Matter: Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update
6 passages 5 documents

Distribution across all matters →

N-2NSPI (CA) RIR 1 to 7 - Redacted 1 passage
2025 Evergreen IRP Action Plan and Roadmap Update (NSEB M12247) NSPI Responses to Consumer Advocate Information Requests
2025 Evergreen IRP Action Plan and Roadmap Update (NSEB M12247) NSPI Responses to Consumer Advocate Information Requests 1 Request IR-2: 2 3 RE: Action Plan Item 2b 4 5 Please provide a description of data that NS Power monitors, or antici...

AI summary NSPI responds to a request for information on data monitored to understand electrification impacts. The response references the 2025 IRP Action Plan Update and mentions the use of annual load forecasts, SCADA, and AMI data for monitoring. Some data, like interconnection requests, are accessible on the NS Power Oasis site.

N-4NSPI (IG) RIR 1 to 10 1 passage
NON-CONFIDENTIAL p. p. 5
NON-CONFIDENTIAL 1 Request IR-1: 3 Automatic Generation Control (AGC) functionality required from new wind farms 4 (beginning with the Rate Base Procurement projects), which will reduce curtailment 5 relative to what would be achieved by f...

AI summary The document discusses requests related to Automatic Generation Control (AGC) functionality for new wind farms and modeling of transmission and distribution systems. It includes questions about system modeling, feeder peak patterns, and data usage, along with responses from NSPI regarding modeling practices and data collection plans.

N-6NSPI (NSEB) RIR 1 to 9 2 passages
1 import/export opportunities from a Phase 2 are not being factored into NS Power's resource or transmission planning at this time.[1](#page-6-0) 2 p. pp. 4-6
1 import/export opportunities from a Phase 2 are not being factored into NS Power's resource or transmission planning at this time.[1](#page-6-0) 2 1 DOE IR-009, NS-NB Reliability Intertie Project application proceeding (M12217), May 30, 2...

AI summary NS Power has identified overloaded feeders and substation transformers in its 2024 Feeder Assessment and System Load Snapshot reports, which are expected to become overloaded within the next 5-10 years. These assessments are directional and not detailed in terms of capital requirements, but they guide further planning studies to identify necessary upgrades and evaluate alternative solutions.

Preamble p. p. 6
This report provides a moment in time summary of substation loading (and an estimation on average feeder loading) for the system peak that occurred February 21st, at 7:30am. This 2024 System Snapshot is used to flag potential substation, f...

AI summary This report provides a snapshot of substation and feeder loading during the system peak on February 21st, 2024, identifying transformers operating above 100% of their nameplate rating and feeders with average loading above 300A. It outlines methods used to determine loading conditions and discusses how Distributed Energy Resources (DERs) affect substation load calculations. The report also references the Capital Expenditure Justification Criteria for transformer upgrades.

N-7NSPI (SBA) RIR 1 to 18 1 passage
NON-CONFIDENTIAL p. pp. 10-12
NON-CONFIDENTIAL 1 Request IR-4: 20 Brushy Hill is currently under review. 21 22 2. Adjust corridor flow limits related to contingency loss of L-6503 with L-8003 out 23 of service. 24 25 Contingency loss of L-6503 is noted to cause overloa...

AI summary The document discusses adjustments to corridor flow limits and Remedial Action Schemes (RAS) to address potential overloads and accommodate future generation additions. It highlights short-term solutions like limiting corridor flows and long-term planning for upgrades as the power system evolves.

98223IG (NSPI) IR 1 to 10 1 passage
1 2025 M12247
19 1 2025 M12247 2 Reference: N-1, IRP Action Plan Update, Item 1: Regional Integration, p.18-20. 3 4 5 (a) With the Reliability Tie being integrated into the system, please provide an update on how wind curtailment is being modelled withi...

AI summary The document text includes several requests related to the Integrated Resource Plan (IRP) Action Plan Update, focusing on wind curtailment modeling, renewable curtailment reduction efforts, transmission and distribution system modeling, and the Provincial Green Choice Program. These requests aim to gather updates and insights from NSPI.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →