HomeDistributionM12282Evidence
Topic/Matter Intersection

Topic:"Distribution" in M12282

Matter: EfficiencyOne - New Benefit Cost Analysis Test for Evaluating Demand Side Management (DSM) Plans Application for Approval of New Benefit Cost Analysis Test for Evaluating Demand Side Management (DSM) Plans
5 passages 1 document

Distribution across all matters →

E-1Notice of Application and Evidence 5 passages
Section 117
with environmental regulations and Direct Testimony of David G. Hill, Ph.D. / May 16, 2025. Page 10 On Behalf of EfficiencyOne DATE FILED: May 16, 2025 Page 12 of 18 EfficiencyOne Benefit-Cost Analysis Test Application Appendix A Data Sour...

AI summary EfficiencyOne's benefit-cost analysis test application discusses data sources and references for transmission and distribution capacity, including the use of forward-looking avoided costs from the 2023-2025 DSM Plan and the allocation of costs between transmission and distribution.

Section 1203
) as system resources.11 The working group’s review and discussion of electric utility system impacts applicability and materiality to the various DERs are summarized in Table 2 and Table 3. Table 2: Summary of Generation, Transmission and...

AI summary The text discusses the review and discussion of electric utility system impacts related to various DERs, summarizing the impacts on generation, transmission, and distribution systems in Table 2 and Table 3.

Section 1259
energyfuturesgroup.com 37 shaded cells indicate an impact that was not included or only partially included in the 2023- 2025 DSM Plan BCA test. Table 9: Generation, Transmission and Distribution USIs Impact Type Impact EE DR DG DS EV BE En...

AI summary The table outlines the impact of various energy efficiency (EE), demand response (DR), distributed generation (DG), demand-side management (DS), electric vehicles (EV), and building efficiency (BE) initiatives on generation, transmission, and distribution utility system impacts (USIs). Shaded cells indicate partial or no inclusion in the 2023-2025 DSM Plan BCA test.

Section 1260
Distribution Distribution O&M       Distribution Voltage NM NM NM NM NM NM Key  Impacts that are both applicable and material NA Impacts that are not applicable to a given DER or in NS market NM Not material, or not large enough to...

AI summary The document discusses the impact of DERs on distribution and voltage, noting that some impacts are material while others are not. It also references two tables summarizing system impacts and costs associated with DSM services, with Table 10 including E1 costs.

Section 1302
Costs Electricity System Increased Capacity Avoided Electric System Electric $/MWh MWh Energy Costs Peak kW $/kW-yr. T&D Capacity Costs System Costs

AI summary The text presents a table outlining various costs related to the electricity system, including energy costs, peak kW costs, transmission and distribution (T&D) costs, and system costs. The table includes metrics such as $/MWh, MWh, and $/kW-yr.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →