HomeEfficiency MaineM12932Evidence
Topic/Matter Intersection

Topic:"Efficiency Maine" in M12932

Matter: Nova Scotia Power Inc. (NSPI) - Time-Varying Pricing Pilot Program - 2024/25 (Year Four) and 2025/26 (Year Five) Evaluation Reports
2 passages 1 document

Efficiency Maine across all matters →

N-1Evaluation Report 2 passages
III.2.5 Match Accuracy p. pp. 135-136
III.2.5 Match Accuracy Once a final control group has been established, the quality of the control group selection match is defined by the 'Match Accuracy', refer to equation ([4)](#page-136-2). $$Match\ Accuracy = \left(1 - \frac{\overlin...

AI summary Match Accuracy is calculated using the formula provided, which compares the average absolute difference between treatment and control power data points over a 96-hour period to the average treatment power. This metric evaluates the quality of the control group selection in a study.

IV.1.2 E1 Program Balancing (Phase 1) p. p. 147
IV.1.2 E1 Program Balancing (Phase 1) No balancing for E1 program effects was completed. As a result, the effects associated with E1 programs were not controlled for and could influence TVP EM&V results. Subsequent evaluations (i.e. Phase...

AI summary No balancing for E1 program effects was completed in Phase 1, which may have influenced TVP EM&V results. Subsequent phases have addressed this by balancing control group selection for E1 participation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →