C0080228 Attachment 1 Page 4 of 7 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 9
C0080228 Attachment 1 Page 4 of 7 REDACTED (CONFIDENTIAL INFORMATION REMOVED) For example, each parallel has 14 groups so the jumper between group 7 and 8 would be cut to isolate the section and make two segments. If group 1-7 showed a gro...

AI summary The text describes a method for isolating ground faults in electrical systems by cutting jumper wires between groups of coils and testing segments. It also notes that the stator winding was susceptible to moisture, prompting NSPI to install heaters to mitigate this issue.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →