Topic/Matter Intersection

Topic:"Distribution" in M03683

Matter: P-141 - Nova Scotia Power Inc. - Request Approval of the 2011 Annually Adjusted Rates (AAR's)Request approval of 2011 Annually Adjusted Rates: 1) Load Following (LF) portion of the GRLF Tariff; 2) One Part Real Time Price (1P-RTP) Fixed Cost Adders; 3) Wholesale Market Back-Up/Top-up (BUTU) Tariff; 4) Wholesale Market Non-Dispatchable Supplier Spill (Spill) Tariff
8 passages 5 documents

Distribution across all matters →

N-1NSPI Redacted 2011 Annually Adjusted Rates 11/5/2010 4 passages
Section 50 p. p. 27
- (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity of the power supply system, by reason of its design and/or operation. These specific requirement...

AI summary The document outlines requirements for customers to ensure their load does not negatively impact the integrity of the power supply system. Specific considerations include reliability, harmonic levels, voltage flicker, and other stability factors. These requirements are established through a written operating agreement.

Section 66 p. p. 27
- (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity of the power supply system, by reason of its design and/or operation. These specific requirement...

AI summary The text outlines customer responsibilities to maintain power supply integrity through proper load management and compliance with written operating agreements. It also lists factors considered in assessing potential impacts on system integrity, including reliability and voltage stability.

Section 81 p. p. 27
- (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity of the power supply system, by reason of its design and/or operation. These specific requirement...

AI summary The document outlines customer responsibilities in maintaining the integrity of the power supply system through specific operational requirements and agreements. It emphasizes considerations such as reliability, harmonic levels, voltage flicker, and stability in assessing potential impacts on the system.

REAL TIME PRICING BACK-UP INFORMATION p. p. 27
REAL TIME PRICING BACK-UP INFORMATION R P- 1 D A P T L A C R E D F N O TI A L U C R O 1 01 2 66 less: MC Revenue 69 Customer Cost 65 Avoided Costs 67 Fuel Cost Adj 70 HV 64 68 $0.12454 $0.12476 -$0.00022 $0.00020 $0.05579 $0.01066 $0.01068...

AI summary The document presents a table with various cost components and percentages related to real-time pricing backup information, including revenue, customer costs, avoided costs, fuel cost adjustments, and distribution and generation costs. The data appears to be part of a financial or regulatory analysis.

N-2Refiled 2011 Annually Adjusted Rates (AAR's) 12/8/2010 1 passage
REAL TIME PRICING BACK-UP INFORMATION p. pp. 31-53
r>-$0.000150 $0.0028110 $0.00281 $0.01411 $0.000021 OFF-PEAK $0.05525 $0.00279 $0.00002 $0.05806 $0.00364 $0.00113 $0.00020 $0.05579 $0.05957 $0.00537 $0.00149 $0.00022 $0.08075 $0.014109 $0.035378 $0.008742 $0.058229 $0.000875 $0.001663 $...

AI summary The text contains a series of numerical values and labels related to real-time pricing, including off-peak and on-peak rates, adjusted generation costs, transmission costs, distribution costs, customer costs, and other financial and operational metrics. It includes line items and categories related to energy costs and revenue.

06040Board Order approving 2011 One Part High Voltage Real Time Pricing Tariff 1 passage
Section 13 p. p. 2
- (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity ofthe power supply system, by reason of its design and/or operation. These specific requirements...

AI summary The document outlines customer responsibilities in maintaining power supply system integrity through load management and compliance with specific operational requirements set by a written agreement. Key considerations include reliability, harmonic levels, voltage flicker, and system stability.

06040Board Order approving 2011 One Part High Voltage Real Time Pricing Tariff 1 passage
Section 13 p. p. 2
- (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity ofthe power supply system, by reason of its design and/or operation. These specific requirements...

AI summary The document outlines customer responsibilities in maintaining power supply system integrity through operational agreements and specifies factors considered in assessing potential impacts on system reliability, including reliability, harmonic levels, voltage flicker, and stability.

06041Board Order approving 2011 One Part Extra High Voltage Real Time Pricing Tariff 1 passage
Section 13 p. p. 2
- (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity ofthe power supply system, by reason ofits design and/or operation. These specific requirements...

AI summary The document outlines customer responsibilities in maintaining power supply system integrity through load management and operating agreements. It specifies factors considered in assessing potential impacts on system integrity, such as reliability, harmonic levels, and fault levels.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →