5.2 Response Trigger Levels \ \ Once triggered, a Level 4 restoration response must remain in place until power is restored to all customers affected by the storm event. If a Level 3 or Level 4 response is recommended, the Storm Lead initi...
AI summary The document outlines the conditions under which a Level 4 restoration response must be maintained until all affected customers have their power restored following a storm event. It also specifies that the EOC is activated only for Level 3 or Level 4 responses, while Regional Operations lead efforts for lower-level responses.
6.6.5 Control Centre Operations Lead The Control Centre has the responsibility for the integrity and the safe and effective operation of the Transmission and Distribution Systems. The Control Centre follows its System Operating Procedures...
AI summary The Control Centre Operations Lead is responsible for ensuring the safe and effective operation of the Transmission and Distribution Systems, providing the EOC with information on power system performance, and coordinating with the RPP team. The EOC, in turn, ensures timely information sharing with the Control Centre regarding restoration efforts and event impacts.
Specific Accountabilities – Transmission Operations Lead: - Ensure that all safety and security procedures are being followed and that any significant risks and hazards identified are addressed - Liaise with the Damage Assessment Leads to...
AI summary The Transmission Operations Lead is responsible for ensuring safety and security procedures, liaising with various leads for resource coordination and damage assessment, developing restoration plans, and communicating progress to the EOC Team. They also manage equipment settings, document storm damage, and participate in post-event reviews.
APPENDIX 7 – Post-Event Review List 4.4 Customers impacted Transmission Operations Lead 5 Substations – Transmission Operations Lead 5.1 Substation equipment damaged, types of damage and repairs Transmission Operations Lead 5.2 Cost of rep...