Matter: Nova Scotia Power Inc. - CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - $2,331,683
4 passages 2 documents

Distribution Planning across all matters →

N-1CI 49595 – HYD Tusket Unit 1 Overhaul - Application - Redacted 3 passages
Observations:
Observations: - Harbourside completed a site visit on August 7, 2025, to observe the interior of the scroll case at the unit 1 turbine. Harbourside observed and collected measurements of the concrete block supporting the quadrant shaft and...

AI summary Harbourside conducted a site visit to Unit 1 turbine's scroll case on August 7, 2025, to inspect the concrete structures and test air quality with a confined space rescue crew present.

3.1 Stuffing Box
3.1 Stuffing Box - Design of a new stuffing box or modifications to the existing one to accommodate a new seal water intake.

AI summary The text discusses the design of a new stuffing box or modifications to an existing one to accommodate a new seal water intake.

3.6 Gate Link Bushings and Pins
3.6 Gate Link Bushings and Pins - Provide design to support the conversion of greased bronze bushings to greaseless CIP bushings. - Drawing should include bushing housing bore size, based on as-found conditions. - Design of new stainless s...

AI summary The text outlines requirements for the design of bushings and pins, including the conversion from greased bronze bushings to greaseless CIP bushings and the design of new stainless steel pins.

N-2CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - Application - Redacted 1 passage
Recorded Amps:
Recorded Amps: Coil # Volts Coil # Volts Coil # Volts Coil # Volts Coil # Volts 1 21 41 2 22 42 3 23 43 4 24 44 5 25 6 26 7 27 8 28 9 29 10 30 11 31 12 32 13 33 14 34 15 35 16 36 17 37 18 38 19 39 20 40 Tested By: Date: Average volts #DIV/...

AI summary The document contains recorded amps and inspection criteria for a hydro unit at the Tusket plant. It outlines the condition of various components, including the exciter, rotor, and stator, with ratings and comments on cleanliness, wear, and maintenance history. The information is part of a technical inspection report.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →