1. Computational Load Site p. p. 25
"primarily contains information technology infrastructure"; and 3) the site is "supplied through electrical equipment that is connected to the BPS." Each of these concepts is discussed in turn below. As noted in NERC's consideration of com...

AI summary The text defines the criteria for identifying a 'Computational Load Site,' emphasizing that it must primarily contain information technology infrastructure and be connected to the Bulk Power System (BPS). It clarifies that the 'single location' concept is used to prevent the aggregation of geographically close but operationally unrelated sites for registry criteria thresholds. While factors like ownership and shared infrastructure are considered, the definition is not strictly tied to real estate boundaries or parcels.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →