DRAFT RESULTS The draft modeling results are organizedasfollows: - The first slide for each scenario includes charts for Installed Capacity (MW), Generation (GWh), UCAP PlanningReserve Margin (PRM, %) and GHG Emissions(MT) - o Capacity cha...
AI summary The draft modeling results present scenario analyses with charts on Installed Capacity, Generation, UCAP PRM (maintaining a 9% minimum, per 2020 IRP), and GHG Emissions. Each scenario's second slide details economics (NPVRR), GHG emissions over time, input assumptions, and observations on capacity changes, generation, emissions, and costs.
CE1-E1-R1 NZ 2035-CURRENT POLICY AND TRENDS -ATLANTIC LOOP Preliminary Scenario Metrics and Evaluation 26 Year NPVRR ($MM 2025$) $19,011 Key Input Assumptions and Observations 26 Year NPVRR with End Effects ($MM 2025$) $26,005 Capacity Exp...
AI summary The document outlines preliminary scenario metrics and evaluation for the 2035-current policy and trends related to the Atlantic Loop. It includes net present value of rate returns, capacity expansion plans, and carbon emissions projections from 2025 to 2050. Key assumptions include the phase-out of coal by 2030, the addition of renewable energy sources, and the implementation of carbon pricing.