E-3ENSC 2011 DSM Evaluation Report prepared by Econoler 10 passages
Section 418
........................................................................... 4 Figure 3: Light Output Equivalency for Incandescent Lamps to CFLs .................................................. 37 Ref.: 5725 v Efficient Products – Retail...

AI summary The 2011 evaluation of the Retail Markdown Program (RMP) in Nova Scotia assessed its impact through interviews, on-site visits, and surveys. The program, known as 'Plug Into Savings,' collaborated with 12 retail chains to offer discounts on energy-efficient products such as LED lamps, CFLs, and thermostats during spring and fall markdown periods.

Section 739
erifying that the end-users were using the timer. This timer is specific to an energy-efficient power bar, and not using it prevents the reduction of standby power and thus the achievement of savings. The table below shows the percentages...

AI summary The text discusses the verification of energy-efficient product usage, specifically focusing on the installation rates and percentages of products installed through a program. It highlights discrepancies between on-site visits and installation rates, particularly for certain product categories, and notes that a 100% installation rate was applied where precision was too low.

Section 762
Program 1. Document important program practices: Manual – The disposal of old products should be documented in the program manual to Content have a complete description of the implementation process. – There are no instructions related to...

AI summary The text discusses the need for improved documentation in program manuals, specifically regarding the disposal of old products, energy source information for installations, and the provision of a 'base case' for calculating savings. It also highlights the importance of documenting parameters used to estimate program objectives, including distortion and interactive effects.

Section 834
port source used for domestic hot water heating. This way, it will be possible to confirm that product replacements have only been made where domestic hot water is electrically heated. > Collect information for establishing base cases: The...

AI summary The text outlines steps for collecting information to establish base cases and line loss factors for program evaluation. It emphasizes the importance of tracking product replacements, particularly for electrically heated domestic hot water systems, and suggests collecting specific data such as old lamp wattage and thermostat types for accurate savings estimation.

Section 870
ation to participants on how to use the timer on the power bar. To maintain measure sustainability, participants need to understand the necessity of using the timer to benefit from the energy savings. The on-site visits were scheduled main...

AI summary The evaluation report discusses the need for more on-site visits to accurately determine the installation rate of power bars with timers in the MURR program. It also outlines the energy-to-demand ratio used to calculate demand savings for the program.

Section 1006
dual rental units of multi-unit residential buildings while the remainder corresponds to installations conducted in commercial buildings or in common areas of multi-unit residential buildings. In order to cover the main products installed...

AI summary The text discusses the categorization of energy-saving products installed in rental units and commercial buildings, with a focus on how site visits were allocated based on the percentage of total energy savings achieved by each product category. Categories with less than 1% of total savings did not receive on-site visits, despite some categories achieving higher savings post-sampling.

Section 1478
mind, Econoler believes that on-site visits aiming at validating the installation rate of the Direct Install products should be performed under future project evaluations. LI-R2. Review HOT2000 models on a random basis: The Evaluator or th...

AI summary Econoler suggests that future project evaluations should include on-site visits to validate the installation rate of Direct Install products. Additionally, a random review of HOT2000 models and detailed record-keeping by energy advisors is recommended, with a focus on projects with outlier EnerGuide ratings.

Section 1589
Program 1. Revise the current process flow chart found in the program manual: The Manual program process flow chart illustrated in the program manual contains names of Content individuals in some places. The Evaluator recommends changing t...

AI summary The Evaluator recommends revising the program manual to clarify process flow chart terminology, document EnerGuide audits and trainer activities, monitor outreach activities with performance indicators, provide a 'base case' for gross savings calculations, and document parameters used for program objectives.

Section 2022
OFFICE CONTACT - CONTINUE TO I2] _Don’t know [CONTINUE INTERVIEW WITH STORE MANAGER/HEAD OFFICE CONTACT - CONTINUE TO I2] _Refused [THANK AND TERMINATE] Confidentiality Ref.: 5725 28 Smart Lighting Choices Program Efficiency Nova Scotia Co...

AI summary The text outlines an interview process for collecting data on the sales of high-performance and low wattage T8 lamps under the Smart Lighting Choices Program. The interview includes confidentiality and recording notices, and asks about sales trends and potential reasons for changes in sales volume.

Section 2028
propriate amount? E8. Do you promote HPT8 ballasts as part of the Smart Lighting Choices Program? Is part of the ¢25 incentive used for marketing purposes? GENERAL IMPACT OF PROGRAM G1. Overall, do you think that the Smart Lighting Choices...

AI summary The text includes interview questions regarding the Smart Lighting Choices Program, its impact on businesses, and the use of incentives. It also includes an on-site visit protocol for evaluating the program's effectiveness.

E-9(r)ENSC (Consumer Advocate) Responses to IR-1 to IR-27 (REVISED) 1 passage
- 10 numbers refer to the numbers as listed in Appendix I of each evaluation report. p. p. 133
- 10 numbers refer to the numbers as listed in Appendix I of each evaluation report. Efficient Products – Appliance Retirement ARet 5: Facilitate tracking of savings by using adjusted unitary savings values. All tracking sheet recommendati...

AI summary The document outlines actions taken and planned by ENSC related to appliance retirement and replacement programs, including tracking sheet improvements, on-site metering for specific appliances, and promotional support for independent stores. Certain programs, like Appliance Replacement, are not being offered in 2012.

120102012 DSM Evaluation Reports 1 passage
Preamble p. p. 32
In addition, Econoler investigated on the type of application used to calculate the savings associated with the installation of a heavy duty timer around the house. There are several possible usages for a heavy duty timer, and pool pump se...

AI summary Econoler evaluated the application of heavy duty timers, noting that pool pumps are a typical use case. Due to low sales volume, they recommend maintaining the unitary savings value of 384 kWh per year, as established in the 2011 OPA report.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →