Matter: NSPI CI# 33525 - $8,016,435 - Canaan Rd. 43V to Tremont 51V Line
2 passages 2 documents

Distribution across all matters →

N-1Redacted Work Order 7/27/2010 1 passage
Why do this project now? p. p. 14
Why do this project now? The 2010/11 peak load on the 69kV system in the Annapolis Valley is forecasted to reach levels such that failure of selected elements (138kV line or 138-69kV transformer) during peak load conditions causes the volt...

AI summary The 2010/11 peak load on the 69kV system in the Annapolis Valley is forecasted to reach levels that could cause voltage drops below acceptable levels if certain system elements fail during peak conditions, potentially leading to outages.

N-2NSPI Redacted Responses to Information Requests 1 passage
NON-CONFIDENTIAL p. p. 0
NON-CONFIDENTIAL 1 Response IR-T11: (cont'd) 3  The work requirement is intermittent. The contractor is able to sustain its workforce 4 and the skills of its employees by doing similar work for other parties. The 5 intermittent nature of...

AI summary The response outlines reasons for engaging a contractor workforce, including the intermittent nature of the work, lower contractor costs, variability in work location and content, and the specialized skills required. The contractor provides flexibility to NSPI to meet customer needs without long-term workforce commitments.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →