ctrical code standards. Nevertheless, in order to be responsive to its customers' safety concerns, RELC contacted Strum Engineering to assess compliance with the relevant electrical code requirements. Strum reviewed the matter in considera...
AI summary RELC contacted Strum Engineering to assess compliance with electrical code standards regarding high voltage conductor clearances. Strum found no compliance issues, noting that clearances are measured from the conductor toward the building. RELC also states that the deck was built after the distribution lines, so changes to the pre-existing configuration are not required.