HomeDistributionM12623Evidence
Topic/Matter Intersection

Topic:"Distribution" in M12623

Matter: Northeast Power Coordinating Council (NPCC) - Fourth Quarter 2025 for Approval of Revised Regional Reliability Criteria
2 passages 2 documents

Distribution across all matters →

N-1Application - Directory 5 filing 1 passage
4.2 Modification to the SAR Procedure p. p. 30
4.2 Modification to the SAR Procedure The SAR procedure is modified to allocate portions of the total delivery to Balancing Authorities in addition to the directly connected Balancing Authority during an ordinary simultaneous activation of...

AI summary The SAR procedure is modified to allocate energy to Balancing Authorities during a contingency, with shares determined based on mutual assistance principles. When a tie line trips, the directly connected Balancing Authority may initiate the SAR process, and energy is shared according to pre-defined rules. This ensures that all Balancing Authorities contribute to and receive assistance for their portion of the contingency.

N-2Application - Directory 7 filing 1 passage
5.4 Criteria for Dependability and Security p. p. 17
unless otherwise noted per criterion 5.2.) The RAS Groups may be supplied from separate secondary windings on one transformer or potential device, provided all of the following criteria are met: - 5.7.2.1 Complete loss of that voltage tran...

AI summary The document outlines criteria for ensuring the dependability and security of the RAS (Remedial Action Scheme) and its associated RAS Groups , including requirements for transformer secondary windings and DC power supply design to prevent single points of failure.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →