, the following terms shall have the following meanings: Act : The Electricity Act , S.N.S. 2004, c. 25, as amended from time to time. Ancillary Services : Services that are necessary to support the transport of...

AI summary The document defines key terms related to the Distribution Tariff, including definitions of Act, Ancillary Services, Board, Bundled Service, Customer Information, Demand Side Management Recovery Charges, Distribution System, Distribution System Access, Distribution Tariff, and Good Utility Practice, with an effective date of January 1, 2017.

7. NS POWER RESPONSIBILITIES p. p. 216
7. NS POWER RESPONSIBILITIES NS Power shall be responsible for: - (a) provision of Distribution System Access; - (b) processing RtR Customer Transaction Request Applications that are received from an LRS on behalf of the RtR Customer; - (c...

AI summary NS Power is responsible for providing distribution system access, processing customer transaction requests, providing billing data, and acting as a point of contact for RtR customers. However, NS Power is not responsible for supplying electricity or enforcing contracts between RtR customers and LRSs.

N-92Compliance Filing - Standardized Filings - Redacted 4 passages
Section 329
100.00% 66.23% 3.38% 18.35% 2.09% 1.88% 2.42% 3.75% 0.00% 1.43% 0.48% P-8A (17) DEMAND - TRANS. PLT. - EHV $820,016 $526,793 $26,893 $145,934 $16,635 $14,949 $19,216 $29,828 $24,589 $11,365 $3,814 (18) % RESPONSIBILITY 100.00% 64.24% 3.28%...

AI summary The document presents a series of financial figures and percentages related to various categories such as demand, distribution, and generation plants, along with their respective responsibilities and associated costs, likely from a regulatory proceeding involving utility operations and financial accountability.

Section 508
0 0 0 (17) (18) TRANSMISSION PLANT 1,000,894 0 1,000,894 0 0 0 (19) (20) DISTRIBUTION PLANT (21) (22) LAND 5,050 0 0 5,050 0 0 (23) EASEMENTS & SURVEY 207,143 0 0 207,143 0 0 (24) OTHER 20,781 0 0 20,781 0 0 (25) SUBSTATIONS 192,024 0 0 19...

AI summary The document presents a detailed breakdown of costs associated with various components of the transmission and distribution plant, including land, easements, substations, poles, lines, transformers, and meters. These figures are likely part of a regulatory proceeding related to infrastructure costs.

Section 538
(1) DISTRIBUTION FUNCTION (2) (3) DISTRIBUTION PLANT: (4) LAND $2,624 $0 $2,426 $0 $0 $0 $2,624 $0 $2,426 (5) EASEMENTS & SURVEY 107,643 0 99,500 0 0 0 107,643 0 99,500 (6) OTHER 10,799 0 9,982 0 0 0 10,799 0 9,982 (7) SUBSTATIONS 192,024...

AI summary This document presents a detailed breakdown of the costs associated with the distribution plant, including land, easements, substations, poles, lines, transformers, and other infrastructure components, with figures listed for different years and categories.

Section 808
100.00% 66.38% 3.51% 18.24% 2.09% 1.91% 2.20% 3.75% 0.00% 1.43% 0.49% P-8A (17) DEMAND - TRANS. PLT. - EHV $1,000,894 $644,399 $34,112 $177,035 $20,280 $18,548 $21,391 $36,357 $30,104 $13,877 $4,792 (18) % RESPONSIBILITY 100.00% 64.38% 3.4...

AI summary The text presents financial data and percentages related to various energy and demand-related costs, including distribution plants, generation plants, and transmission plants, with specific figures and responsibility percentages for each category.

N-94Revised Regulations 6 passages
In these regulations unless the context requires otherwise: p. pp. 0-11
In these regulations unless the context requires otherwise: "As Found Meter Test" "As Found Meter Test" is a test on the meter removed from a premise and tested at the Company's Measurement Canada certified test center in the condition in...

AI summary The document defines key terms used in regulations, including 'As Found Meter Test,' 'Board,' 'Company,' 'Customer,' and 'Demand.' It also outlines the services provided under the Distribution Tariff for RtR Customers, focusing on connection to the distribution system and related services.

p. p. 2
"Permanent Service" "permanent service" is one terminated on a permanent structure and which can be expected to remain in place without alteration for the useful life of the service. It may serve a conventional building, mobile home, or re...

AI summary The text defines 'permanent service' as a service terminated on a permanent structure, expected to remain in place for the useful life of the service, and may serve conventional buildings, mobile homes, or recurring seasonal services.

Section 16 p. p. 6
"Distribution System Access" The services provided by the Company under the Distribution Tariff to provide for the connection of the RtR Customer to the Company's distribution system, but does not include the provision of electricity. Thes...

AI summary The text defines key terms related to distribution system access, farming or fishing units, licenced retail suppliers, load, LRS participation agreements, meters, and meter seals. These definitions are part of a regulatory framework governing electricity services and customer interactions.

"Overhead service extension" p. pp. 12-19
"Overhead service extension" "overhead service extension" means any above ground extension across private property or along a private road required to serve only a single customer; "Owner" "owner" is any person having title to the whole or...

AI summary The text defines 'overhead service extension' as an above-ground extension across private property or along a private road required to serve a single customer. It also defines 'Owner' as any person with title to premises, including joint owners or tenants.

p. p. 13
"Permanent Service" "permanent service" is one terminated on a permanent structure and which can be expected to remain in place without alteration for the useful life of the service. It may serve a conventional building, mobile home, or re...

AI summary The text defines 'permanent service' as a service terminated on a permanent structure, expected to remain in place for the useful life of the service, and may serve a conventional building, mobile home, or recurring seasonal service.

p. p. 19
"Permanent Service" "permanent service" is one terminated on a permanent structure and which can be expected to remain in place without alteration for the useful life of the service. It may serve a conventional building, mobile home, or re...

AI summary The document defines 'permanent service' as a service terminated on a permanent structure, expected to remain in place without alteration for the useful life of the service, and may serve a conventional building, mobile home, or recurring seasonal service.

101354Board Decision 1 passage
Poles Overhead Conductors Underground Conductors p. p. 258
Poles Overhead Conductors Underground Conductors Primary - Demand 15% 49% 6% Primary - Customer 49% 30% 1% Secondary - Demand 11% 3% 17% Secondary - Customer 25% 17% 76% [Exhibit N-9, PDF p. 1225]

AI summary The table presents distribution system usage percentages across different categories (Primary - Demand, Primary - Customer, Secondary - Demand, Secondary - Customer) and infrastructure types (Poles, Overhead Conductors, Underground Conductors).

101825Board Order 2 passages
7. NS POWER RESPONSIBILITIES p. p. 92
7. NS POWER RESPONSIBILITIES NS Power shall be responsible for: - (a) provision of Distribution System Access; - (b) processing RtR Customer Transaction Request Applications that are received from an LRS on behalf of the RtR Customer; - (c...

AI summary NS Power is responsible for distribution system access, processing customer transaction requests, providing billing data, and acting as a point of contact for RtR Customers. However, it is not responsible for supplying electricity or enforcing contracts between RtR Customers and LRS.

9. INTERRUPTION OF DISTRIBUTION SYSTEM ACCESS p. p. 93
9. INTERRUPTION OF DISTRIBUTION SYSTEM ACCESS Notwithstanding any term of this Distribution Tariff, NS Power shall have the right to suspend or interrupt, in whole or in part, the provision of Distribution System Access for the purpose of...

AI summary NS Power may suspend or interrupt distribution system access for safety, repairs, or improvements, but customers remain obligated to pay charges during such interruptions and must resume service once it is restored.

102721Board Order 1 passage
Section 8 p. p. 2
"Distribution System Access" The services provided by the Company under the Distribution Tariff to provide for the connection of the RtR Customer to the Company's distribution system, but does not include the provision of electricity. Thes...

AI summary The text defines key terms related to distribution system access, licensed retail suppliers, and metering, outlining the services provided by the Company and the requirements for LRS participation. It also includes definitions for 'farming or fishing unit' and 'load'.

101825Board Order 4 passages
Preamble p. p. 89
In this Distribution Tariff, the following terms shall have the following meanings: Act : The Electricity Act , S.N.S. 2004, c. 25, as amended from time to time. Ancillary Services : Services that are necessary to support the transport of...

AI summary This section defines key terms in the Distribution Tariff, including the Act, Ancillary Services, the Board, Bundled Service, Customer Information, Demand Side Management Recovery Charges, Distribution System, Distribution System Access, Distribution Tariff, and Good Utility Practice, providing clarity on the structure and scope of the tariff and associated services.

7. NS POWER RESPONSIBILITIES p. p. 92
7. NS POWER RESPONSIBILITIES NS Power shall be responsible for: - (a) provision of Distribution System Access; - (b) processing RtR Customer Transaction Request Applications that are received from an LRS on behalf of the RtR Customer; - (c...

AI summary NS Power is responsible for providing distribution system access, processing customer transaction requests, providing billing data, and acting as a contact point for RtR Customers. However, it is not responsible for supplying electricity, monitoring contracts between RtR Customers and LRS, or being liable for the LRS's failures.

9. INTERRUPTION OF DISTRIBUTION SYSTEM ACCESS p. p. 93
9. INTERRUPTION OF DISTRIBUTION SYSTEM ACCESS Notwithstanding any term of this Distribution Tariff, NS Power shall have the right to suspend or interrupt, in whole or in part, the provision of Distribution System Access for the purpose of...

AI summary NS Power may suspend or interrupt distribution system access for safety, repairs, or improvements, but customers remain liable for charges during interruptions and must resume service once restored.

Effective: May 1, 2026 Page 32 of 33 p. p. 144
Effective: May 1, 2026 Page 32 of 33 Nova Scotia Power Inc. N SPI (FAM) A-1 Annual FAM Reporting ONFIDENTIAL Year 20XX Summary of Wind Curtailments Properties January February March April May June July August September October November Dec...

AI summary The document presents a table detailing annual wind curtailments by Nova Scotia Power Inc. (NSPI) and other wind generation sources, including percentages of curtailments relative to total wind generation. The table includes notes and is marked as confidential.

102721Board Order 2 passages
Section 8 p. p. 2
"Distribution System Access" The services provided by the Company under the Distribution Tariff to provide for the connection of the RtR Customer to the Company's distribution system, but does not include the provision of electricity. Thes...

AI summary The text defines key terms related to distribution system access, farming or fishing units, licensed retail suppliers, load, LRS participation agreements, meters, and meter seals. These definitions are part of regulatory terminology used in Nova Scotia's electricity sector.

7.2.6 Review of Plans and Specifications p. p. 8
7.2.6 Review of Plans and Specifications The Inspection Authority may, prior to issuing a permit, request the submission of plans and specifications for any proposed electrical installation. Plans shall be submitted for all commercial, ind...

AI summary The Inspection Authority has the authority to request plans and specifications for electrical installations before issuing permits, particularly for commercial, industrial, and institutional installations exceeding 250 volts or 250 amperes.

20260107-1Hearing Transcript — 01/07/2026 (Willett, Williams, Flemming, MacIntosh, Blair) 1 passage
Section 147
1 earlier that there are many American utilities that do? 2 A. (Blair) There are. 3 THE CHAIR: Mr. Goodine, could we pull 4 up Exhibit N-9, please? And I'm looking at page PDF 5 page 1471. 6 BY THE CHAIR: 7 [12:30:12] Q. This is a jurisdic...

AI summary The discussion revolves around the allocation of distribution costs in Canadian jurisdictions, with a focus on the use of the Minimum System approach and variations in its application across regions such as Saskatchewan, Quebec, Newfoundland, Ontario, and New Brunswick. The conversation includes references to methods used for distribution cost allocation and the differences in how jurisdictions apply these methods.

20260109-1Hearing Transcript — 01/09/2026 (Pecurica, Willett, WIlliams, Flemming, MacIntosh) 1 passage
1 of possibilities as to exactly where the Control Centre 2 sits and that might be another issue? 3 A. (Williams) Even physically, ––– 4 Q. Yeah. 5 A. (Williams) ––– yes. 6 Q. Yeah. Okay. 7 MEMBER DEVEAU: The –– let's look at 8 Grant Thorn...

AI summary The discussion revolves around the Control Centre, increased labour costs due to additional employees for operational requirements, and the potential transfer of resources to the NSIESO as part of Phase 2. The conversation references an audit and interconnection requests.

20260113-1Hearing Transcript — 01/13/2026 (Pecurica, Willett, Williams, Flemming, MacIntosh) 1 passage
1 A. I did not.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS Q. And in speaking with my friend concerning the numbers set by Ontario I believe you said that the number was perhaps dated or old. A. Oh, I just mean simply that I understand this wa...

AI summary The witness discusses the Minimum System used by utilities, noting that it may have increased over time due to the installation of larger equipment. The discussion also touches on load-carrying capability within the Minimum Distribution Study.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →