Topic/Matter Intersection

Topic:"Electricity Generation" in M03347

Matter: P-194 - NSPI - 10 Year System Outlook 2010-2019 - June 30, 2010
2 passages 1 document

Electricity Generation across all matters →

N-110 Year System Outlook 2010-2010 Report dated June 30, 2010 6/30/2010 2 passages
Table 4 – 2010 Generating Resources (Data sourced from 2009 IRP Update Assumptions) p. p. 1
Table 4 – 2010 Generating Resources (Data sourced from 2009 IRP Update Assumptions) Plant/System Fuel Type Winter Net Capacity Avon Hydro 7.6 Black River Hydro 23 Lequille System Hydro 26 Bear River System Hydro 39.5 Roseway Hydro 1.6 Tusk...

AI summary Table 4 presents the 2010 generating resources in Nova Scotia, detailing the capacity of various hydroelectric, steam, combustion turbine, and renewable energy plants. It includes data on fuel types and capacities, with some notes on performance levels and capacity calculations.

5.0 NEW GENERATING FACILITIES p. p. 1
5.0 NEW GENERATING FACILITIES

AI summary The section titled '5.0 NEW GENERATING FACILITIES' likely addresses regulatory considerations for new power generation projects in Nova Scotia, though no detailed content is provided in the excerpt.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →