Topic:"Distribution Planning" in M13007

Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Fee Recovery Mechanism Application
2 passages 2 documents

Distribution Planning across all matters →

N-9IESO (IG) RIR 1 Attachments 1 - REFILED 1 passage
Option 5: SLF for Gen , Demand for Tx
Option 5: SLF for Gen , Demand for Tx Options Summary ¢/kWh Base cost of fuel Non-fuel Subtotal FAM AA FAM BA Subtotal DSM PCR DSM BA Subtotal SCRR IESO RR Fuel-related in aggregate ¢/kWh ¢/kWh ¢/kWh ¢/kWh ¢/kWh ¢/kWh 9.864 18.919 0.000 0....

AI summary The document presents a detailed breakdown of costs and rates associated with Option 5, focusing on the SLF for Generation and Demand for Transmission. It includes various components such as base fuel costs, non-fuel costs, and adjustments related to DSM, SCRR, and IESO.

103392IG (IESO Nova Scotia) IR 1 to 11 1 passage
12 Reference: Application, Section 3.3, p. 13, lines 1-3 and footnote 7.
12 Reference: Application, Section 3.3, p. 13, lines 1-3 and footnote 7. - 13 (a) Please distinguish between "inseparable costs" and "direct costs" including 14 those associated with interconnection studies, with specific examples, and 15...

AI summary The text requests clarification on the distinction between 'inseparable costs' and 'direct costs,' including those related to interconnection studies, and asks whether wheeling transactions are anticipated on the Nova Scotia transmission system and how they are accounted for in the Fee Calculation Model.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →