P-1-(ii)Appendix B - Green Choice PPA Blackline to PPA in M11455 1 passage
Figure 2 – Definition of Zones p. p. 115
Figure 2 – Definition of Zones Definition of Zones 69 kV Line Zone 69 kV Line Zone 69 kV Line Zone 138 kV Line Zone 138 kV Line Zone 230 kV Line Zone 345 kV Line Zone L-5003 3 L-5044 4 L-5536 4 L-6001 2,3 L-6053 4 L-7001 2,3 L-8001 2 L-500...

AI summary The document presents a table defining zones for various electrical lines in Nova Scotia, categorizing them based on voltage levels (69 kV, 138 kV, 230 kV, 345 kV) and assigning zone numbers. This information is likely used for grid planning and management.

P-1-(iii)Appendix C - DRAFT #1 Green Choice PPA 2026 - CLEAN 1 passage
Note to Draft: The Facility Interconnection requirements in this Section 2.2 are under review and are subject to change.] p. p. 29
twork Resource Interconnection Service; and subject to Section [2.2(e),](#page-30-0) if the Interconnection System Impact Study prepared by the System Operator for the Network Resource Interconnection Service provides written estimates of...

AI summary The text outlines procedures for interconnection services based on the results of an Interconnection System Impact Study. If network upgrades exceed a threshold amount, the seller must withdraw the network resource interconnection request and proceed with energy resource interconnection service. Otherwise, the seller may choose between the two services.

P-1-(v)Appendix E - Draft Green Choice Program Procurement Request for Proposals (RFP) 1 passage
Overview of Process for Routing and Transportation of Turbines to Project Site: p. p. 57
Overview of Process for Routing and Transportation of Turbines to Project Site: - 1. Proponents engage with turbine manufacturers to gather quotes for the RFP. - 2. Selected Proponents engage with turbine manufacturers for supply agreement...

AI summary The document outlines the process for routing and transporting turbines to a project site, including engaging with manufacturers, conducting feasibility studies, and analyzing proposed routes for potential challenges related to weight, dimensions, and logistics.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →