pillway, and a powerhouse with two units. The sluiceway has six bays designed to direct the flow of water. Stoplogs are removable barriers used to control the flow and level of water in the sluiceway. The application noted that during a 20...
AI summary The document describes a stoplog replacement project at a powerhouse site in Nova Scotia, where stoplogs in Bays 1 and 6 were found to be jammed during a 2024 inspection. NS Power decided to replace all stoplogs in all six bays due to structural degradation and the need for safe water management.