E-23NSPI (IG) RIR-1 to RIR-10 - Redacted
9 passages
6 Figure 12: Combined Transmission & Distribution Advanced Stage Interconnection 7 Queue of June 29, 2018 Combined T/D Advanced Stage Interconnection Request Queue Publish Date: Wednesday, May 16, 2018 Queue Order IR# Request Date DD MMM Y...
AI summary The document presents a queue of advanced stage interconnection requests for combined transmission and distribution systems as of June 29, 2018. It includes details such as project numbers, request dates, counties, power capacities, interconnection points, types of projects, service dates, and statuses.
3 4 Figure 26: Conditions Determining Limits Export Import Amount of generation in Nova Scotia that can be rejected or run-back via SPS action Nova Scotia system load level (Import must be less than 22% of total system load) Reactive Power...
AI summary The text outlines conditions that determine limits for export and import in Nova Scotia's power system, including factors like generation capacity, reactive power support, and transmission line ratings. These conditions involve interactions with New Brunswick and other regions, as well as climatological and operational factors.
2020-2022 DSM IG IR-05 Attachment 1 Page 64 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 the L-6014 capacity that will be displaced with the removal of the Harbour 2 Crossing. The new infrastructure will need to be in service in 20...
AI summary The text discusses infrastructure projects related to transmission right of way widening and the installation of new electrical supply systems, including compliance gaps in the Bulk Electricity System (BES) at Nova Scotia Power, such as the refurbishment of a Static Var Compensator (SVC) at the 120H Brushy Hill substation.
2020-2022 DSM IG IR-05 Attachment 1 Page 91 of 158 2018 10 Year System Outlook Report Appendix B Page 17 of 84 BES /BPS Ele men ts Load Flow Continge encies Station Bkr line Bus Xfmr Var Gen Element Load Flow SPS х 710 88S, 88S-710 - х 711...
AI summary The document presents a table detailing elements of the Bulk Electric System (BES) and related components, including stations, breakers, lines, buses, transformers, and other infrastructure, as part of the 2018 10 Year System Outlook Report. It outlines load flow contingencies and special protection systems (SPS) for various locations.
2020-2022 DSM IG IR-05 Attachment 1 Page 95 of 158 2018 10 Year System Outlook Report Appendix B Page 21 of 84 , Ele mei nts 2021 Dynamics Conting gencies Station Bkr line Bus Xfmr Var Gen Element Dynamics SPS х 713 88S BBU 88S-713 - Х 720...
AI summary The document presents a technical table outlining elements of the 2018 10 Year System Outlook Report, focusing on power system components such as stations, breakers, lines, buses, transformers, and fault scenarios. It includes details on elements like 88S, 101S, and 1015, along with associated dynamics contingencies and special protection systems (SPS).
2017 NRIS Wind Study Ele mei nts 2021 Dynamics Contingencies Station Bkr line Bus Xfmr Var Gen Element Dynamics SPS х L6507_L6508 DCT L6507][L6508 79N - Dbl Cct х L6534_L7021 DCT L6534][L7021 - TOWERS х L7003_L7004 DCT L7003][L7004 G0 - IO...
AI summary The text presents a table titled 'Table 6: Dynamic Contingencies' from the 2017 NRIS Wind Study. The table lists various power system elements, including lines, transformers, and fault scenarios, along with associated dynamic contingency information.
2020-2022 DSM IG IR-05 Attachment 1 Page 121 of 158 2018 10 Year System Outlook Report Appendix B Page 47 of 84 PSS/e Load Data 2021LL Case Distri bution Ge neration (MW) Net MW at F. 1. 3.4 Bus # Bus Name MW Mvar Wind Biogas Biomass Hydro...
AI summary This table from the 2018 10 Year System Outlook Report provides load data for various buses in the Nova Scotia power system, including details on generation sources such as wind, biogas, and biomass, as well as net MW and reactive power (Mvar) values.
70% PSS/e Load Data 2021SUM Case Distri bution Ge neration (MW) Net MW at Fet Muser Bus # Bus Name MW Mvar Wind Biogas Biomass Hydro Tidal Total х% Est Mvar 199194 1H-WATER_ST 26.400 0.20 0.06 0.00 0.2 0.06 199194 1H-WATER_ST 26.400 3.46 1...
AI summary The text presents a table containing load data from PSS/e for 2021, including details on various buses, their names, and associated generation data such as wind, biogas, biomass, hydro, and tidal energy. The data includes megawatts (MW), megavolt-amperes (Mvar), and other related metrics.
2020-2022 DSM IG IR-05 Attachment 1 Page 153 of 158 2018 10 Year System Outlook Report Appendix B Page 79 of 84 2016 B DS/ RFS Flai mant 2021 Dynamics Conti ngencies ngencies S ,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, rage 17 67N L80...
AI summary The document presents a technical table with fault scenarios and system responses related to various generators and transmission lines in the Nova Scotia power system, including fault conditions and their implications for different components.