Why do this project? The load on the 69kV system in the Annapolis Valley has increased to a level where a loss of some source elements (138kV line or 138-69kV transformer) in the area, under peak load conditions, causes the voltage on the...
AI summary The load on the 69kV system in the Annapolis Valley has increased, requiring an additional 138kV supply to maintain reliability during peak load periods. The project involves interconnecting a new 138kV line from 43V-Canaan Road to 51V-Tremont at the 43V-Canaan Road Substation.