Matter: P-188 - NSPI Regulation 3.6 - Net Metering - Request approval of the revised Regulation 3.6Enhanced net metering service, in compliance with recent legislative changes to the Electricity Act.
9 passages 6 documents

Electricity Generation across all matters →

N-1Letter, Application and Evidence filed by NSPI 11/1/2010 2 passages
Preamble p. p. 0
2 3 Under the existing Regulation 3.6, a customer's generating capacity under net 4 metering was limited to up to 100 kW to offset part or all of the customer's own 5 electrical requirements. The current net metering program has a peak dem...

AI summary The document discusses proposed changes to net metering regulations in Nova Scotia, increasing the maximum generating capacity from 100 kW to 1 MW. It outlines two classes of service and explains the need for updated interconnection processes for larger generators.

3.6.6 S pecial Conditions p. p. 27
3.6.6 S pecial Conditions - a) Special conditions in this regulation do not supersede, modify or nullify special conditions accompanying the otherwise-applicable metered rate schedules. - b) A Qualifying generating facility must meet the f...

AI summary This section outlines special conditions for Net Metering electric service, including requirements for Qualifying generating facilities, location constraints, and customer responsibilities. It also mentions grandfathering for existing net metering customers and deleted content related to metering systems and ownership proof.

N-2NSPI IR Responses HRWC 1/26/2011 2 passages
\ \ The general service area is a summary and does not describe all areas served.
\ \ The general service area is a summary and does not describe all areas served. 1 Request IR-2: 20 compliance with any enactment regulating emissions. 21 22 Response IR-5: 23 24 (a) Section 3A of the Amended Electricity Act1 states that,...

AI summary The document discusses the transfer of emission credits from net metering customers to Nova Scotia Power Inc. (NSPI) under Section 3A of the Amended Electricity Act. NSPI argues that this transfer helps them comply with emissions regulations by reducing fossil fuel energy use and associated GHG emissions.

1 Response IR-8: (cont'd)
1 Response IR-8: (cont'd) 2 3 (a) NSPI has not conducted any such studies. Since customers may choose to subscribe to 4 net metering based on many factors specific to their own circumstances, NSPI is not able 5 to predict which customers m...

AI summary NSPI states that it has not conducted studies on net metering subscription predictions, refers to another response for further information, and explains that its program complies with the Amended Electricity Act, which allows multiple meters under one account and permits self-generated electricity for personal use, not for grid distribution.

N-3NSPI IR Responses Multeese 1/26/2011 2 passages
NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 Request IR-1: 2 3 At line 15, page 6, NSPI states that it will work with customers to help ensure their 4 generator is sized to meet the expected annual consumption of the customer. Assuming the 5 customer is proposing t...

AI summary The document discusses a regulatory inquiry regarding the maximum unit size of wind turbines for two customers based on their annual demand and consumption. NSPI calculates the maximum generator size for each case, referencing the Amended Electricity Act and a related inquiry.

NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 Request IR-3: Admin Cost ¢/kWh 0.50 Energy Charge ¢/kWh 6.226 1P-RTP adders units Proposed Rate RTP - Distribution Class Off Peak ¢/kWh 2.146 RTP - Distribution Class On Peak ¢/kWh 8.183 1 Request IR-4: 2 3 It is noted a...

AI summary The document discusses a request and response related to the confirmation of a proposed regulation by NSPI. NSPI met with NSDOE and received verbal confirmation that the draft regulation aligns with the Amended Electricity Act.

N-6NSPI Reply Submission 2/23/2011 1 passage
October 2010 p. p. 46
October 2010 Proclamation of legislation and enactment of regulations: Amendments that were made to the Electricity Act will be proclaimed and the approved regulations enacted. This enables actions and programs under the Renewable Electric...

AI summary Amendments to the Electricity Act have been proclaimed, enabling the implementation of the Renewable Electricity Plan, including the enhanced net metering program and COMFIT.

06870Board Order 1 passage
3.6.6 Special Conditions p. p. 2
3.6.6 Special Conditions - a) Special conditions in this regulation do not supersede, modify or nullify special conditions accompanying the otherwise-applicable metered rate schedules. - b) A Qualifying generating facility must meet the fo...

AI summary This section outlines special conditions for Net Metering service, including requirements for Qualifying generating facilities, compliance with safety and performance standards, customer-generator responsibilities, and procedures for applying and terminating the service.

06618Board Decision 3/21/2011 1 passage
1. Distribution Zone
1. Distribution Zone [33] Section 3A(2)(d) of the amended Electricity Act states that customers may have multiple meters under one account within a defined distribution zone, however, the Act does not define "distribution zone". NSPI inter...

AI summary The document discusses the definition of 'distribution zone' under the amended Electricity Act, NSPI's interpretation of the term, and the Board's agreement with NSPI's definition. It also addresses scenarios where distribution zone boundaries may change, impacting net metering eligibility.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →