Topic/Matter Intersection

Topic:"Electricity Generation" in M10473

Matter: E-ENS-R-22 EfficiencyOne 2023-2025 Demand Side Management (DSM) Plan Application
8 passages 7 documents

Electricity Generation across all matters →

E-12E1(NSUARB) RIR-1 to RIR-41 1 passage
Section 346
ric) each propose to implement an EV load management offering by summer 2022, they do not describe the proposed offerings in their Three-Year Plans (Statewide Plan, Exh. 1, at 106).82 81 During the 2019-2021 Three-Year Plans term, NSTAR El...

AI summary The text discusses the implementation of EV load management offerings by NSTAR Electric and National Grid (electric) during the 2019-2021 Three-Year Plans term, noting that they did not describe these offerings in their Three-Year Plans. NSTAR conducted research on EV signal dispatch, while National Grid used a telematics-based approach.

E-12-(i)NSUARB IR-17 Attachment 2_ACEEE’s Entire State Database - Excel 2 passages
Section 253
s within the District. Owners of cogeneration equipment used for developments of more than one million square feet are eligible if the fuel used to generate power was previously subject to a D.C. tax. Net metering: District of Columbia Net...

AI summary The District of Columbia supports combined heat and power (CHP) through various policies, including net metering, technical assistance programs, and resiliency-centered microgrids. The DC Sustainable Energy Utility provides evaluation and review services, and the Public Service Commission is exploring a CHP-centered microgrid pilot project.

Section 783
040. In January 2020, Gov. Cuomo set a goal for five other major transit operators to convert 25% of their fleets to all-electric buses by 2025 and 100% of their fleets to all-electric buses by 2035. State agencies are also required to pur...

AI summary In January 2020, Gov. Cuomo established goals for transit operators to convert their bus fleets to all-electric vehicles by 2025 and 2035. Additionally, state agencies are required to purchase or lease vehicles with high fuel efficiency, as mandated by Executive Orders 4 (2008) and 2 (2011).

E-14E1(Synapse) RIR-1 to RIR-37 1 passage
Final Technical Submission p. p. 237
Final Technical Submission Updated energy model following completion of construction

AI summary The document presents an updated energy model following the completion of construction, as part of a final technical submission.

E-24-(i)John Athas CV 1 passage
Cambridge Energy Research Associates Cambridge, MA p. p. 0
Cambridge Energy Research Associates Cambridge, MA Associate Director, North American Electric Power 2001–2005 Eastern North American Energy Service Principal 2002-2005 - Developed independent primary research on various aspects of power m...

AI summary Cambridge Energy Research Associates conducted research on Eastern U.S. and Canadian power markets from 2001–2005, focusing on price outlooks, market structures, supply-demand balances, capacity markets, and generation technologies.

E-25-(i)Resume of A. Napoleon 1 passage
PUBLICATIONS p. p. 0
rd Island Energy Corporations' 2018 - 2021 Energy Efficiency and Conservation Plan. Synapse Energy Economics for Carr, Stevenson and MacKay as Counsel to the Island Regulatory and Appeals Commission. Takahashi, K., A. Napoleon. 2018. Synap...

AI summary The text lists Synapse Energy Economics' reports and analyses for various regulatory bodies and organizations, covering energy efficiency, rate cases, and DER valuation. Key entities include Synapse Energy Economics and multiple regulatory commissions. Topics include energy efficiency, rate analysis, and DER system value assessments.

E-25-(ii)Resume of K. Takahashi 1 passage
PUBLICATIONS p. p. 0
ynapse Energy Economics. 2012. Economic and Environmental Analysis of Residential Heating and Cooling Systems: A Study of Heat Pump Performance in US Cities. Prepared for a HVAC manufacture company. Hornby, R., D. White, T. Vitolo, T. Comi...

AI summary The text lists studies by Synapse Energy Economics and collaborators on energy efficiency, renewable energy, and power sector sustainability, commissioned by organizations such as NYSERDA, the Vermont Department of Public Service, and the Civil Society Institute. Topics include heat pump performance, portfolio standards, and grid infrastructure analysis.

E-30E1 Compliance Filing 2023-2025 with Appendix A-D FINAL 1 passage
Section 118 p. p. 63
Annual avoided costs of energy and capacity and annual avoided CO₂e emissions were provided by NS Power, from the 2020 IRP using the Base level of DSM for Scenario 2.0C. Avoided costs of transmission and distribution were provided by NS Po...

AI summary The text discusses avoided costs and CO₂e emissions from NS Power's 2020 Integrated Resource Plan (IRP) and 2021 transmission and distribution costs. It details cost-effectiveness ratios using present values and outlines investment requirements for demand response (DR) and energy efficiency (EE) programs, including definitions of TRC and PAC.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →