D-4NSPI (NSEB) RIR-1 to RIR-3 (redacted) 1 passage
NOTES:
NOTES: - A. THE VERTICAL CLEARANCES APPLY UNDER CONDITIONS OF MAXIMUM SAG. - B. THE HORIZONTAL CLEARANCES ARE FROM THE INITIAL SAG POSITION AND APPLY FOR A MAXIMUM SPAN OF 75 METERS. - C. CLEARANCES SHOULD TAKE INTO ACCOUNT THE ACCESS AND...

AI summary The document outlines clearance requirements for electrical conductors near buildings, including vertical and horizontal clearances under different conditions such as maximum sag, building usage, voltage levels, and snow accumulation. It also specifies exceptions and adjustments for specific building types and materials.

103529NSEB (NSPI) IR-1 to IR-3 1 passage
Request IR-1:
Request IR-1: - In its letter responding to the Board's correspondence about the complaint, NS Power noted the following on page 5: - Other options to supply the necessary power were considered and rejected at the planning stage, partly be...

AI summary The document includes two requests (IR-1 and IR-2) related to a regulatory proceeding. IR-1 asks for an updated distribution planning study and alternative routing options for power supply. IR-2 concerns the approval of pole permits by HRM for electrical upgrades and whether NS Power agrees with the Board's understanding of regulations regarding power line placement.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →